Week 1

Boiler Construction, Fittings, and Accessories

  • Sketch and label the major pressure-boundary parts of a fire-tube and a water-tube boiler from memory, then check the sketch against a reference text and correct every miss.

  • Explain in writing why the crown sheet, tube sheet, and furnace are the highest-risk areas for overheating and collapse, citing water-level and scale effects.

  • Match each fitting to its function - safety valve, main steam stop, feed check, bottom blowdown, surface blowdown, water column, gauge glass, low-water cutoff - and state where each is mounted and why.

  • Identify the trim and accessories found on a typical packaged boiler (economizer, air preheater, superheater, sootblower, manhole and handhole openings) and describe what each does to efficiency or access.

  • Answer 30 self-written recall questions on construction and fittings without notes, logging every wrong answer in an error list.

Your checkpoint

A one-page labeled boiler diagram plus a 25-row fitting table (name, function, mounting location, failure symptom) reviewed against a reference and corrected.

Week 2

Boiler Operation, Combustion, and Controls

  • Sequence the cold start-up of a packaged boiler from pre-start checks through main steam valve opening, naming the interlock that must be proven at each step.

  • Describe the light-off and flame-safeguard sequence - purge, pilot, main flame, flame scanner response - and state the consequence of a failed purge or a lost flame signal.

  • Explain how a modulating combustion control loop uses steam pressure, fuel flow, and air flow to hold setpoint, and why air must lead on increase and lag on decrease.

  • Diagnose five written fault scenarios (short cycling, low-water trip, flame failure on light-off, high stack temperature, sluggish pressure response) and propose the first three checks for each.

  • Perform a dry-run narration of a normal shutdown and an emergency shutdown, stating the valve and burner actions in order.

Your checkpoint

A written start-up and shutdown checklist with at least 15 sequenced steps and the interlock proven at each, scored against a reference procedure.

Week 3

Steam and Hot Water Systems, Piping, and Valves & Fuels, Combustion, and Draft Systems

  • Trace a steam header from boiler to process, labeling the main stop, non-return valve, drip legs and traps, expansion loops, and the supports that carry the line.

  • Explain why drain points and steam traps are placed at low points and ahead of valves, and describe water hammer causes and prevention in a written paragraph.

  • Size the role of each valve type - gate, globe, ball, check, safety relief - by matching it to a service where it belongs and one where it does not.

  • Describe the four phases of combustion and explain excess air, theoretical air, and why both too little and too much air cost efficiency.

  • Read a written flue-gas scenario (O2, CO, stack temperature) and state what it says about air/fuel ratio and heat loss.

Your checkpoint

A piping-and-valve schematic of a simple steam system with at least 10 labeled components and a one-paragraph water hammer prevention note.

Week 4

Pumps, Compressors, and Auxiliary Equipment & Electrical and Instrumentation Fundamentals

  • Explain how a centrifugal pump builds head, what cavitation sounds and looks like, and the difference between NPSH available and required.

  • Describe the correct start-up and shut-off procedure for a centrifugal feedwater pump and why a running pump must not be valved off dead-headed.

  • Compare reciprocating, rotary, and centrifugal compressors by application, and explain why compressors need unloading controls and aftercoolers.

  • Identify the basic electrical components of a burner control circuit - disconnect, fuse, transformer, limit switch, relay, flame programmer, motor starter - and state the function of each.

  • Explain how a thermocouple or RTD produces a signal and how a 4-20 mA loop represents a measured range, including what a reading below 4 mA usually means.

Your checkpoint

A pump and compressor troubleshooting sheet covering at least eight symptoms with likely cause and first check, plus a labeled sketch of a burner control circuit.

Week 5

Feedwater Treatment and Water Chemistry & Safety, Codes, and Regulatory Compliance

  • Explain the damage mechanisms of scale, sludge, corrosion, and carryover, and tie each to a specific feedwater or boiler water test.

  • Describe what each of these tests measures and the corrective action for an out-of-range result: hardness, alkalinity, pH, conductivity, dissolved oxygen, sulfite, phosphate.

  • Outline a blowdown and chemical-feed routine that keeps boiler water within limits without wasting fuel or water.

  • State in writing the purpose of the ASME Boiler and Pressure Vessel Code, the NBIC, and the jurisdiction's boiler rules, and how they interact for an operating plant.

  • Describe the duties of the boiler inspector, what records must be available at inspection, and the operator's legal responsibility when a boiler is found unsafe.

Your checkpoint

A water-chemistry log template with at least six parameters, target ranges, and a corrective action column, plus a one-page summary of code and jurisdiction responsibilities.

Week 6

Maintenance, Inspection, and Testing & Safety, Codes, and Regulatory Compliance

  • Build a preventive maintenance calendar covering burner tuning, safety-valve testing, low-water cutoff testing, gauge glass cleaning, trap inspection, and refractory checks.

  • Explain the correct procedure and frequency for a try-lever and a pop test of a safety valve, and why a valve must never be gagged or over-tightened.

  • Describe how to test a low-water fuel cutoff by evaporating the glass and by blowing down the float chamber, and what a failed test requires.

  • Explain hydrostatic testing, what it proves, and why it is performed under jurisdiction control rather than at operator discretion.

  • List the non-destructive examinations used on boilers (visual, ultrasonic thickness, magnetic particle, dye penetrant, radiography) and what each detects.

Your checkpoint

A 12-month maintenance calendar with at least 10 recurring tasks, frequency, responsible role, and record kept.

Week 7

Basic Mathematics, Thermodynamics, and Applied Science & Boiler Operation, Combustion, and Controls

  • Convert between gauge and absolute pressure and between Fahrenheit and Celsius, and compute heat input, steam output, and boiler efficiency from given fuel and steam data.

  • Apply the sensible-heat, latent-heat, and superheat concepts to explain why steam quality and moisture content matter to a turbine or process load.

  • Calculate combustion air and excess air from a given flue-gas oxygen reading and explain the result in plain language.

  • Solve at least 15 timed practice problems mixing unit conversion, efficiency, and heat-transfer calculations, and rework every miss until correct.

  • Re-explain the combustion control loop from week 2 using the calculated efficiency numbers to justify air/fuel decisions.

Your checkpoint

A worked problem set of 15 calculations with units shown at every step, plus a one-page formula sheet in your own words.

Week 8

Boiler Construction, Fittings, and Accessories & Boiler Operation, Combustion, and Controls & Steam and Hot Water Systems, Piping, and Valves & Pumps, Compressors, and Auxiliary Equipment & Fuels, Combustion, and Draft Systems & Feedwater Treatment and Water Chemistry & Safety, Codes, and Regulatory Compliance & Maintenance, Inspection, and Testing & Electrical and Instrumentation Fundamentals & Basic Mathematics, Thermodynamics, and Applied Science

  • Take two full-length timed practice exams under exam conditions and record the score by domain to find remaining weak areas.

  • Rework every missed question to the underlying principle, not just the right letter, and close each gap with a short written note.

  • Recite the safety-critical facts from memory: low-water trip response, safety-valve rules, purge requirements, and shutdown sequence.

  • Review the error lists from weeks 1 through 7 and confirm each entry is now understood or flagged for further study.

Your checkpoint

Two timed practice exam score sheets with per-domain breakdown, plus a final one-page list of remaining weak areas and the specific action to fix each.

Milestones

Week 2: Can narrate a full boiler start-up, light-off, and shutdown sequence with interlocks, scoring at least 90 percent on the week 2 checklist.

Week 4: Scores at least 75 percent on a self-made 40-question quiz covering domains 1 through 5, with no safety-critical item wrong.

Week 6: Can state the water-chemistry limits, the inspection and testing duties, and the code responsibilities without notes, and has a complete maintenance calendar.

Week 8: Scores at least 80 percent overall on both timed practice exams with no domain below 70 percent, and every missed item has a written corrective note.