PCN PEP study materials
PCN PEP study resources

PCN PEP flashcards

PCN PEP · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Purdue Model Level 0
The physical process layer containing sensors, actuators, valves, motors, and the equipment that directly interacts with the industrial process.
OT CIA priority
In operational technology, availability is prioritized above integrity and confidentiality because safety and continuous production are the primary objectives.
Safety Instrumented System
An independent control system that monitors process conditions and drives the process to a safe state when interlock limits are exceeded, separate from the basic process control system.
RTU versus PLC
An RTU is designed for remote telemetry over low-bandwidth links, while a PLC is designed for high-speed local discrete and analog control on the plant floor.
Modbus/TCP port
Modbus/TCP uses TCP port 502 and provides no authentication or encryption, making it a common target for unauthorized coil and register writes.
DNP3 secure authentication
DNP3 Secure Authentication (SAv5) adds challenge-response integrity and optional encryption to the master-outstation protocol, preventing spoofed control commands.
EtherNet/IP CIP Security
CIP Security adds TLS and DTLS to EtherNet/IP, providing integrity and confidentiality for explicit messaging and implicit I/O traffic between devices.
OPC UA security
OPC UA uses X.509 certificates, message signing, and encryption on TCP port 4840, with an information model that exposes nodes and references to clients.
PROFINET IRT
Isochronous Real-Time is a PROFINET mode that provides deterministic sub-millisecond cycles for motion control by reserving bandwidth and synchronizing devices.
IEC 61850 GOOSE
GOOSE is a Layer 2 multicast protocol in substation automation for fast protection trips, bypassing TCP/IP to achieve millisecond latency.
OT DMZ
A demilitarized zone between enterprise and control networks that terminates all IT-to-OT sessions and prevents direct routing into Level 2 or lower.
Data diode
A unidirectional gateway that enforces one-way data flow from OT to IT, preventing inbound command and control traffic into the control network.
Zone and conduit
An IEC 62443 grouping of assets with common security requirements (zone) connected by controlled communication paths (conduits) with documented protocols and ports.
VLAN security limitation
VLANs provide Layer 2 separation but are not a security boundary without inter-VLAN ACLs or firewalls, because VLAN hopping and trunk abuse are possible.
Passive OT monitoring
Using SPAN ports or network TAPs to observe OT traffic without injecting packets, avoiding disruption to fragile controllers that active scanning can cause.
IEC 62443 foundational requirements
Seven requirements: identification and authentication control, use control, system integrity, data confidentiality, restricted data flow, timely response to events, and resource availability.
Security Level SL4
The highest IEC 62443 security level, defined as protection against intentional attacks using sophisticated means with extended resources, such as state-sponsored actors.
Application whitelisting
An endpoint control that permits only approved executables to run, effectively blocking unknown malware on fixed-function HMIs and engineering workstations.
OT patch cycle
A test-then-deploy process: vendor advisory review, lab validation, maintenance window scheduling, rollback plan, deployment, and post-patch verification.
Least privilege in OT
Separating operator, engineer, and administrator accounts so each role has only the access needed, eliminating shared generic logins on engineering workstations.
HAZOP study
A systematic risk assessment that examines deviations from design intent using guide words such as no, more, less, reverse, and other to identify hazards.
LOPA
Layer of Protection Analysis quantifies independent protection layers to determine whether risk is reduced to as low as reasonably practicable (ALARP).
NERC CIP
Mandatory reliability standards for bulk electric systems covering asset categorization, electronic security perimeters, system security management, and configuration change management.
Risk treatment options
The four choices for handling identified risk: mitigate with controls, transfer to insurance or contract, avoid the activity, or accept with documented management sign-off.
OT intrusion detection
Industrial IDS baselines normal protocol behavior and flags anomalies such as new assets, unauthorized commands, program downloads, and firmware changes.
OT incident containment
Isolating affected OT assets while confirming safety and manual operation, because disconnecting a compromised HMI may halt production or disable protection.
Incident response lifecycle
The phases of preparation, detection and analysis, containment, eradication, recovery, and lessons learned, documented in OT-specific playbooks.
OT forensic evidence
Network packet captures are often the primary evidence in OT because many PLCs and RTUs lack logging, supplemented by controller memory and configuration captures.
OT change management
A controlled process of request, risk review, test plan, approval, scheduled window, implementation, verification, and documentation for every OT change.
Configuration backup testing
Storing PLC, HMI, switch, and firewall configurations offline and periodically proving restore capability, because an untested backup is not a control.
OT asset inventory
A record of make, model, firmware version, network address, owner, location, and end-of-support date for every OT device to support lifecycle planning.
Secure decommissioning
The lifecycle phase that includes data sanitization, credential revocation, network removal, and physical destruction of storage media where required.