NICET ITWBS Level III study materials
NICET ITWBS Level III study resources

Battery Backup Sizing for a Basement BDA

NICET ITWBS Level III · Put your knowledge to work in context.

All case studies

Battery Backup Sizing for a Basement BDA

A basement BDA for an 800 MHz public-safety system is powered from a 120 VAC circuit and backed by a 12 V lead-acid battery string rated 100 Ah at the 8-hour rate. The BDA draws 18 A at 12 V during normal operation. During a utility outage, the system dropped after about 45 minutes. The owner claims the battery is new and fully charged. The charger is a 10 A float charger, and the battery room is at 25 degrees C. The AHJ adopted a 12-hour standby requirement for emergency responder radio coverage systems and requires a load test at installation. The building has no generator. The BDA manufacturer specifies a minimum input voltage of 11 V and a maximum charge current of 20 A.

1. Calculate the battery capacity required for 12 hours of standby and compare it with the installed battery.

Read the worked answer

Required capacity: load 18 A for 12 h equals 216 Ah. Apply a usable depth of discharge of 80%: 216/0.8 = 270 Ah. Apply an aging/design margin of 20%: 270 x 1.2 = 324 Ah. At 25 degrees C, no temperature derate is needed. The installed 100 Ah battery is far undersized. Even at 100% depth it would last about 5.5 h at 18 A; at 80% usable it would last about 4.4 h. The observed 45 minutes suggests additional problems such as voltage sag, a bad battery, or the charger not supporting the load. The 10 A charger is also below the 18 A load, so the battery drains even while on charger. The required charger should be sized for the load plus recharge current, within the manufacturer's 20 A maximum.

2. Diagnose why the system failed after 45 minutes even though the battery is new.

Read the worked answer

Check battery open-circuit voltage and perform a load test. Verify charger output and that it is connected and operating. Measure voltage at the BDA terminals during discharge. The 45-minute failure could be a battery that is not fully charged, a charger that cannot carry 18 A, undersized conductors causing voltage drop below the 11 V minimum, or a battery whose 100 Ah rating at the 8-hour rate does not translate to 18 A discharge because of Peukert effect. The 10 A charger cannot both run the load and recharge the battery. The installation therefore does not meet the 12-hour standby requirement even if the battery is new.

3. Specify corrective measures and the acceptance test needed.

Read the worked answer

Replace the battery bank with one sized at least 324 Ah, or follow the manufacturer's derating for the actual discharge rate. Install a charger rated for the load plus recharge current and within the 20 A maximum. Use proper overcurrent protection, disconnects, and conductors sized for voltage drop. Add low-voltage alarm and remote monitoring. Perform a 12-hour load test with the actual BDA load, recording battery voltage at the start, midpoint, and end; the system must stay above 11 V for the full duration. Document the capacity calculation, charger rating, and test results for the AHJ. Verify ventilation and battery-room conditions. If the AHJ permits a generator, an automatic transfer switch could supplement the battery, but the adopted requirement here is 12-hour battery standby.