NCIDQ IDIX study materials
NCIDQ IDIX study resources

NCIDQ IDIX flashcards

NCIDQ IDIX · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Net assignable area
The usable floor area of a building excluding circulation, walls, and mechanical spaces; used to calculate space needs and efficiency ratio.
Adjacency matrix
A grid that shows required relationships between spaces, rating each pair as direct, close, neutral, or undesirable; guides bubble diagrams.
Occupant load factor
The floor area per person used to calculate occupant load; for business use typically 100 gross square feet per person under model codes.
STC rating
Sound Transmission Class: a single-number rating of how well a partition blocks airborne sound; higher values mean better privacy.
NRC rating
Noise Reduction Coefficient: a rating of how much sound a surface absorbs; values range from 0 (reflective) to 1 (fully absorptive).
Punch list
A list of minor incomplete or defective work items identified during substantial completion; contractor must correct before final payment.
Change order
A written modification to the construction contract that changes scope, cost, or schedule; requires owner approval and architect's evaluation.
RFI
Request for Information: a formal contractor question seeking clarification of contract documents; architect responds in writing within a specified time.
Submittal
Shop drawings, product data, or samples submitted by the contractor for architect review to verify compliance with design intent and specifications.
Performance specification
A specification that states required results or performance criteria rather than specific products or methods; contractor chooses means to meet criteria.
Life-cycle cost
Total cost of a building element over its life, including initial cost, operation, maintenance, and replacement; used to compare design alternatives.
Egress width
The required width of exit access, exits, and stairs based on occupant load and capacity factors; minimum 36 inches clear for accessible routes.
Travel distance
The maximum distance from any point in a space to an exit, measured along the path of travel; limits vary by occupancy and sprinkler protection.
Accessible route
A continuous unobstructed path connecting accessible elements and spaces; minimum 36 inches wide, with turning spaces and proper slopes.
Bubble diagram
A schematic drawing using circles or bubbles to represent spaces and lines to show required adjacencies; used in early space planning.
Block plan
A scaled diagram showing approximate sizes and shapes of spaces and their relationships; more detailed than a bubble diagram.
LPD
Lighting Power Density: the maximum allowed lighting wattage per square foot under energy codes such as ASHRAE 90.1; office values around 0.9 W/sq ft.
Color temperature
A measure of light source warmth or coolness in kelvin; 2700–3000 K is warm, 3500–4000 K neutral, 5000–6500 K cool.
Daylight factor
The ratio of indoor illuminance at a point to outdoor illuminance under overcast sky; expressed as a percentage; 2–5% target for offices.
Sound masking
A system that adds low-level background noise to reduce speech intelligibility and improve acoustic privacy in open offices.
FF&E
Furniture, Fixtures, and Equipment: movable items not part of base building construction; specified in Divisions 11 and 12.
Ergonomic workstation
A workstation designed to fit the user: keyboard height 26–28 inches, monitor top at eye level, adjustable chair with lumbar support.
Casework
Built-in cabinetry and millwork such as base cabinets, wall cabinets, and countertops; specified with materials, finishes, and hardware.
Mockup
A full-size physical sample of a construction assembly or finish used to verify workmanship, appearance, and performance before full installation.
Fire-resistance rating
The duration in hours that a building element resists fire exposure; required ratings depend on construction type and occupancy.
Flame spread
A rating of how quickly a material propagates flame; interior finish codes limit flame spread and smoke developed index.
GMP contract
Guaranteed Maximum Price: a contract where the contractor agrees not to exceed a set price, sharing savings or covering overruns per terms.
Substantial completion
The stage when the work is sufficiently complete for the owner to use it for its intended purpose; starts warranty periods and punch list.
Critical path method
A scheduling technique that identifies the longest sequence of dependent tasks; delays on the critical path delay the project completion.
Low-VOC materials
Products with low emissions of volatile organic compounds, such as paints, adhesives, and carpets; improve indoor air quality and meet green standards.
NC rating
Noise Criteria: a single-number rating of background noise level; lower values are quieter; offices typically NC 25–35.
Efficiency factor
The ratio of net assignable square feet to gross square feet; indicates how much of a building is usable; typically 0.65–0.80 for offices.