Flood Response with Conflicting Messages and Self-Dispatched Resources

NIMS/ICS · Put your knowledge to work in context.

All case studies

Flood Response with Conflicting Messages and Self-Dispatched Resources

A slow-moving storm has flooded three low-lying neighborhoods in a county. The county EOC is partially activated. The town mayor has told a local radio station that residents should shelter in place, while the county emergency manager has issued a voluntary evacuation for the same area. Six volunteer fire companies have self-dispatched to the town, and three private boats are launching from a boat ramp without check-in. The sheriff has three deputies directing traffic but no radio link with the fire units. The Red Cross has opened one shelter but has not received a formal resource request. The county has not designated an Incident Commander; the fire chief and sheriff are both giving orders to their own units. By 18:00, the EOC wants a common set of objectives for the next 12 hours.

1. Identify at least three NIMS management characteristics that are not being applied in this scenario, and explain the operational risk created by each.

Read the worked answer

Three characteristics are clearly missing:

  • Management by objectives. The mayor’s shelter-in-place message and the county’s voluntary evacuation create two incompatible objectives. Residents may stay in a flooded area or evacuate into blocked roads. Risk: delayed evacuation and conflicting public instructions.
  • Chain of command and unity of command. The fire chief and sheriff are both directing their own units without a single IC or UC. A fire unit and a sheriff unit can receive different priorities for the same neighborhood. Risk: duplicated effort, unsafe traffic control, and no one accountable for the overall plan.
  • Dispatch/deployment and accountability. Six volunteer companies and three private boats are self-deploying without check-in or assignment. Risk: unaccounted personnel in moving water, no understanding of capabilities, and no way to recall them.

Comprehensive resource management is also weak because the Red Cross shelter was opened without a formal request. The shelter may not be resourced or integrated into planning. The exam point is that these are not administrative details; each gap translates directly into a safety or mission failure.

2. Recommend immediate steps to restore unity of command and a common set of objectives without undermining the elected officials.

Read the worked answer

The county EOC should facilitate a short meeting with the fire chief, sheriff, town mayor, and county emergency manager. First, designate a single Incident Commander or establish a Unified Command between fire and sheriff, since both have operational roles. Elected officials retain policy authority, but they should not issue tactical instructions to field units. The mayor and county manager should agree on one public message: either shelter in place or evacuate, based on the IC’s recommendation. The IC then sets measurable objectives for the next 12 hours, such as evacuate the three named neighborhoods by 22:00, open two shelters, and keep the main route open for emergency vehicles.

Second, issue a written or radio-broadcast order that all units will operate through the ICS chain of command. Third, establish check-in and staging for the volunteer companies and private boats. Fourth, assign a Public Information Officer or Joint Information Center to align messages from the town, county, and Red Cross.

This does not remove the mayor’s authority; it separates policy from operations. The mayor can declare emergencies and set public policy, while the IC translates that policy into a single tactical plan.

3. How should the Red Cross shelter be integrated into the operation, and which General Staff section should manage the request?

Read the worked answer

The shelter should be treated as a facility within the incident, not as an independent operation outside ICS. The proper path is a formal resource request through the Logistics Section, which coordinates feeding, cots, staffing, and supply support. The Planning Section should include the shelter in the Incident Action Plan, track its population and status, and identify whether additional shelters are needed. Operations may assign a Shelter Group or Shelter Manager if sheltering becomes a major tactical activity; Finance/Administration tracks costs and any reimbursement documentation.

The Red Cross should not be simply told to open a shelter without a request, because that creates an untracked resource and possible duplication. Conversely, command should not ignore the shelter because it was opened informally. The IC should recognize it, assign it an identifier, confirm capacity and needs, and integrate it into the next operational period. This preserves accountability and ensures that shelter population data feeds planning and public information. The General Staff section that manages the request is Logistics, but the decision to use the shelter is reflected in the Planning Section’s IAP and objectives.