- Ohm's law
- Current equals voltage divided by resistance (I = E/R). For AC circuits with reactance, impedance Z replaces resistance, and the current and voltage may be out of phase.
- Voltage drop formula
- Single-phase VD = 2 × K × I × L ÷ CM, with K about 12.9 for copper. Three-phase uses 1.732 instead of 2. Keep total drop within limits.
- Box fill calculation
- Count each conductor by its volume allowance (14 AWG = 2.0 in³, 12 AWG = 2.25 in³), add device and grounding allowances, and compare with the box's marked volume.
- Ampacity correction factors
- Table ampacities are adjusted for elevated ambient temperature and for more than three current-carrying conductors in a raceway. Both factors apply when both conditions exist.
- Class 2 circuit limits
- A Class 2 circuit is limited to 30 volts and 100 volt-amperes under the power-supply listing. Its cable and wiring methods must match the location, such as plenum or riser.
- Equipment grounding conductor
- A conductor that provides a low-impedance fault-current path back to the source, allowing the overcurrent device to open. It carries current only during a fault.
- Motor branch circuit sizing
- Branch-circuit conductors are at least 125 percent of motor nameplate current. Overload protection is sized from nameplate current; short-circuit protection from the locked-rotor table.
- Three-phase power
- Real power for a balanced three-phase load equals 1.732 × E × I × power factor. Apparent power in volt-amperes omits the power factor.
- NEC Article 725 scope
- Article 725 governs Class 1, 2, and 3 remote-control, signaling, and power-limited circuits. It sets voltage, power, and wiring-method limits for these circuits.
- Plenum cable marking
- CL2P and CL3P cables are listed for installation in air-handling plenums. CL2R and CL3R are riser-rated. Using the wrong listing in a plenum violates the code.
- Working clearance depth
- NEC 110.26 requires 3 ft depth at 0–150 volts to ground, 3.5 ft at 151–300 volts, and 4 ft at 301–600 volts in front of electrical equipment.
- GFCI protection locations
- Dwelling bathrooms, kitchens, garages, outdoors, unfinished basements, and receptacles within 6 ft of a sink require ground-fault circuit-interrupter protection under the NEC.
- Intersystem bonding termination
- A listed means to connect communications, antenna, and other low-voltage system grounding conductors to the building grounding electrode system, using at least 14 AWG copper.
- Listed versus approved
- Listed means equipment appears in a list published by a nationally recognized testing laboratory. Approved means acceptable to the authority having jurisdiction, which may require listing.
- Conduit fill tables
- NEC Chapter 9 Table 1 gives allowable percent fill by conductor count; Table 4 gives conduit dimensions; Table 5 gives insulated conductor dimensions used in fill calculations.
- AFCI requirement
- Arc-fault circuit-interrupter protection is required for most 120-volt branch circuits in dwellings, including bedrooms, to detect arcing that can start a fire.
- Electrical Contractors Licensing Act
- N.J.S.A. 45:5A-1 et seq., enacted in 1962, created the Board of Examiners of Electrical Contractors and requires licensing to perform electrical contracting work for compensation.
- Responsible licensee
- A licensed electrical contractor business must designate a master electrician as the responsible licensee. If that person leaves, the business must promptly designate a replacement.
- License classes
- New Jersey licenses electrical contractors, master electricians, journeyman electricians, and qualified journeymen. Each class has separate qualifications, examination requirements, and scope of work.
- Board disciplinary grounds
- The Board may discipline licensees for fraud, gross negligence, code violations, failure to obtain permits, and aiding unlicensed practice, with penalties up to revocation and fines.
- Unlicensed practice penalty
- Performing electrical contracting without a license, or helping an unlicensed person do so, violates the Act and exposes the violator to civil penalties enforced by the Board.
- Continuing education renewal
- License renewal requires continuing education hours set by Board regulation. Licensees must track and submit completed hours and keep records supporting the renewal.
- License number display
- Board rules require the license number to appear on advertisements, contracts, and business vehicles. Changes of address or responsible licensee must be reported to the Board.
- Electrical permit requirement
- Electrical work requires a permit from the local enforcing agency before starting. The electrical subcode official issues permits and inspects the completed work.
- Rough and final inspections
- The Uniform Construction Code requires a rough inspection before wiring is concealed and a final inspection after completion. Concealed work must be approved before covering.
- Certificate of occupancy
- The construction official issues a certificate of occupancy only after all subcode approvals, including electrical, are obtained. Without it, the space may not be legally occupied.
- Home improvement registration
- Residential electrical contracting may also require registration with the Division of Consumer Affairs as a home improvement contractor, separate from the electrical contractor license.
- Lockout/tagout
- OSHA and NJ PEOSH require de-energizing and locking out circuits before work. Energized work requires justification, PPE, and documented safe work practices.
- Assured grounding program
- A written assured equipment grounding conductor program permits cord sets and tools to be tested at set intervals instead of using GFCI protection on construction sites.
- Insurance verification
- Before signing a contract, verify the general liability and workers' compensation certificates of insurance and review indemnification and additional-insured clauses carefully.
- Job record retention
- Retain permits, inspection approvals, test results, and as-built drawings. These records support warranty claims, change-order disputes, and defense of code-compliance allegations.