NICET ITWBS Level III cheat sheet
NICET ITWBS Level III · Keep the key ideas within reach.
In-Building Public Safety Communications
Coverage acceptance is measured as Delivered Audio Quality (DAQ): DAQ 3.0 is the minimum passing score for most public safety in-building systems, DAQ 3.4 is often specified for voice paging or critical areas; DAQ 1 is unintelligible, DAQ 5 is near-toll quality.
Signal strength alone does not prove coverage: a system can show adequate RSSI (commonly -95 dBm or better at the antenna) while failing DAQ because of interference, delay spread, or simulcast overlap; always test with the actual subscriber radio on the actual talkgroup.
The 95%/90% rule: a common acceptance criterion is DAQ 3.0 or better in 95% of grid test locations on each floor, with no location below DAQ 2.0; confirm the AHJ's specific percentages before testing.
Grid testing is performed on a uniform grid (typically 20 to 25 test points per floor, spaced roughly 10 to 20 feet apart) with the donor site disabled where feasible so the result reflects the in-building system only.
Leakage is verified outside the building envelope: measured signal at the property line or at a specified offset must stay below the AHJ threshold (often -95 to -100 dBm on the donor's downlink) to prevent interference with the macro network.
BDA versus fiber DAS: a BDA (bi-directional amplifier) amplifies off-air donor signals and is limited by donor isolation and available signal; a fiber DAS converts RF to optical, distributes over fiber, and supports multiple bands and sectors with centralized head-end control.
Donor isolation must exceed system gain by at least 15 dB (many designs target 20 dB) to prevent oscillation; isolation is measured as the path loss between donor antenna and service antennas, including building attenuation and antenna front-to-back ratio.
Uplink noise contribution to the donor site must be controlled: excessive uplink gain raises the donor site's noise floor and can desensitize the macro cell; the noise rise budget is set by the carrier or AHJ and verified by measurement at the donor site.
Required documentation for acceptance typically includes design drawings, RF path analysis, equipment data sheets, factory and field test results, grid test data with floor plans, leakage test data, and as-built records signed by the responsible technician.