Control Joint Layout in a 150-ft Warehouse Wall

A 150-ft-long, 20-ft-tall warehouse wall is 8-in. nominal CMU, reinforced vertically at 24 in. on center and horizontally with two No. 4 bars in bond beams at 8 ft and at the roof. There are two 12-ft-wide overhead doors. No control joints were installed except at the two ends where the wall meets columns. Nine months after occupancy, a 3/32-in.-wide vertical crack runs from the lintel over one overhead door to the roof, and efflorescence is present along the crack. The contractor proposes to epoxy-inject the crack and cover it with an elastomeric coating, arguing that the crack is only 3/32 in. and the wall is reinforced. The owner is concerned about water entry at the door frame.

1. Diagnose the cause of the crack and evaluate whether the missing control joints contributed.

Read the worked answer

The crack pattern points to restrained movement, and the missing control joints are the main contributor. A 150-ft wall with no joints has no planned location to relieve drying shrinkage and thermal contraction. The usual rule of thumb is control-joint spacing no greater than about 1.5 times the wall height in feet, here about 30 ft, so the wall should have had roughly four to five joints. The crack is at the corner of a large opening, where the wall changes section and the lintel restrains movement, and that is exactly where a control joint should have been placed. The 3/32-in. width is consistent with shrinkage movement. The efflorescence shows water is already entering and migrating through the crack, so this is not only cosmetic.

2. Evaluate the proposed epoxy injection and elastomeric coating as a repair.

Read the worked answer

The proposal treats the symptom, not the cause. Epoxy injection can restore structural continuity in a crack that has finished moving, but it also locks the wall against further movement; if shrinkage and thermal movement are not relieved, a new crack will form nearby. An elastomeric coating over single-wythe CMU is also questionable: it can reduce vapor transmission and trap moisture, and it will not bridge a crack that continues to move. The better approach is to have the engineer evaluate whether the crack is structurally significant, then repair it as a control joint: rout and seal with a properly sized backer rod and sealant, and add control joints so the wall has planned movement locations. Injection should be used only if the engineer determines the crack must be structurally bonded.

3. Where should new control joints go, and how should they be detailed?

Read the worked answer

New joints should be laid out at roughly 30-ft spacing and aligned with the door jambs and other openings, because openings concentrate stress at their corners. A control joint through the wall must actually break the horizontal reinforcement and bond beams, with a sealant joint at the face; if mortar or reinforcement bridges the joint, it will crack elsewhere. The joints should run full height and align with joints in the lintel and roof line. Because the wall is already cracked, the repair should be inspected after a rain or a controlled hose test to confirm the door frame area stays dry.