NCCER Signal Person study materials
NCCER Signal Person study resources

NCCER Signal Person flashcards

NCCER Signal Person · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Stop hand signal
Extend arm horizontally, palm down, and move arm back and forth. This signal must be obeyed immediately, regardless of the source or other signals being given.
Emergency stop signal
Extend both arms horizontally, palms down, and move them rapidly back and forth. Use only when there is immediate danger to personnel or property.
Hoist hand signal
With forearm vertical and forefinger pointing up, move hand in small horizontal circles. This signals the operator to raise the load.
Lower hand signal
With arm extended downward and forefinger pointing down, move hand in small horizontal circles. This signals the operator to lower the load.
Dog everything signal
Clasp hands in front of the body. This signal suspends the operation and holds the load until a new signal is given.
Bridge travel signal
Point with arm in the direction of travel. Used to signal the crane bridge to move left or right along the runway.
Trolley travel signal
Point with arm in the direction of trolley movement. Used to signal the trolley to move forward or backward along the bridge.
Hand signal visibility
The signal person must be in direct line of sight of the operator. If the operator loses sight of the signal person, the operator must stop until communication is restored.
Voice signal clarity
Voice signals must be distinct and clearly understood. Use standard terms like hoist, lower, stop, and emergency stop; avoid slang or ambiguous words.
Radio check
Before operations, all parties must confirm the radio channel and conduct a radio check to ensure clear communication. Test equipment at the start of each shift.
Radio communication loss
If radio communication is lost or unclear, the operator must stop operations until communication is restored. Do not guess or assume commands.
Designated signal person
Only one designated signal person should give signals at a time. The operator must know who is in charge; multiple signal persons can cause confusion.
Emergency stop via radio
Emergency stop must be communicated immediately by any means available, including radio. The operator must obey without question.
Radio equipment testing
Radio equipment must be tested at the start of each shift. Batteries must be charged, and spare batteries should be available. Malfunctioning equipment must be replaced.
Voice signal position
The signal person must be positioned where they can see the load, rigging, and operator, and be within hearing distance for voice signals.
Load chart capacity
The signal person must know the crane's load chart. Capacity decreases as radius increases; never signal a lift that exceeds the chart capacity for the given radius.
Sling tension formula
For a symmetric two-leg lift, tension per leg = load / (2 × sin(angle from horizontal)). Tension increases as the angle decreases.
Rigging inspection
Before signaling a lift, verify the load is properly rigged and balanced. Check for loose or unsecured items and inspect slings and hardware for damage.
Swing radius hazard
Keep personnel clear of the crane's swing radius. The signal person must ensure no one is under the load or in the swing path during operation.
Two-blocking prevention
Two-blocking occurs when the load block contacts the boom tip. The anti-two-block device must be functional; stop hoisting when the load approaches the boom tip.
Power line minimum approach
Never signal a lift that brings any part of the crane or load within the minimum approach distance to power lines. Know the required distance for the voltage.
Wind speed limits
Stop operations when wind speed exceeds the manufacturer's limits or when the load cannot be controlled. The signal person must monitor wind conditions.
Load landing procedure
After the lift, ensure the load is landed and secured before releasing rigging. Never signal to lower a load onto personnel or unstable surfaces.
Signal person qualification
The signal person must be qualified by the employer, demonstrating knowledge of signals, crane operations, rigging, and safety rules.
PPE for signal person
Wear required personal protective equipment: hard hat, high-visibility clothing, and safety glasses. The signal person must be easily visible to the operator.
Sole responsibility
The signal person must not perform other tasks that distract from signaling. Their sole responsibility is to communicate with the operator.
Authority to stop
The signal person has the authority to stop the operation if conditions become unsafe. The stop signal must be obeyed immediately by the operator.
Emergency procedures knowledge
The signal person must be trained in emergency procedures, including emergency stop signals, shutdown procedures, and how to alert emergency services.
Safe positioning
The signal person must not stand under a suspended load or where they could be struck. Maintain a safe distance and a clear view of the load and operator.
Signal person changeover
If a change of signal person is necessary, the operator must be informed before the new signal person takes over to avoid confusion.
Standard hand signals
Hand signals are standardized by ASME B30.5. Signal persons must use these standard signals for crane operations unless voice or radio communication is used.
Clear communication
All commands must be acknowledged by the operator before movement. If a command is not acknowledged, repeat it or stop the operation.