MAWP
Maximum allowable working pressure, the highest pressure at which a boiler or pressure vessel may be operated, stamped on the nameplate and used to set safety valve pressure.
Fusible plug
A brass fitting with a low-melting alloy core installed in the crown sheet or firebox; it melts near 445 °F to warn of low water and prevent overheating of pressure parts.
Water column
A vertical fitting connected to the boiler at water and steam spaces that mounts the gauge glass and low-water cutoff, keeping their connections clear of sludge and foam.
Staybolt
A rod threaded into two plates to hold them together against pressure loads; it is designed to bend rather than pull apart when the plates flex with temperature.
Stoichiometric air
The exact amount of air needed to burn all fuel completely with no excess oxygen; for natural gas it is about 17.3 pounds of air per pound of fuel.
Excess air
Air supplied above the theoretical requirement to ensure complete combustion; too little produces CO, too much wastes heat up the stack.
Trial for ignition
The limited time (about 10 seconds for gas, 15 seconds for oil) during which the burner may prove flame before the fuel valve must close.
Three-element control
Drum level control that uses steam flow, feedwater flow, and drum level signals together to correct for shrink and swell during load changes.
Hydrostatic test
A pressure test using water at 1.5 times MAWP for new construction or 1.25 times for in-service repairs, held to inspect joints for leaks.
Ultrasonic thickness testing
A nondestructive method that measures remaining wall thickness with sound waves; readings are compared to nominal thickness to detect corrosion loss.
Post-weld heat treatment
Controlled heating of a completed weld to relieve residual stress and drive off hydrogen, required for thick sections and certain alloys.
Joint efficiency
A factor (E) in pressure vessel design equations that accounts for the strength lost at welded or riveted seams compared with solid plate.
Corrosion allowance
Extra wall thickness added to the calculated minimum so the vessel can lose metal to corrosion over its design life and still be safe.
B31.1 and B31.3
ASME piping codes: B31.1 covers power piping in boiler plants, B31.3 covers process piping in chemical and refinery service; their stress rules differ.
Rupture disc
A one-time pressure relief device that bursts at a set pressure; often installed ahead of a relief valve to protect it from corrosive or fouling fluid.
Rankine cycle
The thermodynamic cycle of a steam power plant; efficiency improves with higher steam pressure and temperature and with lower condenser pressure.
Turbine heat rate
The heat energy input required per unit of electrical output, usually Btu per kWh; a lower heat rate means a more efficient turbine cycle.
Overspeed trip
A protective device that stops steam or fuel to a turbine when speed reaches about 110% of rated speed, preventing catastrophic rotor failure.
NPSH
Net positive suction head, the absolute pressure margin above vapor pressure at the pump suction; available NPSH must exceed required NPSH to avoid cavitation.
Affinity laws
Pump scaling rules: flow changes with speed, head with speed squared, and power with speed cubed when impeller diameter is held constant.
Compressor surge
A flow reversal that occurs when compressor flow drops below the surge line; an anti-surge valve recycles flow to keep the machine stable.
4–20 mA loop
An analog signal standard where 4 mA represents the live zero and 20 mA full scale; a 0 mA reading indicates a broken wire.
RTD Pt100
A resistance temperature detector with 100 ohms at 0 °C and about 0.385 ohms per degree Celsius change, used for accurate temperature measurement.
Safety integrity level
A SIL rating (1 to 4) assigned to a safety instrumented function based on its required risk reduction factor, with SIL 3 about 1,000 to 10,000.
Oxygen pitting
Localized corrosion caused by dissolved oxygen attacking steel; prevented by deaeration plus a chemical oxygen scavenger such as sodium sulfite.
Conductivity blowdown
Control of boiler blowdown rate based on measured dissolved solids conductivity, keeping solids low enough to prevent carryover and foaming.
Caustic embrittlement
Stress corrosion cracking of steel at high stress and high caustic concentration, historically in riveted seams; avoided by coordinated phosphate treatment.
Full-load amperes
The current a motor draws at rated load and voltage, listed on the nameplate and used to set overload protection at about 115 to 125 percent.
Locked-rotor current
The high inrush current, typically five to seven times full-load current, that flows while an induction motor is starting and before it accelerates.
ASME Section I
The ASME code section covering power boilers, including rules for design, materials, fabrication, inspection, and the required safety valve capacity.
R stamp
An ASME Certificate of Authorization that allows a repair organization to repair or alter pressure-retaining items in boilers and pressure vessels.