ICSAN Management Accounting study materials
ICSAN Management Accounting study resources

ICSAN Management Accounting key terms

ICSAN Management Accounting · Get comfortable with the vocabulary.

Relevant cost

A future cash cost or saving that differs between the alternatives being compared. Sunk costs, committed costs and apportioned fixed overheads are excluded because they do not change with the decision.

Related: Opportunity cost, Sunk cost, Contribution margin
Opportunity cost

The contribution or benefit forgone by using a scarce resource for one purpose instead of its next best alternative. It is included in decision analysis even though no cash payment appears in the ledger.

Related: Relevant cost, Limiting factor
Sunk cost

Money already spent or irrevocably committed that cannot be recovered whatever decision is taken. It is irrelevant to forward-looking choices, though it may still influence reported profit.

Related: Relevant cost
Contribution margin

Sales revenue less all variable costs, measured per unit or in total. It shows how much each sale adds towards covering fixed costs and then generating profit.

Related: Break-even point, Marginal costing, Relevant cost
Break-even point

The activity level at which total contribution exactly equals total fixed costs, giving neither profit nor loss. It can be expressed in units, in revenue or as a percentage of capacity.

Related: Contribution margin, Margin of safety, Cost-volume-profit analysis
Margin of safety

The amount by which budgeted or actual sales exceed the break-even volume, shown in units, revenue or percentage terms. It measures how far sales can fall before a loss arises.

Related: Break-even point, Cost-volume-profit analysis
Cost-volume-profit analysis

A technique that models how changes in volume, selling price, variable cost and fixed cost affect profit. It typically assumes linear costs and a single product or constant sales mix.

Related: Break-even point, Contribution margin, Margin of safety
Absorption costing

A product costing method that assigns both variable and a share of fixed production overhead to units produced. It is required for external financial reporting in most jurisdictions.

Related: Marginal costing, Overhead absorption rate, Over- and under-absorption
Marginal costing

A costing approach in which inventory and product cost carry only variable production costs, with fixed costs written off in full against the period's contribution. It supports short-term decisions and profit-volume analysis.

Related: Absorption costing, Contribution margin
Overhead absorption rate

A predetermined rate used to charge indirect production costs to products, usually calculated as budgeted overhead divided by budgeted activity such as labour hours or machine hours.

Related: Absorption costing, Over- and under-absorption, Cost driver
Over- and under-absorption

The difference between overhead actually incurred and overhead charged to production using a predetermined rate. Over-absorption means too much was charged; under-absorption means too little.

Related: Overhead absorption rate, Absorption costing
Cost driver

The factor that causes a cost to change in total, such as machine hours, number of set-ups or number of orders. Identifying a suitable driver is central to activity-based costing.

Related: Activity-based costing, Overhead absorption rate
Activity-based costing

A method that assigns overhead to products through activities and their cost drivers rather than a single volume-based rate. It improves accuracy where products consume support activities in different proportions.

Related: Cost driver, Overhead absorption rate
Job costing

A costing method where costs are collected separately for each identifiable unit or small batch to customer specification. It suits bespoke work such as construction, printing or professional services.

Related: Batch costing, Contract costing, Process costing
Batch costing

A costing method that treats a group of identical units produced together as the cost object, with the unit cost found by dividing batch cost by batch size. It suits production runs of similar items.

Related: Job costing, Economic batch quantity
Contract costing

A form of job costing applied to large, long-duration projects such as building or civil engineering work. Revenue and profit are recognised by stage of completion using work certified and retention.

Related: Job costing, Retention money, Notional profit
Process costing

A costing method for continuous mass production of identical units, where total costs are averaged over output. Normal losses, abnormal gains and losses and equivalent units must be handled.

Related: Equivalent units, Normal loss, Joint product
Equivalent units

A measure converting partly completed work into the number of fully complete units it represents, based on the degree of completion of each cost element. It allows work in progress to be valued in process costing.

Related: Process costing, Normal loss
Normal loss

The unavoidable waste or spoilage expected under efficient operating conditions, whose scrap value is credited to the process account. Its cost is absorbed by good output.

Related: Process costing, Abnormal loss
Abnormal loss

Loss in excess of the expected normal level, valued at full cost and written off to the profit and loss account rather than borne by good output. An abnormal gain is the reverse.

Related: Normal loss, Process costing
Joint product

One of two or more products of broadly similar value produced unavoidably from the same process up to the split-off point. Common costs are apportioned using sales value or physical measures.

Related: Process costing, By-product
By-product

A minor product arising incidentally from a process, of much lower value than the main product. Its net realisable value is usually deducted from the main process cost.

Related: Joint product, Process costing
Standard cost

A predetermined estimate of the cost of a product or operation under specified working conditions, built from price and usage standards. It provides the benchmark against which actual performance is compared.

Related: Variance analysis, Standard hour
Variance analysis

The process of comparing actual results with budgeted or standard figures, identifying the causes of differences and reporting them to management for action.

Related: Standard cost, Favourable variance, Flexible budget
Favourable variance

A difference from standard that increases profit relative to budget, such as actual cost being below standard or actual revenue above standard. Adverse variance is the opposite.

Related: Variance analysis, Standard cost
Standard hour

A unit of output expressed as the time it should take to produce it at standard efficiency. It allows output of different products to be combined in a single capacity measure.

Related: Standard cost, Capacity ratio
Flexible budget

A budget that is adjusted to the actual activity level achieved, so that fixed and variable costs are compared on a like-for-like basis. It isolates spending variances from volume effects.

Related: Variance analysis, Fixed budget, Budgetary control
Fixed budget

A budget prepared for one planned level of activity and not adjusted afterwards. Comparing it directly with actual results at a different volume mixes volume effects with spending effects.

Related: Flexible budget
Zero-based budgeting

A budgeting approach where each activity must justify its entire budget from a nil base rather than from last year's figure. It challenges existing spending but is time-consuming to operate.

Related: Incremental budgeting, Budgetary control
Incremental budgeting

Preparing next period's budget by adjusting the current period's figures for expected changes such as inflation or growth. It is quick but tends to perpetuate past inefficiencies.

Related: Zero-based budgeting
Budgetary control

The cycle of setting budgets, communicating them, measuring actual performance and taking corrective action on significant variances. It links planning with day-to-day operational management.

Related: Flexible budget, Variance analysis, Responsibility centre
Responsibility centre

A unit of an organisation whose manager is accountable for a defined set of revenues, costs or investments. It may be a cost, revenue, profit or investment centre.

Related: Return on investment, Residual income, Budgetary control
Return on investment

A divisional performance measure calculated as divisional profit divided by divisional capital employed. It encourages efficient asset use but can cause managers to reject projects that dilute the ratio.

Related: Residual income, Responsibility centre
Residual income

Divisional profit less a notional interest charge on the capital employed by the division. Unlike return on investment, it should not discourage managers from accepting profitable projects.

Related: Return on investment, Responsibility centre
Working capital cycle

The period between paying suppliers for materials and collecting cash from customers, covering inventory holding, production, receivables and payables days. Shortening it releases cash.

Related: Cash operating cycle, Economic order quantity
Economic order quantity

The order size that minimises the combined cost of placing orders and holding inventory. It balances ordering costs against holding costs, assuming stable demand and known lead times.

Related: Working capital cycle
Net present value

The sum of a project's future cash flows discounted to present value at the cost of capital, less the initial outlay. A positive figure suggests the project adds value.

Related: Internal rate of return, Payback period, Discounted cash flow
Internal rate of return

The discount rate at which a project's net present value is zero. It is compared with the cost of capital to decide acceptance, but can mislead with non-conventional cash flows.

Related: Net present value, Discounted cash flow
Payback period

The time taken for cumulative cash inflows to recover the initial investment. It is simple and favours liquidity, but ignores cash flows after the cut-off and the time value of money.

Related: Net present value, Internal rate of return
Discounted cash flow

A family of appraisal techniques that convert future cash flows to present value using a discount rate reflecting the time value of money and risk. Net present value and internal rate of return are examples.

Related: Net present value, Internal rate of return