Quick reference

NCEES FS (Fundamentals of Surveying)

  • Angular closure: sum of interior angles of a closed traverse = (n − 2) × 180°; compare observed sum to this value and distribute the misclosure equally (or by angle size) among the angles.

  • Latitude = distance × cos(azimuth); departure = distance × sin(azimuth). Linear misclosure = √(Σlat² + Σdep²); relative precision = misclosure ÷ total traverse length.

  • Compass rule (Bowditch): correction to a latitude or departure = −(total misclosure in that component) × (course length ÷ total traverse length). Transit rule distributes corrections proportional to the component magnitudes.

  • Curve formulas: R = 5729.58 ÷ D (degree of curve, arc definition); T = R tan(Δ/2); L = R·Δ(radians) = 100·Δ/D; M = R[1 − cos(Δ/2)]; external E = R[sec(Δ/2) − 1].

  • Differential leveling: ΔElev = backsight − foresight. Misclosure = observed elevation difference − known difference; permissible misclosure for a precise level run is commonly stated as C√M with M in miles and C = 0.02–0.05 ft.

  • Trigonometric leveling (short lines): ΔElev = S·sin(zenith angle) + (1 − k)·S²/(2R), where k ≈ 0.13 is refraction coefficient and R is Earth radius; correct for curvature and refraction.

  • State plane coordinates: grid distance = ground distance × (elevation factor) × (scale factor), where elevation factor ≈ R/(R + h). Ground-to-grid conversions are required before computing coordinates.

  • Area by coordinates (shoelace): 2A = Σ(Xi·Yi+1 − Xi+1·Yi) around the closed traverse; area by double meridian distances: double area = Σ(DMD × departure) for each course.

  • Error propagation: for a sum or difference, uncertainties add in quadrature; for a product or quotient, relative uncertainties add in quadrature. Standard error of the mean = s/√n.

Quick reference

NCEES PS (Principles and Practice of Surveying)

  • ALTA/NSPS Land Title Survey: Table A optional items are selected by the client in writing; the surveyor must show easements, rights-of-way, and observed evidence of possession, and must state the basis of bearings and the date of fieldwork.

  • Horizontal/vertical datum: NAD83 (2011) is the current horizontal realization; NAVD88 is the vertical datum. State plane zone scale factors and combined factors must be reported when grid coordinates are shown.

  • Minimum standards for boundary retracement: follow the order of calls - natural monuments, artificial monuments, courses and distances, area; do not establish new lines where the original survey can be retraced.

  • Adverse possession requires actual, open, notorious, exclusive, hostile, and continuous possession for the statutory period; prescriptive easements require similar open and continuous use without exclusivity.

  • Riparian boundaries: for non-tidal navigable waters, the boundary is the ordinary high water mark; for tidal waters, the mean high water line is commonly used. Accretion belongs to the upland owner; avulsion does not move the boundary.

  • Subdivision plat review: check that the plat shows bearings and distances of all lines, curve data (R, L, Δ, chord, tangent), monument ties, dedications, and the surveyor's seal and certification per state statute.

  • Construction layout: compute cut/fill from design grades versus existing elevations; set offset stakes at the specified offset from the design line; verify control with a closed traverse before layout.

  • GPS/GNSS: use a minimum of 5 satellites for RTK; PDOP indicates geometric strength (lower is better). Network RTK requires a calibrated geoid model to convert ellipsoid heights to orthometric heights.

  • Professional liability: the standard of care is that of a reasonably prudent surveyor under similar circumstances; written contracts should define scope, deliverables, and limitations of the survey.