NITC Journey Level Plumber study plan
NITC Journey Level Plumber · Give each week a clear focus.
8 weeks · About 7 hours per week
Code, Installation, and Inspection Standards & General Plumbing Knowledge and Safety
Map each of the eight exam domains to the code sections and installation standards it draws on, writing a one-line citation note per domain
State the scope, purpose, and structure of the plumbing code and identify which edition and local amendments apply in your jurisdiction
List the permit, inspection, and testing sequence for a typical residential rough-in and final, in order, from memory
Define the safety fundamentals: confined space entry, trenching and shoring basics, and PPE selection for common plumbing tasks
Build a personal glossary of 25 code-defined terms (e.g., fixture unit, trap seal, developed length) with your own definitions
Your checkpoint
A two-page domain-to-code map plus a 25-term glossary, self-quizzed to 90% accuracy
Piping, Fittings, and Pipe Joining
Compare the approved joining methods for copper, PEX, CPVC, PVC, ABS, cast iron, and galvanized steel, and state where each is permitted and prohibited
Describe the correct procedure and common failure points for soldering copper and for solvent-cementing plastic pipe
Identify fitting types by function (wye, sanitary tee, combo, reducing coupling, dielectric union) and where each belongs in a system
Explain support spacing, hanger types, and protection requirements for each pipe material
Calculate cut lengths and fitting take-offs for a simple two-fixture branch run
Your checkpoint
A material-and-method comparison table covering at least seven pipe materials with joining, support, and restriction notes, plus one worked take-off
Piping, Fittings, and Pipe Joining & Drain, Waste, and Vent Systems
Trace the path of waste from a fixture drain through the trap, branch, stack, and building drain to the sewer, naming each component
Size a horizontal branch and a stack from fixture-unit tables for a given fixture load
Explain venting categories (individual, common, wet, circuit, studor/air admittance where allowed) and the conditions each satisfies
Identify the causes of trap siphonage and backpressure and the venting corrections for each
Describe the slope, cleanout, and fitting-direction rules that govern horizontal drainage
Your checkpoint
A hand-drawn single-bathroom DWV isometric with every pipe sized from fixture units and every vent labeled by type
Drain, Waste, and Vent Systems & Water Supply and Distribution Systems
Size a water service and distribution system from fixture units and developed length, accounting for pressure loss and elevation
Explain the difference between a direct and indirect waste, and where each is required
Describe backflow prevention devices and the hazard each addresses, and state where they are required
Lay out hot and cold distribution with correct fixture spacing and thermal-expansion provisions for plastic piping
Identify the water heater installation requirements: relief valve, discharge pipe, expansion control, and venting
Your checkpoint
A full water-supply sizing worksheet for a two-bath house showing fixture units, demand, pipe sizes, and residual pressure check, plus a labeled DWV/water riser diagram
Fixtures, Faucets, and Appliances & Water Supply and Distribution Systems
State the installation requirements for water closets, lavatories, sinks, bathtubs, showers, and their traps and connections
Explain the differences among faucet types and valve cartridges, and the repair path for a dripping or leaking fixture
Describe the installation and venting requirements for clothes washers, dishwashers, and water heaters as appliances
Identify accessibility and clearance requirements for fixtures in residential and commercial settings
List the required fixture clearances and the minimum trap-arm and fixture-drain sizes for each common fixture
Your checkpoint
A fixture specification sheet for at least eight fixtures listing drain size, trap size, clearance, and installation notes, checked against code
Plumbing Math, Plans, and Isometric Drawings
Convert between decimal inches, fractions, and metric, and compute pipe lengths, offsets, and 45/22.5-degree fitting take-offs
Read a floor plan and a plumbing plan and extract fixture locations, pipe sizes, and riser callouts
Draw an isometric from a plan view, correctly orienting horizontal and vertical runs
Compute grade, fall, and slope for a drainage run given length and required percent slope
Calculate fixture units, demand, and simple pressure loss for a worked example
Your checkpoint
A timed 20-question math and plan-reading practice set scored at 80% or better, with every missed item reworked by hand
Code, Installation, and Inspection Standards & Maintenance, Repair, and Troubleshooting
Walk through a rough-in and final inspection checklist and state the test each system must pass and at what pressure
Diagnose five common service calls (no hot water, slow drain, running toilet, low pressure, sewer odor) and list the likely causes in order
Explain the procedure for hydrostatic and air testing of DWV and water systems, and the leak-isolation logic when a test fails
Describe maintenance tasks for water heaters, traps, valves, and sump pumps, and the interval for each
Identify the code violations most often cited on inspection and the correction for each
Your checkpoint
A one-page inspection checklist and a troubleshooting decision tree covering at least five service scenarios
General Plumbing Knowledge and Safety & Code, Installation, and Inspection Standards & Drain, Waste, and Vent Systems
Take two full-length timed practice exams and record the score by domain
Rework every missed question to a written explanation of the correct answer and the code basis
Re-drill the two weakest domains with focused review and a short self-quiz each
Review the glossary, code map, and deliverable set from weeks 1 through 7 in a single pass
Confirm exam-day logistics: test format, allowed references, and time budget per question
Your checkpoint
A scored practice-exam log showing domain-level improvement from the first attempt to the second, with all missed items reworked
Milestones
Week 2: Can state joining method, support spacing, and restriction for seven pipe materials without notes, and score 80% or better on a self-made joining quiz
Week 4: Can size a DWV branch and a water distribution run from fixture units and produce a correct isometric without reference to worked examples
Week 6: Scores 80% or better on a timed 20-question math and plan-reading set and can draw an isometric from a plan in under 15 minutes
Week 8: Second full-length practice exam improves on the first by at least 10 percentage points overall, with no domain below 70%