Fall protection trigger height
In construction under OSHA 29 CFR 1926.501, employers must provide fall protection when workers are exposed to falls of 6 feet or more to a lower level.
Ladder 4:1 rule
An extension ladder is set so the base is 1 foot out for every 4 feet of working height, and it extends 3 feet above the landing point.
Hot work fire watch
A fire watch is posted during welding, cutting, or grinding and maintained for at least 30 minutes after the work ends to catch smoldering fires.
SDS accessibility
Under OSHA Hazard Communication, a Safety Data Sheet for every hazardous chemical on site must be readily accessible to workers during their shift.
Aviation snip color code
Left-cut snips are red and cut counterclockwise curves, right-cut snips are green and cut clockwise curves, and straight snips are yellow.
Pittsburgh lock machine
A lockformer machine rolls the Pittsburgh seam, a folded interlocking joint with a pocket that joins two duct sections longitudinally.
Box and pan brake
A brake with removable finger sections that lets the operator form boxes, pans, and return flanges that a plain bar folder cannot produce.
Hand seamer capacity
Hand seamers (hand brake pliers) fold flanges, and the jaw depth sets the maximum flange width, commonly 1 inch for standard models.
Third-angle projection
In North American third-angle projection, the top view is placed above the front view and the right side view is placed to the right of the front view.
Architectural scale 1/4 inch
At 1/4 inch = 1 foot, one quarter inch on the drawing equals 12 actual inches, so a measured 3 inches equals 12 feet actual.
Parallel line development
This layout method develops prisms and cylinders by dividing the surface into parallel lines; the stretch-out of round duct equals pi times the diameter.
Radial line development
This layout method develops cones and pyramids by radiating lines from an apex, and it is used for round and square-to-round transitions.
Bend allowance formula
Bend allowance equals (pi divided by 180) times the bend angle times (inside radius plus K times thickness), with K typically between 0.33 and 0.50.
Bend deduction formula
Bend deduction equals two times the setback minus the bend allowance, and subtracting it from the sum of outside dimensions gives the flat pattern length.
Shear clearance rule
Blade clearance on a squaring shear is set to roughly 5 to 10 percent of material thickness; wrong clearance causes edge cracking or heavy burrs.
Metal fume fever
Welding galvanized steel releases zinc oxide fume that causes flu-like metal fume fever, so ventilation and coating removal at the weld zone are required.
CFM from velocity and area
Airflow in cubic feet per minute equals velocity in feet per minute multiplied by duct cross-sectional area in square feet.
Velocity pressure formula
Velocity pressure in inches of water column equals velocity in feet per minute divided by 4005, then squared, for standard air at 0.075 lb per cubic foot.
Sensible heat equation
Sensible heat in BTUH equals 1.08 times CFM times the dry-bulb temperature difference for standard air at sea level.
Duct aspect ratio limit
Aspect ratio is the long side of a rectangular duct divided by the short side; keeping it at or below 4:1 limits friction and noise.
Hanger spacing rule
Horizontal rectangular duct is commonly supported at 8-foot maximum intervals, with closer spacing for wide duct; follow SMACNA and the project specification.
SMACNA Seal Class A
Seal Class A requires sealing of all transverse joints and all longitudinal seams, the most stringent of the three SMACNA seal classes.
Fire damper requirement
A fire damper is installed where a duct penetrates a fire-rated wall or floor assembly, and it must remain accessible for inspection and testing.
Flexible duct sag limit
Flexible duct should sag no more than 1/2 inch per foot of span and should not be compressed, because both raise pressure drop sharply.
Roof pitch to angle
A 4:12 pitch rises 4 inches per 12 inches of run, an angle of about 18.4 degrees; the slope factor is the rafter length divided by the run.
Step flashing location
Step flashing is installed in overlapping pieces where a roof plane meets a sidewall, working with the shingles or panels to shed water.
Standing seam thermal movement
Steel expands about 0.0000065 inch per inch per degree Fahrenheit, so standing seam clips must allow panels to move without buckling.
EPDM washer fastener
Metal roofing screws carry an EPDM washer that seals the hole; overdriving crushes the washer and creates a leak path.
SMACNA duct standards
SMACNA publishes the HVAC Duct Construction Standards for rectangular and round duct, plus the Architectural Sheet Metal Manual and the Duct Leakage Test Manual.
UL 555 fire dampers
UL 555 is the standard for fire dampers, while UL 555S covers smoke dampers and UL 181 covers factory-made air ducts and connectors.
NFPA 90A duct clearance
NFPA 90A governs commercial air handling systems and generally requires duct to be spaced from combustible material unless listed for reduced clearance.
Submittal approval rule
Shop drawings and product data must be reviewed and approved before fabrication begins; a submittal register tracks the status of each item.