CPN CPE Software Engineering · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Software Testing and Verification & Software Requirements and Specification

  • Derive black-box test cases (equivalence partitioning, boundary value analysis, decision tables) for three small specifications and record expected results before execution

  • Distinguish verification from validation and classify ten given activities correctly in writing

  • Write measurable, testable requirements for a 15-item backlog, rewriting each vague adjective into a numeric acceptance criterion

  • Draft a traceability table linking each requirement to at least one test case and flag orphans in both directions

Your checkpoint

A 10-page test-and-requirements workbook containing 40+ designed test cases with expected results, a verification/validation classification table, and a bidirectional traceability matrix covering 15 requirements.

Week 2

Software Testing and Verification & Software Design and Architecture

  • Compute statement and branch coverage by hand for a 25-line code sample and identify the minimum additional test cases needed for full branch coverage

  • Compare unit, integration, system, and acceptance test levels by scope, entry criteria, and typical defects found

  • Explain how architecture choices (layering, coupling, interfaces) affect testability, giving three concrete design-to-test impacts

  • Apply a structural design technique (e.g., stepwise refinement or information hiding) to decompose one module into a documented structure chart

Your checkpoint

A coverage analysis sheet showing statement and branch percentages for two code samples plus the added test cases, accompanied by a one-page note on testability trade-offs in three architectural styles.

Week 3

Software Design and Architecture & Software Engineering Process and Lifecycle Models

  • Contrast at least five architectural styles (layered, client-server, pipe-and-filter, event-driven, microservices) by quality attributes and typical failure modes

  • Map waterfall, incremental, spiral, and agile lifecycles to project risk profiles and select one for a described scenario with written justification

  • Produce a component-and-connector view and a deployment view for a small system using a consistent notation

  • Identify which lifecycle phase owns each of 12 given work products (e.g., architecture description, test plan, release notes)

Your checkpoint

A 6-page architecture and lifecycle decision record: two views of one system, a style comparison table, and a justified lifecycle selection for a stated risk scenario.

Week 4

Software Construction and Implementation & Software Engineering Methods, Tools, and Security

  • Implement one small module applying defensive programming, clear naming, and consistent error handling, then refactor it to remove duplication

  • Configure a version control workflow with branching, meaningful commit messages, and a pre-commit check, and demonstrate it in a repository

  • Set up a static analysis or linter run and triage its findings into fix, suppress, and false positive

  • Describe how a build pipeline (compile, test, package) reduces integration risk, citing the specific failure each stage catches

Your checkpoint

A working repository containing the refactored module, a documented branching workflow, and a lint report with triaged findings plus a short pipeline description.

Week 5

Software Maintenance and Evolution & Software Configuration and Quality Management

  • Classify ten maintenance requests as corrective, adaptive, perfective, or preventive and rank them by risk and effort

  • Perform impact analysis on a proposed change using call graphs or dependency listings, listing affected modules and regression tests

  • Write a configuration management plan covering identification, control, status accounting, and audit for a small project

  • Define three quality metrics (e.g., defect density, change failure rate, mean time to repair) with data sources and thresholds

Your checkpoint

A maintenance and configuration management plan including a classified change backlog, an impact analysis for one change, and a metrics definition table with thresholds.

Week 6

Software Project Management and Engineering Economics & Software Configuration and Quality Management

  • Build a work breakdown structure for a 12-week project down to tasks of 8-40 hours and estimate each using at least two techniques

  • Compute critical path, total float, and schedule risk for a 20-activity network, and identify the top three schedule threats

  • Produce a cost model distinguishing labor, tooling, and rework, and calculate cost variance given planned versus actual figures

  • Apply a review technique (inspection or walkthrough) to a peer artifact, recording defects by type and phase found

Your checkpoint

A project plan package: WBS, dual-technique estimates, critical path calculation with float values, cost variance worksheet, and a defect log from one peer review.

Week 7

Software Engineering Methods, Tools, and Security & Software Requirements and Specification

  • Identify and mitigate five common security weaknesses at the design and coding level (input validation, authentication, authorization, secrets handling, dependency risk)

  • Threat-model one feature using data flow diagrams and a structured technique such as STRIDE, producing ranked mitigations

  • Specify security and non-functional requirements (performance, availability, usability) with measurable acceptance criteria

  • Select appropriate tooling for requirements management, testing, and CI, justifying each choice against team size and constraints

Your checkpoint

A threat model with ranked mitigations for one feature plus a specification section of 10 measurable non-functional and security requirements and a justified tool selection table.

Week 8

Software Testing and Verification & Software Design and Architecture & Software Project Management and Engineering Economics

  • Complete two timed mixed-domain practice sets and score each by domain to expose weak areas

  • Re-derive the five most-missed concepts from scratch without notes and explain each aloud or in writing

  • Review every prior deliverable against a personal checklist of recurring errors and correct at least five defects

  • Build a one-page exam-day reference of formulas and definitions (coverage, critical path, cost variance, lifecycle criteria) that you can reconstruct from memory

Your checkpoint

A scored practice report by domain, a corrected set of prior deliverables, and a one-page self-authored formula and definition sheet validated by closed-book recall.

Milestones

Week 2: Correctly compute statement and branch coverage for an unseen 20-30 line sample within 20 minutes and list the missing test cases, scoring at least 80% on a 15-question testing quiz.

Week 4: Demonstrate a working repository with branching, a passing lint run, and a refactored module; explain in writing how each pipeline stage catches a distinct failure class.

Week 6: Produce a critical path and float calculation for an unseen 15-activity network with no arithmetic errors, and justify two independent estimates that agree within 20%.

Week 8: Score 75% or higher on both timed mixed practice sets, with no single domain below 60%, and reproduce the one-page formula sheet closed-book with at least 90% accuracy.