NORMI CMA study materials
NORMI CMA study resources

NORMI CMA study plan

NORMI CMA · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Mold and microbial assessment

  • Define the difference between mold, mildew, and other microbial growth, and explain why the distinction matters in an assessment report.

  • List the four conditions microbial growth requires (moisture, organic food source, suitable temperature, spores) and describe how each is documented during an inspection.

  • Identify common indicator organisms and the categories of fungi encountered indoors, without relying on species-level identification from air samples alone.

  • Explain the limitations of spore trap and culturable sampling so you can justify sampling decisions in writing.

Your checkpoint

A one-page decision flowchart that starts at 'client reports musty odor' and ends at a documented sampling or no-sampling recommendation, with a written rationale for each branch.

Week 2

Mold and microbial assessment

  • Describe the moisture-mapping walkthrough: roof, plumbing, HVAC, grade, and building envelope, and note what evidence each area yields.

  • Differentiate concealed versus visible growth and state how each is documented when direct access is limited.

  • Compare moisture meters, thermal imaging, and humidity readings, and specify what each instrument can and cannot prove.

  • Draft the assessment report sections: scope, methodology, observations, sampling data, and limitations.

Your checkpoint

A complete mock assessment report for a fictional 1,200 sq ft single-family home with a bathroom exhaust defect, including a labeled moisture map and a limitations section of at least 150 words.

Week 3

Mold and microbial remediation

  • Explain the purpose of containment and identify when full containment versus limited containment is appropriate.

  • Describe the role of negative pressure and how differential pressure is verified and monitored during a project.

  • Outline personal protective equipment selection for remediation workers by task and contamination level.

  • Sequence the standard remediation workflow from emergency response through post-remediation verification.

Your checkpoint

A written work-practice plan for a 200 sq ft basement mold project covering containment type, pressure monitoring, PPE, and a day-by-day task sequence.

Week 4

Mold and microbial remediation

  • Explain the difference between cleaning, disinfection, and remediation, and why 'spray and pray' fogging is generally inadequate.

  • Describe HEPA vacuuming, demolition, and removal of porous materials, and state which materials can be cleaned versus must be removed.

  • Define post-remediation verification criteria and explain why clearance depends on both visual inspection and, where used, sampling.

  • Identify common causes of remediation failure, including re-wetting, incomplete drying, and premature clearance.

Your checkpoint

A comparison table of at least eight building materials listing whether each can be cleaned or must be removed, with a one-sentence justification and the verification method used for each.

Week 5

Indoor air quality (IAQ) and allergens

  • Explain the relationship between moisture, relative humidity, and indoor microbial amplification, and state typical target RH ranges.

  • Describe how building ventilation, filtration, and pressure differentials influence indoor pollutant and allergen concentrations.

  • Differentiate mold spores from other indoor allergens such as dust mites, pet dander, and cockroach residue, and explain why remediation alone may not resolve symptoms.

  • Interpret the meaning of 'normal' versus 'elevated' airborne spore levels and articulate the uncertainty in such comparisons.

Your checkpoint

A two-page client-facing explainer on indoor humidity and allergen control, written at a general-audience reading level, with at least five actionable recommendations.

Week 6

Indoor air quality (IAQ) and allergens & Sanitization, monitoring and professional practice/ethics

  • Summarize the health effects associated with damp indoor environments and the populations at higher risk, without diagnosing individuals.

  • Describe the scope of a general indoor air quality walkthrough and how it differs from a mold-specific assessment.

  • Explain how sampling results should and should not be communicated to occupants, including the use of comparison or baseline samples.

  • Identify when to refer a client to a physician, industrial hygienist, or structural engineer.

Your checkpoint

A written protocol for communicating sampling results to a client, including a scripted explanation of a result with elevated spore counts and at least three explicit boundaries on your professional scope.

Week 7

Sanitization, monitoring and professional practice/ethics

  • Describe appropriate cleaning and sanitization methods for surfaces, HVAC components, and contents, and distinguish sanitizing from disinfecting.

  • Outline a monitoring program including moisture checks, humidity logging, and scheduled visual inspections after remediation.

  • Explain conflict-of-interest concerns when the same firm assesses and remediates, and how to structure roles to avoid them.

  • Draft a scope-of-work document that clearly separates assessment findings from remediation recommendations.

Your checkpoint

A post-remediation monitoring plan for a fictional commercial building, specifying monitoring frequency, instruments, acceptance thresholds, and who is responsible for each check.

Week 8

Mold and microbial assessment & Mold and microbial remediation & Indoor air quality (IAQ) and allergens & Sanitization, monitoring and professional practice/ethics

  • Synthesize all four domains into a single end-to-end case review from first call to closure.

  • Identify and correct your weakest domain using a self-scored practice set of at least 60 questions.

  • Rehearse written explanations of technical findings in plain language for a non-technical client.

  • Confirm your understanding of professional ethics and reporting obligations before exam day.

Your checkpoint

A full mock case file for one building: assessment report, remediation plan, verification criteria, monitoring schedule, and a one-page ethics statement, all internally consistent.

Milestones

Week 2: You can produce a complete assessment report from a property description without referencing any template or external figure.

Week 4: You can defend, in writing, both a clean-and-keep and a remove-and-replace decision for the same material type.

Week 6: You can explain a spore count result to a worried homeowner in under three minutes while staying inside your professional scope.

Week 8: Your mock case file passes a self-audit: every recommendation traces to a documented observation, and no section contradicts another.