NCCER Tower Crane study materials
NCCER Tower Crane study resources

NCCER Tower Crane case studies

NCCER Tower Crane · Put your knowledge to work in context.

NCCER is an independent 501(c)(3) nonprofit educational foundation created in 1996 that provides industry-recognized credentials and accreditation across construction trades. Within its credentials and certifications catalog, NCCER lists "Crane, Rigger & Signal Person Certifications" alongside other programs such as Construction Superintendent Certification, Construction Foreman Certification, and Construction Site Safety Credentials. The NCCER Tower Crane case studies are 5 cases and about 3,766 words.

1

Foundation Undermined by Excavation After Rain

A 50 m jib tower crane is founded on a 6 m by 6 m reinforced concrete pad beside a 5 m deep utility excavation. The pad edge is 4 m from the excavation slope.

800 words, about 4 min
2

Damaged Used Mast Section and Reused Bolts

A crew is erecting a used flat-top tower crane with a 55 m jib. During pre-erection inspection, a 2.4 m mast section is found with a 20 mm deep dent in a main chord 150 mm from a splice hole and a 40 mm crack in a diagonal-to-chord weld.

741 words, about 4 min
3

Climbing Operation Above Wind Limit and Loss of Guide Roller Contact

A tower crane is being climbed from 60 m to 66 m under a manufacturer's procedure that limits climbing to 20 mph wind at the mast top. The mast-top anemometer reads 18 mph steady with 26 mph gusts; the site weather app at ground level shows 12 mph.

716 words, about 4 min
4

Near-Capacity Panel Lift With Sail Area and LMI Warning

An 8 t maximum-capacity tower crane is charted at 3.4 t for a 45 m radius. The lift is a 3.0 t prefabricated wall panel measuring 6 m by 3 m, giving about 18 m² of sail area.

757 words, about 4 min
5

Dismantling Sequence Error and Assist Crane Set on a Vault

A 55 m tower crane is being dismantled. The assist crane is a 100 t truck crane set on compacted fill over a basement vault.

752 words, about 4 min