- Hydrostatic test pressure
- For new sprinkler piping, 200 psi for two hours, or 50 psi above maximum working pressure if that is higher; no pressure loss is allowed during the test.
- Pneumatic test limit
- Air testing of sprinkler piping is normally capped at 40 psi unless the piping is approved for higher pressure; the acceptance period is 24 hours.
- Main drain test
- A flow test through the main drain that records static and residual pressure; a large drop compared with prior results signals a supply or valve problem.
- Inspector's test connection
- A valve at the hydraulically most remote point that flows about one sprinkler equivalent, confirming waterflow alarm operation and unobstructed piping.
- Waterflow alarm timing
- On a wet pipe system, opening the inspector's test connection must actuate the waterflow alarm within 90 seconds of flow starting.
- Dry pipe valve trip test
- Opening the inspector's test connection on a dry system must trip the dry pipe valve and deliver water within 60 seconds; record the trip time.
- Priming water level
- The water level maintained above the clapper in a dry pipe valve; too little priming water delays or prevents the valve from tripping properly.
- Dry pipe air pressure
- Air pressure maintained on a dry system per design, commonly 20 to 40 psi, must be high enough to hold the clapper closed but allow timely tripping.
- Preaction system test
- Detection circuits are tested separately from the discharge valve; the releasing panel and solenoid must open the valve only on the designed detection signal.
- Deluge valve operation
- A deluge valve opens on detection signal to supply all open sprinklers at once; testing verifies detection, releasing, and full-flow discharge.
- Standpipe residual pressure
- For a Class I standpipe, the minimum residual pressure at the topmost outlet is 100 psi while flowing the required rate.
- Fire pump churn test
- Running the pump at zero flow; the pump must produce at least 100 percent of its rated pressure at churn.
- Fire pump 150 percent test
- At 150 percent of rated flow, the pump must still produce at least 65 percent of rated pressure to satisfy acceptance criteria.
- Backflow preventer test
- A reduced-pressure zone assembly is tested by measuring differential across the check valves and confirming the relief valve opens at the design differential.
- Gauge calibration range
- Test gauges must be calibrated and read where the needle sits between 25 and 75 percent of full scale for accurate pressure readings.
- Supervised control valve
- A control valve that is locked open or electrically supervised so that closure is detected; valve status is recorded at each inspection.
- Freeze protection check
- Wet pipe systems require heated spaces at 40 degrees F minimum; low-point drains must not hold trapped water in areas subject to freezing.
- Obstruction investigation
- When main drain or inspector's test flow is weak, a flushing or obstruction investigation is performed before the system returns to service.
- Design demand verification
- The flow test at the most remote connection must meet or exceed the design density over area plus the required hose allowance at the riser base.
- Hydraulic most remote point
- The location in the piping with the greatest pressure loss from the supply; test connections and flow measurements are placed there for worst-case verification.
- Wet pipe alarm valve test
- Flow through the alarm valve must actuate the water motor gong or pressure switch; retest after any adjustment to the alarm devices.
- Tamper switch test
- A supervisory tamper switch on a control valve must signal closure to the fire alarm panel; the signal is verified during inspection.
- Record retention
- Inspection and test records are kept on site for the period required by the applicable standard, commonly one year, and made available to the authority.
- Pump suction pressure
- Suction pressure is recorded during pump flow tests because a dropping suction indicates a supply restriction or a nearly empty suction source.
- Churn to overload curve
- The pump performance curve is plotted from churn through 100 and 150 percent flow; the curve shape must fall within the acceptable band.
- Flow test pitot reading
- A pitot tube reading at the test outlet converts to flow in gallons per minute using the orifice coefficient and diameter.
- Static versus residual
- Static pressure is read with no flow; residual pressure is read while flowing, and the difference characterizes the available water supply.
- Two-hour hydrostatic hold
- The hydrostatic acceptance test holds pressure for two hours with no loss; visible leaks at joints or fittings constitute failure regardless of gauge reading.
- Air compressor test
- The dry system air compressor must maintain design air pressure; test verifies the compressor starts and restores pressure within the allowed time.
- Accelerator test
- An accelerator speeds dry valve tripping; it is tested by opening the inspector's test connection and confirming the valve trips within the allowed time.
- Water supply curve
- The supply curve plots available pressure versus flow from the flow test; the design point must fall below and left of the curve to be adequate.
- Hose allowance
- Flow added to the sprinkler demand for hose streams, commonly 100 to 250 gpm depending on hazard, included when verifying the supply.
- Valve tamper supervision
- Supervisory devices on control valves must report closure to the panel; loss of supervision is itself a deficiency requiring correction.