Compaction Results That Do Not Add Up on a Four-Foot Embankment
You are inspecting a 4-foot embankment built from a sandy-silt borrow source. The specification requires lifts no thicker than 8 inches loose, moisture within -1 to +2 percent of optimum, and 95 percent of maximum dry density per AASHTO T 180. The technician is testing with a nuclear gauge (AASHTO T 310), and the density comparison curve on file is labeled 'AASHTO T 99.' Results for the last lot: STA 214+00, 96.2 percent; STA 214+50, 94.6 percent; STA 215+00, 92.8 percent at 3.5 percent above optimum moisture. At STA 215+00 you also measure a loose lift thickness of 11 inches. The contractor wants to proofroll tonight and start base aggregate at 6 a.m.
1. The comparison curve is T 99 but the specification calls for T 180. What does that mean for the reported results, and what must happen before another lift goes down?
Read the worked answer
T 99 (standard Proctor) uses lower compactive effort (about 12,400 ft-lb per cubic foot, 5.5-lb rammer, 12-inch drop, three lifts) than T 180 (modified, about 56,000 ft-lb per cubic foot, 10-lb rammer, 18-inch drop, five lifts). Maximum dry density from T 99 is therefore lower than from T 180 for the same soil.
Consequence: dividing field density by the lower T 99 maximum inflates the reported percentage. A reported 96.2 percent may be several points lower when compared against the correct T 180 maximum - the lot may be failing outright.
Required actions before more fill:
- Suspend acceptance of the affected lots.
- Verify the curve - lab report, project number, sample source, date, and soil classification.
- Have a T 180 curve run on a representative sample of the actual borrow (or verify by a one-point Proctor per T 272).
- Confirm the nuclear gauge has a current correlation to sand cone (T 191) on this soil and that calibration is current.
- Recompute the affected lots and identify how far back the wrong curve was used; those lifts must be re-evaluated.
Document the nonconformance and the retest plan under the engineer's direction.
2. Can you accept this lot and the 11-inch lift? State your acceptance decision, the cause of the failure, and the corrective actions.
Read the worked answer
Do not accept, and do not release the area for base aggregate.
- 92.8 percent at STA 215+00 fails the 95 percent requirement. Unless the specification expressly allows lot averaging - and even then a failing sublot usually still triggers rework - a failing test is a failing test. Proofrolling is a supplementary check for unstable material, never a substitute for density acceptance.
- The 11-inch lift explains the low density. Compactive effort from the surface cannot reach the bottom of an over-thick lift, so the lower portion stays loose. The lift itself is a nonconformance independent of the density result.
Corrective action:
- Scarify or excavate the over-thick lift to within 8 inches loose; the failing area may extend beyond the single test point, so define the limits with additional tests rather than one point.
- Moisture is 3.5 percent above optimum - aerate/disc and allow drying to within the -1 to +2 band.
- Recompact with the approved equipment and pass count.
- Retest at the failed location after rework plus enough additional points to bracket the repaired area. A retest relocated to a convenient spot is not a valid retest.
Record thickness measurements, moisture, equipment, passes, and all test locations.
3. The moisture reading is 3.5 percent above optimum. What options are open, and what do you document about moisture?
Read the worked answer
The material is outside the -1 to +2 percent band, so it cannot be accepted as placed.
Options, in order of practicality:
- Aerate by disking, blading, and turning until the moisture falls into the band, then recompact.
- Blend in drier borrow material.
- Delay the lift and let it dry (weather-dependent, and note the schedule impact).
- Do not accept 'roll it more' as a fix - overrolling wet fine-grained soil causes pumping, shearing, and a crust over soft material.
Document: moisture at each test location and the test method; whether the wetting came from rain, haul-road watering, or the borrow source itself (a borrow pit above optimum will keep producing wet fill); the corrective action taken; and drying time and weather during it.
If the contractor disputes the moisture, verify with an oven-dry sample (T 265). Nuclear moisture readings are an estimate and require correlation; the oven-dry result is the referee value. A borrow source that is consistently wet of optimum is a source issue worth raising to the engineer before more fill is scheduled.