Plan-Do-Check-Act
A four-stage management cycle: plan objectives and controls, implement them, monitor performance, then review and correct. It underpins health and safety management systems on construction sites.
Hierarchy of control
The ranked order of risk controls: eliminate, substitute, engineering controls, administrative controls, then personal protective equipment last. Higher-ranked controls are more reliable.
Permit to work
A formal written authorisation for high-risk tasks such as confined-space entry or hot work. It records isolations, verification, authorised sign-off, and cancellation on completion.
Near-miss reporting
Recording incidents that caused no injury but could have. Near-misses are far more frequent than injuries and provide early warning of failing controls.
Competent person
A person with sufficient training, experience, and knowledge to perform a task safely and to recognise hazards. Supervision level must match the person's competence and the task risk.
Method statement
A document describing how a task will be carried out safely. It sequences the work, identifies hazards, states controls, and names responsible persons before work begins.
Proactive performance indicator
A measure of preventive activity, such as inspections completed, training delivered, or near-misses reported. It predicts future safety performance rather than recording past harm.
Reactive performance indicator
A measure of harm already occurring, such as lost-time injury frequency or accident rate. It records outcomes after the event and cannot prevent the harm it measures.
Work at height hierarchy
Avoid work at height where possible, then prevent falls using edge protection or guardrails, then minimise fall consequences with nets or harnesses. Harnesses are a last resort.
Excavation edge protection
Sides must be supported or battered to a safe angle. Spoil and plant are kept back from the edge, and a competent person inspects daily and after rain.
Confined space entry
Entry requires atmospheric testing before and during entry, forced ventilation, a rescue plan, and a standby person outside. Never enter without these controls in place.
Reduced low voltage
A 110 V centre-tapped-to-earth supply used on construction sites to reduce shock severity. Portable 230 V equipment needs RCD protection.
Silica dust control
Cutting concrete or stone generates respirable crystalline silica. Control with water suppression or on-tool extraction, and use respiratory protection as a last resort.
Site traffic segregation
Separate pedestrian routes from vehicle routes, use banksmen and reversing aids, and set site speed limits to prevent struck-by and crush injuries.
Hot work permit
Authorisation required before welding, grinding, or other ignition sources near combustibles. It requires fire watch, removal of combustibles, and firefighting equipment on standby.
Manual handling control
Reduce injury risk by using mechanical aids, team lifting, and shorter carry distances. Assess load weight, posture, and repetition before lifting.
Scaffold inspection
Scaffolds must be inspected by a competent person before first use, at intervals not exceeding seven days, and after alteration or adverse weather.
Risk rating formula
Risk is commonly calculated as likelihood multiplied by severity. The resulting rating sets priority and the timescale for corrective action.
Inspection report content
Record the observation, location, hazard and risk, required control, responsible person, and target completion date. This makes findings actionable and auditable.
Immediate danger finding
A finding where serious harm is imminent requires work to stop at once and the hazard to be controlled before activity resumes. It is not deferred to a scheduled action.
Action plan prioritisation
Corrective actions are ranked by risk rating, with high-risk items given short deadlines and low-risk items longer ones. Each action has an owner and date.
Follow-up verification
Checking that corrective actions were implemented and are effective. It closes the monitoring loop and prevents findings from being left unresolved.
Inspection checklist design
Structure the checklist by area such as excavations, scaffolds, electrical, and housekeeping, so each hazard category is systematically examined during the inspection.
HSWA 1974 general duty
Section 2 requires employers to ensure, so far as is reasonably practicable, the health, safety, and welfare of employees; section 3 extends duties to others affected.
Suitable and sufficient assessment
The Management of Health and Safety at Work Regulations 1999 require risk assessments that identify hazards, evaluate risk, and record significant findings where five or more are employed.
CDM 2015 notification
A project is notifiable where construction lasts over 30 working days with more than 20 workers simultaneously, or exceeds 500 person-days.
Construction phase plan
Required under CDM 2015 before construction starts. It records site arrangements, management responsibilities, and welfare provisions for the project.
Health and safety file
A CDM 2015 record handed to the client at completion. It contains information needed for future construction, maintenance, and demolition of the structure.
Improvement notice
An enforcement notice requiring a contravention of health and safety law to be remedied within a stated period. Appeal lies to an employment tribunal.
Prohibition notice
An enforcement notice stopping an activity that involves a risk of serious personal injury. It takes effect immediately or at a stated time and can be appealed.
Work at Height Regulations 2005
Require duty holders to avoid work at height where possible, prevent falls where it cannot be avoided, and minimise the distance and consequences of any fall.