NITC Journey Level Plumber study materials
NITC Journey Level Plumber study resources

NITC Journey Level Plumber study plan

NITC Journey Level Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Code, Installation, and Inspection Standards & General Plumbing Knowledge and Safety

  • Map each of the eight exam domains to the code sections and installation standards it draws on, writing a one-line citation note per domain

  • State the scope, purpose, and structure of the plumbing code and identify which edition and local amendments apply in your jurisdiction

  • List the permit, inspection, and testing sequence for a typical residential rough-in and final, in order, from memory

  • Define the safety fundamentals: confined space entry, trenching and shoring basics, and PPE selection for common plumbing tasks

  • Build a personal glossary of 25 code-defined terms (e.g., fixture unit, trap seal, developed length) with your own definitions

Your checkpoint

A two-page domain-to-code map plus a 25-term glossary, self-quizzed to 90% accuracy

Week 2

Piping, Fittings, and Pipe Joining

  • Compare the approved joining methods for copper, PEX, CPVC, PVC, ABS, cast iron, and galvanized steel, and state where each is permitted and prohibited

  • Describe the correct procedure and common failure points for soldering copper and for solvent-cementing plastic pipe

  • Identify fitting types by function (wye, sanitary tee, combo, reducing coupling, dielectric union) and where each belongs in a system

  • Explain support spacing, hanger types, and protection requirements for each pipe material

  • Calculate cut lengths and fitting take-offs for a simple two-fixture branch run

Your checkpoint

A material-and-method comparison table covering at least seven pipe materials with joining, support, and restriction notes, plus one worked take-off

Week 3

Piping, Fittings, and Pipe Joining & Drain, Waste, and Vent Systems

  • Trace the path of waste from a fixture drain through the trap, branch, stack, and building drain to the sewer, naming each component

  • Size a horizontal branch and a stack from fixture-unit tables for a given fixture load

  • Explain venting categories (individual, common, wet, circuit, studor/air admittance where allowed) and the conditions each satisfies

  • Identify the causes of trap siphonage and backpressure and the venting corrections for each

  • Describe the slope, cleanout, and fitting-direction rules that govern horizontal drainage

Your checkpoint

A hand-drawn single-bathroom DWV isometric with every pipe sized from fixture units and every vent labeled by type

Week 4

Drain, Waste, and Vent Systems & Water Supply and Distribution Systems

  • Size a water service and distribution system from fixture units and developed length, accounting for pressure loss and elevation

  • Explain the difference between a direct and indirect waste, and where each is required

  • Describe backflow prevention devices and the hazard each addresses, and state where they are required

  • Lay out hot and cold distribution with correct fixture spacing and thermal-expansion provisions for plastic piping

  • Identify the water heater installation requirements: relief valve, discharge pipe, expansion control, and venting

Your checkpoint

A full water-supply sizing worksheet for a two-bath house showing fixture units, demand, pipe sizes, and residual pressure check, plus a labeled DWV/water riser diagram

Week 5

Fixtures, Faucets, and Appliances & Water Supply and Distribution Systems

  • State the installation requirements for water closets, lavatories, sinks, bathtubs, showers, and their traps and connections

  • Explain the differences among faucet types and valve cartridges, and the repair path for a dripping or leaking fixture

  • Describe the installation and venting requirements for clothes washers, dishwashers, and water heaters as appliances

  • Identify accessibility and clearance requirements for fixtures in residential and commercial settings

  • List the required fixture clearances and the minimum trap-arm and fixture-drain sizes for each common fixture

Your checkpoint

A fixture specification sheet for at least eight fixtures listing drain size, trap size, clearance, and installation notes, checked against code

Week 6

Plumbing Math, Plans, and Isometric Drawings

  • Convert between decimal inches, fractions, and metric, and compute pipe lengths, offsets, and 45/22.5-degree fitting take-offs

  • Read a floor plan and a plumbing plan and extract fixture locations, pipe sizes, and riser callouts

  • Draw an isometric from a plan view, correctly orienting horizontal and vertical runs

  • Compute grade, fall, and slope for a drainage run given length and required percent slope

  • Calculate fixture units, demand, and simple pressure loss for a worked example

Your checkpoint

A timed 20-question math and plan-reading practice set scored at 80% or better, with every missed item reworked by hand

Week 7

Code, Installation, and Inspection Standards & Maintenance, Repair, and Troubleshooting

  • Walk through a rough-in and final inspection checklist and state the test each system must pass and at what pressure

  • Diagnose five common service calls (no hot water, slow drain, running toilet, low pressure, sewer odor) and list the likely causes in order

  • Explain the procedure for hydrostatic and air testing of DWV and water systems, and the leak-isolation logic when a test fails

  • Describe maintenance tasks for water heaters, traps, valves, and sump pumps, and the interval for each

  • Identify the code violations most often cited on inspection and the correction for each

Your checkpoint

A one-page inspection checklist and a troubleshooting decision tree covering at least five service scenarios

Week 8

General Plumbing Knowledge and Safety & Code, Installation, and Inspection Standards & Drain, Waste, and Vent Systems

  • Take two full-length timed practice exams and record the score by domain

  • Rework every missed question to a written explanation of the correct answer and the code basis

  • Re-drill the two weakest domains with focused review and a short self-quiz each

  • Review the glossary, code map, and deliverable set from weeks 1 through 7 in a single pass

  • Confirm exam-day logistics: test format, allowed references, and time budget per question

Your checkpoint

A scored practice-exam log showing domain-level improvement from the first attempt to the second, with all missed items reworked

Milestones

Week 2: Can state joining method, support spacing, and restriction for seven pipe materials without notes, and score 80% or better on a self-made joining quiz

Week 4: Can size a DWV branch and a water distribution run from fixture units and produce a correct isometric without reference to worked examples

Week 6: Scores 80% or better on a timed 20-question math and plan-reading set and can draw an isometric from a plan in under 15 minutes

Week 8: Second full-length practice exam improves on the first by at least 10 percentage points overall, with no domain below 70%