NIMS/ICS case studies
NIMS/ICS · Put your knowledge to work in context.
NIMS/ICS refers to two separate FEMA Emergency Management Institute Independent Study courses that together form the entry point to incident management training. IS-100.C, Introduction to the Incident Command System, introduces ICS and provides the foundation for higher level ICS training; it describes the history, features and principles, and organizational structure of ICS, and explains the relationship between ICS and the National Incident Management System. IS-700.B, An Introduction to the National Incident Management System, gives learners a basic understanding of NIMS concepts, principles, and components, including resource management, the NIMS Management Characteristics, ICS organizational structures, Emergency Operations Center functions, and the coordination structures that link ICS, EOCs, the Joint Information System, and Multiagency Coordination Groups. Both are interactive web-based courses taken online, each with a final exam, and both require a FEMA SID account. The NIMS/ICS case studies are 5 cases and about 3,620 words.
1Rail Yard Ammonia Release: Command Structure at a Jurisdictional Boundary
At 14:20, a rail tank car containing anhydrous ammonia begins leaking at a yard that straddles the city/county line. The leak is near a residential block of 60 homes; wind is from the west at 8 mph.
745 words, about 4 min2Flood Response with Conflicting Messages and Self-Dispatched Resources
A slow-moving storm has flooded three low-lying neighborhoods in a county. The county EOC is partially activated.
742 words, about 4 min3Music Festival Heat Emergency and Command Staff Gaps
A three-day outdoor music festival is expecting 20,000 attendees per day on a 90-acre fairground. The National Weather Service has issued an excessive heat warning with a heat index of 108°F.
733 words, about 4 min4Five-Day Hurricane Shelter Operation Without a General Staff
A Category 2 hurricane is forecast to make landfall in 36 hours. The county has opened three shelters in high schools, with a combined capacity of 1,800; 1,200 evacuees are expected within 12 hours.
689 words, about 3 min5Multi-County Winter Storm: Interoperability and Credentialing
A winter storm has dropped 14 inches of snow and caused widespread power outages across three counties. Two hospitals are on generator power; one has 20 hours of fuel.
711 words, about 4 min