The Nepal Engineering Council (NEC) is the statutory body that regulates and promotes the engineering profession in Nepal. It was formed on 11 March 1999 under The Nepal Engineering Council Act, and its mandate includes registration of the names of engineers as per their qualifications. Civil engineering is one of the disciplines registered through the Council, and the NEC civil engineering licence examination is the route by which a civil engineering graduate demonstrates the professional competence required for registration and for the title of Professional Engineer (PE). Candidates typically sit it after completing an accredited civil engineering degree, and practising engineers sometimes attempt it years later, so preparation must be self-directed. The NEC Civil Engineering case studies are 5 cases and about 3,837 words.
1Contaminated Fill on a Highway Embankment
A contractor is delivering a £6.2 million NEC4 ECC Option B highway embankment for a local authority. The Scope requires 38,000 m³ of Class 2 fill placed in 10 weeks.
789 words, about 4 min2Unmapped 11 kV Cable Delays Piling
A contractor is working under a £14 million NEC4 ECC Option C target-cost contract to upgrade a sewage treatment works. The PM's Site Information shows an 11 kV cable route clear of the new inlet works.
806 words, about 4 min3Precast Beam Fails Strength Test
A contractor is replacing a 90-year-old road bridge under a £3.5 million NEC4 ECC Option A contract. The Scope specifies 12 precast concrete edge beams with a 28-day cube strength of 50 MPa.
774 words, about 4 min4Exceptional Rainfall on a Coastal Defence Scheme
A contractor is constructing a £9 million NEC4 ECC Option C coastal defence scheme. The contract includes weather data: October mean rainfall 85 mm and 90th-percentile 120 mm.
730 words, about 4 min5Conflicting Pipe Diameters and Late Notification
A contractor is laying 4.2 km of water main under a £5.4 million NEC4 ECC Option B contract. The Scope contains a drawing showing 600 mm diameter pipe and a specification clause requiring 500 mm.
738 words, about 4 min