SURCON Professional study plan
SURCON Professional · Give each week a clear focus.
8 weeks · About 8 hours per week
Geodesy and Geodetic Positioning & Cadastral Surveying and Land Registration
Derive and explain the relationships among geodetic, geocentric and astronomical latitude, and compute the deflection of the vertical for two worked station examples
Convert coordinates between geodetic and projected grid systems by hand using Transverse Mercator / UTM formulae, and check results against a software solution
Compute the effect of geoid-ellipsoid separation on ellipsoidal versus orthometric heights for three sample points
Identify the reference ellipsoid, origin and orientation of a national geodetic datum, and quantify how a datum shift alters computed coordinates
Outline the statutory steps of cadastral survey and land registration in your jurisdiction, sequencing them from client instruction to issuance of title
Your checkpoint
One-page formula sheet (geodesy + projections) plus 10 fully solved numerical problems with units and sketches
Geodesy and Geodetic Positioning & Cadastral Surveying and Land Registration
Calculate satellite geometry metrics (DOP) and assemble an error budget for a static and an RTK GNSS survey
Adjust a small trilateration/traverse network by least squares, and interpret residuals, standard errors and error ellipses
Reduce raw field booking data to bearings and distances, then compute linear misclosure, accuracy ratio and bowditch-adjusted coordinates
Compute parcel area by coordinate method and verify it against the double-meridian method
Compare fixed, general and natural boundary doctrines and state which applies to a given parcel description
Your checkpoint
Adjusted network and traverse computation booklet (field notes, adjustment tables, final coordinate list, misclosure statement)
Cadastral Surveying and Land Registration & Surveying Law, Ethics and Professional Practice
Draft a cadastral survey plan to specification, showing beacon numbering, bearings, distances, areas and boundary annotations
Describe and apply the procedures for subdivision, amalgamation and re-establishment of lost beacons
Analyse four land registration instruments (deed of assignment, certificate of occupancy, mortgage, survey plan) and extract the survey-relevant clauses
Explain how registration systems (deeds vs title registration) affect the evidentiary weight of a boundary survey
Apply survey regulation requirements on accuracy standards and records retention to three scenarios
Your checkpoint
Compliant draft cadastral survey plan with a one-page compliance checklist mapped to regulatory clauses
Photogrammetry and Remote Sensing
Compute photographic scale, flying height, ground coverage and overlap from camera focal length and format
Solve relief displacement, parallax and object-height problems from stereo-pair data
Design an aerial photography mission (flight lines, exposure interval, side and forward overlap) for a stated mapping scale
Perform exterior orientation reasoning: compute ground coordinates from measured image coordinates and orientation parameters
Evaluate accuracy expectations of a photogrammetric mapping project against a stated specification
Your checkpoint
Flight mission plan with computed flight lines, exposure interval and 10 solved photogrammetric numerical problems
Photogrammetry and Remote Sensing & Cartography and Geographic Information Systems
Compute NDVI and other spectral indices from given band reflectance values and interpret the output for land-cover classes
Convert between pixel size, spatial resolution and map scale, including area and file-size estimates for a raster dataset
Select sensor platform, bands and revisit frequency for three specified applications, justifying each choice
Differentiate supervised and unsupervised classification workflows and estimate the error matrix and kappa accuracy
Explain atmospheric and geometric correction steps and their effect on derived products
Your checkpoint
Remote sensing analysis report: index calculation, accuracy assessment table and sensor-selection justification matrix
Cartography and Geographic Information Systems
Select and justify map projection, datum and coordinate system for four named mapping tasks
Apply cartographic generalization and symbolization rules to reduce a detailed dataset to a specified map scale
Design and execute a vector GIS workflow using overlay, buffer and spatial query to answer a land-suitability question
Evaluate spatial data quality (positional accuracy, logical consistency, completeness, lineage) for a supplied dataset description
Produce a map layout meeting cartographic standards: title, scale bar, north arrow, legend, graticule and source note
Your checkpoint
One publishable map layout plus a written workflow log of the GIS analysis with data-quality assessment
Surveying Law, Ethics and Professional Practice & Cadastral Surveying and Land Registration
Interpret statutory provisions on survey practice, boundary determination and registration in answering scenario questions
Resolve four professional-ethics dilemmas by applying a code of conduct and stating the duty owed to client, public and profession
Assess liability exposure in cases of negligence, encroachment and erroneous survey plans, and recommend preventive controls
Draft the surveyor's role and evidence in a boundary dispute, including what records would be tendered
Apply rules on professional competence, continuing development and conflict of interest to given fact patterns
Your checkpoint
Four structured case answers (issue–rule–application–conclusion format) totalling 1,200 words on law and ethics scenarios
Cadastral Surveying and Land Registration & Geodesy and Geodetic Positioning & Photogrammetry and Remote Sensing & Cartography and Geographic Information Systems & Surveying Law, Ethics and Professional Practice
Complete two full timed mock examinations under exam conditions and score each domain separately
Diagnose the three weakest sub-topics from mock results and re-work 15 targeted practice items in each
Reconstruct from memory the formula sheet, key definitions and regulatory citations for all five domains
Refine answer technique: allocate time per mark, structure calculation answers and show units and assumptions
Your checkpoint
Scored mock-exam log with a remediation table showing weak topics, corrective actions and target accuracy per domain
Milestones
Week 2: Achieve at least 70% on a self-set 25-item geodesy and traverse-computation test, with all numerical answers worked to completion
Week 4: Produce a cadastral survey plan and a photogrammetric mission plan that each pass a self-audit against a written specification checklist
Week 6: Complete a GIS map and remote sensing report that satisfy every layout and accuracy criterion on the checklist, with no unresolved errors
Week 8: Score 70% or higher overall on two full timed mocks, with no single domain below 60%