NRCA ProCertified Asphalt Shingle Installer study materials
NRCA ProCertified Asphalt Shingle Installer study resources

NRCA ProCertified Asphalt Shingle Installer study plan

NRCA ProCertified Asphalt Shingle Installer · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Jobsite Safety and Fall Protection & Asphalt Shingle Application and Fastening

  • List the six required fall-protection components for residential steep-slope work (guardrail, safety net, personal fall-arrest system, warning line, slide guard, and roofing bracket/safety monitor combinations) and state the trigger conditions for each

  • Calculate roof slope from rise and run for five sample roofs and decide which OSHA fall-protection threshold category each falls into

  • Demonstrate correct placement and spacing rules for roof jacks and slide guards on a 6:12 and a 9:12 example, in writing

  • Identify the three most common asphalt shingle fastening defects (high nailing, overdriving, underdriving) and describe the wind and seal consequences of each

Your checkpoint

A one-page fall-protection decision flowchart plus a 20-item self-quiz on slope math and fastening defects, scored and corrected

Week 2

Asphalt Shingle Application and Fastening & Roof Deck and Underlayment Preparation

  • Sequence the shingle application steps for a gable-roof field: starter course, first course offset, racking pattern, and ridge cap order

  • State the manufacturer-specified nail placement zone on a standard three-tab and a laminated shingle and explain why nailing above the exposure line fails inspection

  • Describe deck preparation acceptance criteria: sheathing thickness, span rating, fastener schedule, and gap tolerances for panel and board decks

  • Compare underlayment options (asphalt-saturated felt weights, synthetic membranes, ice-dam membrane) and match each to the slope and eave conditions where it is required

Your checkpoint

A written 12-step shingle installation sequence with the nail-placement diagram drawn by hand and annotated

Week 3

Asphalt Shingle Application and Fastening

  • Compute material quantities: convert roof area to squares, add the correct waste factor for hip, gable, and complex roofs, and total nails at the specified count per shingle

  • Explain the difference between standard and high-wind nailing patterns and state when six nails replace four

  • Describe proper starter-course installation for both rake edges and eave edges and the consequences of omitting starter

  • Diagnose five written field scenarios describing shingle misalignment, exposed fasteners, and inadequate offset and prescribe the correction

Your checkpoint

A completed takeoff worksheet for a sample 32-square hip roof with waste factor, nail count, and ridge/hip cap linear footage shown

Week 4

Flashing, Valleys, and Penetration Detailing

  • Detail step flashing at a sidewall: layer order, shingle-to-wall intersection, and counterflashing attachment

  • Explain valley construction for open and closed (woven) valleys, including underlayment, valley metal, and clipping of shingle edges

  • Describe pipe-boot, skylight, and chimney flashing sequences in correct water-shedding order

  • State the code and manufacturer requirements for ice-dam protection at eaves, valleys, and penetrations in cold climates

Your checkpoint

A hand-drawn flashing detail sheet covering sidewall, valley, chimney, and pipe penetration, each labeled with layer order

Week 5

Flashing, Valleys, and Penetration Detailing & Ventilation and Moisture Control

  • Calculate net free ventilation area for a sample attic using the 1/150 and 1/300 rules and balance intake against exhaust

  • Describe ridge-vent, soffit-vent, and gable-vent installation and the common intake-blockage mistakes that defeat exhaust

  • Explain how unbalanced or missing ventilation produces condensation, deck rot, and shingle overheating, and how each appears during inspection

  • Detail drip-edge and rake-edge metal installation and its role in water management at the eave

Your checkpoint

A ventilation calculation worksheet for two sample attics showing required NFA, proposed vent counts, and intake-to-exhaust balance

Week 6

Manufacturer Instructions and Building Code Compliance & Roof Deck and Underlayment Preparation

  • Locate and summarize the shingle-related provisions in the IRC roofing chapter: slope limits, underlayment requirements, and fastening

  • Read a manufacturer installation instruction set and extract the five requirements most often cited in failed inspections

  • Compare manufacturer instructions against code where they differ and state the rule for which governs

  • Identify the documentation a contractor must retain (product data sheets, warranty terms, permit inspections) and why

Your checkpoint

A two-column compliance checklist mapping ten code requirements to their matching manufacturer instructions, with any conflicts flagged

Week 7

Roof Inspection, Repair, and Defect Recognition

  • Build an inspection checklist covering deck, underlayment, flashing, fastening, and ventilation that can be walked in order

  • Recognize and name eight shingle defects from written descriptions: curling, clawing, fishmouthing, blistering, granule loss, thermal cracking, slippage, and hail bruising

  • Distinguish installation-caused defects from manufacturing defects and weather damage, and state the evidence that separates them

  • Write a repair scope for three sample defect scenarios, including whether repair or replacement is warranted

Your checkpoint

A completed inspection checklist applied to a written case study, with a defect classification table and repair recommendation

Week 8

Professional Practice, Communication, and Documentation & Jobsite Safety and Fall Protection & Asphalt Shingle Application and Fastening & Flashing, Valleys, and Penetration Detailing

  • Draft a homeowner-facing explanation of a needed repair that states the defect, the risk, and the recommended action without jargon

  • List the documentation to capture before, during, and after a job: photos, measurements, material labels, and signed change orders

  • Complete two timed practice sets weighted to Domains 3 and 4 and review every missed item to its source rule

  • Rehearse the fall-protection and fastening rules one final time, since they carry the highest point density per topic

Your checkpoint

A full-length timed practice exam scored, with a written error log of every missed question and the rule it tested

Milestones

Week 2: Can state the nail placement zone and starter-course sequence from memory and score at least 85% on the week 1-2 self-quiz

Week 4: Flashing detail sheet is complete and correctly ordered for all four details, and the takeoff worksheet totals match a verified answer key

Week 6: Compliance checklist is finished with conflicts flagged, and practice-set scores in Domains 3 and 4 exceed 80%

Week 8: Full timed practice exam passed at or above the target score, with the error log showing no repeated mistakes in Domains 3 and 4