ARCON PPCE · Give each week a clear focus.
8 weeks · About 7 hours per week
Professional Practice and Ethics & Architectural Design and Planning
Map the professional-practice and ethics domain into a one-page outline covering standard-of-care duties, conflict-of-interest rules, and the architect's obligations to client, public, and profession
Draft a decision framework for ethical dilemmas (disclose, decline, document, escalate) and apply it to three hypothetical scenarios involving gifts, undisclosed referral fees, and unsafe design pressure
Summarize the design and planning domain's core sequence from site analysis through schematic design, comparing three project types (residential, commercial, institutional) for programmatic and circulation differences
Build a personal glossary of 30 professional-practice and planning terms in English, each with a one-sentence definition
Complete 40 practice questions across domains 1 and 2 and log every miss with the underlying rule or principle
Identify the code and contract references you still need to obtain and note where each applies
Your checkpoint
A 4-6 page study notebook: domain outlines, the ethics decision framework applied to three scenarios, the 30-term glossary, and a scored error log from 40 practice questions
Building Technology and Construction & Materials and Specifications
Organize building technology into a systems matrix: substructure, superstructure, envelope, interior finishes, and the performance requirements of each
Trace the construction sequence of a mid-rise concrete frame and a low-rise steel frame from excavation to envelope close-in, noting inspection hold points
Compile a materials comparison sheet covering concrete, masonry, steel, timber, glass, and cladding, with key properties, typical uses, and failure modes
Practice writing specification sections: draft a short performance specification and a short prescriptive specification for the same component and compare the risk allocation of each
Explain how specification divisions, product data, and submittals connect to construction quality control
Complete 40 practice questions across domains 3 and 6 and record every miss with the relevant system or material property
Your checkpoint
A systems matrix plus a one-page materials comparison sheet and two contrasting specification samples for a single building component, with an error log from 40 practice questions
Structural Systems & Building Services (Mechanical, Electrical, Plumbing)
Diagram load paths for gravity and lateral loads in three structural systems (moment frame, braced frame, shear wall) and annotate how each resists wind and seismic demand
Solve and hand-check basic beam, column, and footing sizing problems using simple span and tributary area methods
Map the mechanical, electrical, and plumbing disciplines: for each, list the primary systems, space requirements, and coordination conflicts that arise in design
Calculate a simple HVAC load estimate and a lighting power density figure, then explain how each result feeds design decisions
Identify the fire-protection and life-safety interfaces between structural and MEP systems, including shaft, riser, and penetration coordination
Complete 40 practice questions across domains 4 and 5 and rework every missed calculation from first principles
Your checkpoint
A load-path diagram set for three lateral systems, a worked calculation sheet with three checked structural problems and two MEP estimates, and a scored error log from 40 practice questions
Contract Administration and Project Management & Statutory and Regulatory Compliance
Outline the contract administration cycle from award through final payment, listing the architect's action, the required documentation, and the time limit at each step
Draft a one-page comparison of common project delivery methods (design-bid-build, design-build, construction management) focused on risk, schedule, and the architect's role
Summarize the statutory framework: zoning and land-use controls, building code adoption and permit process, occupancy and egress requirements, and accessibility obligations
Build a permit and inspection checklist for a typical commercial project and annotate which items require architect certification
Practice responding to a change-order and a delay-claim scenario, documenting the contractual basis and the recommended action for each
Complete 40 practice questions across domains 7 and 8 and log misses by contractual clause or code provision
Your checkpoint
A contract administration flowchart with a delivery-method comparison table, a permit and inspection checklist, two written scenario responses, and an error log from 40 practice questions
Professional Practice and Ethics & Sustainability and Environmental Design
Revisit the ethics framework and apply it to five new scenarios involving contractor pressure, unauthorized practice by unlicensed staff, and environmental trade-offs in design
Explain the sustainability domain's core concepts: passive design strategies, energy modeling basics, water and waste reduction, and material lifecycle considerations
Compare three green certification approaches and state what each actually measures and where it falls short
Integrate sustainability into a design decision: take one earlier schematic and revise it with passive strategies, quantifying the expected effect on energy and comfort
Complete 30 practice questions across domains 1 and 9 and rework any ethics scenario answered incorrectly
Your checkpoint
A revised schematic design with a written sustainability strategy memo and a scored error log from 30 practice questions
Architectural Design and Planning & Building Technology and Construction
Produce a complete schematic design package for a small project: site analysis, program, concept diagrams, plans, sections, and elevations, all self-consistent
Apply building technology decisions to that package: specify the structural system, envelope assembly, and key materials, and justify each choice
Check the package against planning criteria including circulation, egress, accessibility, daylighting, and service access
Identify and correct at least five coordination conflicts between the architectural, structural, and MEP drawings in the package
Complete 40 practice questions across domains 2 and 3 and log every miss tied to a design or detailing principle
Your checkpoint
A coordinated schematic design package of 8-12 sheets with a design rationale memo and a corrected coordination-conflict list, plus an error log from 40 practice questions
Materials and Specifications & Contract Administration and Project Management & Statutory and Regulatory Compliance
Assemble a full specification outline for the week-6 project covering all major divisions, and write three complete sections in correct format
Draft the project's contract administration plan: submittal register, meeting and reporting schedule, inspection log, and payment certification procedure
Run a code compliance review of the week-6 package: occupancy classification, egress widths and travel distances, fire ratings, and accessibility clearances
Prepare a permit submission checklist with every required drawing and document accounted for
Complete 50 practice questions across domains 6, 7, and 8, and rework every miss until you can state the governing rule from memory
Your checkpoint
A specification outline with three complete sections, a contract administration plan, and a written code compliance review of the week-6 package, plus an error log from 50 practice questions
Professional Practice and Ethics & Architectural Design and Planning & Building Technology and Construction & Structural Systems & Building Services (Mechanical, Electrical, Plumbing) & Materials and Specifications & Contract Administration and Project Management & Statutory and Regulatory Compliance & Sustainability and Environmental Design
Take two full-length timed mock exams under exam conditions and score them by domain
Analyze the score reports to rank your five weakest domains and write a targeted remediation list for each
Rework every missed question from both mocks until you can explain the correct answer and why each distractor fails
Recite from memory the key facts, formulas, and code thresholds you have flagged as high-risk across all nine domains
Finalize a one-page exam-day strategy covering time allocation per question, question triage, and handling of unfamiliar content
Your checkpoint
Two scored full-length mock exams with a domain-by-domain analysis, a remediation list for the five weakest domains, and a one-page exam-day strategy sheet
Milestones
Week 2: You can draw a load path and a construction sequence from memory, and you have a complete systems matrix and materials sheet covering all six major material families
Week 4: You can walk through the contract administration cycle and the permit process without notes, and your cumulative practice error log shows domain 1 and domain 8 accuracy at or above 70 percent
Week 6: Your schematic design package is internally consistent and code-checked, and your cumulative practice error log shows at least 65 percent accuracy in every domain
Week 8: Both timed mock exams are complete, scored by domain, and fully reviewed, with every missed question reworked and a written remediation list for the five weakest domains