NRCA EPDM study materials
NRCA EPDM study resources

NRCA EPDM study plan

NRCA EPDM · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

EPDM roof system installation knowledge and performance

  • Map the full EPDM roof assembly from deck through membrane, listing each component and its function in your own notes

  • Define the performance properties of EPDM (elastomeric thermoset, ozone and UV resistance, low-temperature flexibility, elongation, service temperature range) and state why each matters on a roof

  • Identify the common EPDM membrane thicknesses, sheet widths, and reinforced versus non-reinforced product types and where each is used

  • Explain how EPDM's thermoset chemistry differs from thermoplastic single-ply membranes and what that means for seaming and repair

Your checkpoint

A one-page labeled assembly diagram plus a 15-term glossary written from memory, checked against references

Week 2

EPDM roof system installation knowledge and performance

  • Compare ballasted, mechanically attached, and adhered attachment methods, listing load path, substrate requirements, and typical use cases for each

  • Describe the role of insulation, cover boards, and vapor retarders in the assembly and how they interact with the attachment method

  • Sequence the installation steps for a mechanically attached EPDM roof from substrate prep to final inspection

  • Explain fastening density, seam plate placement, and membrane relaxation requirements and the failures caused by getting them wrong

Your checkpoint

A written side-by-side comparison table of the three attachment methods with at least five criteria per method

Week 3

EPDM roof system installation knowledge and performance

  • Detail the splice and seam process: surface cleaning, primer application, tape or adhesive selection, roller pressure, and cure time

  • Distinguish splice adhesive, pressure-sensitive tape, and coverstrip methods and state where each is appropriate

  • List the field conditions (temperature, moisture, cleanliness) that degrade seam quality and describe how to test for them before starting

  • Describe destructive and non-destructive seam testing and the acceptance criteria for a completed seam

Your checkpoint

A step-by-step seam procedure checklist with pass/fail criteria you can use as a self-quiz

Week 4

EPDM roof system installation knowledge and performance

  • Identify flashing requirements for walls, curbs, drains, scuppers, penetrations, and inside/outside corners

  • Explain termination methods including batten bars, termination bars, counterflashing, and reglet and when each applies

  • Describe perimeter edge metal, drip edge, and how membrane is secured and terminated at roof edges

  • Diagnose five common flashing defects from written descriptions and state the correct repair approach for each

Your checkpoint

A flashing detail sketch set covering at least six conditions, each annotated with the termination method used

Week 5

EPDM roof system installation knowledge and performance

  • Explain roof drainage design fundamentals: slope, tapered insulation, crickets, saddles, and ponding prevention

  • Describe drain, scupper, and overflow installation details and the membrane-to-drain clamping sequence

  • Outline walkway pad, paver, and protection requirements in high-traffic and maintenance areas

  • Summarize the effect of ponding water and poor drainage on membrane performance and warranty coverage

Your checkpoint

A 20-question self-test on drainage and details, scored with a written list of every missed concept

Week 6

EPDM roof system installation knowledge and performance

  • List the inspection hold points in an EPDM installation and what must be verified at each one

  • Describe common failure modes (seam separation, punctures, shrinkage, blistering, flashing pull-out) and their root causes

  • Explain repair methods for each failure mode, including patch sizing, seam preparation, and adhesive selection

  • State the safety and jobsite requirements relevant to EPDM work, including adhesive handling, ventilation, and hot work avoidance

Your checkpoint

A failure-mode-to-repair matrix covering at least eight failure modes with cause and repair method for each

Week 7

EPDM roof system installation knowledge and performance

  • Review manufacturer installation specifications and warranty terms and note the requirements most often violated on site

  • Explain how substrate moisture, deck type, and climate affect membrane selection and installation scheduling

  • Work through five scenario problems that combine attachment, flashing, and drainage decisions into one correct assembly

  • Rehearse explaining an installation sequence aloud in under five minutes without notes

Your checkpoint

Five written scenario solutions with your reasoning for each decision, plus a timed verbal run-through

Week 8

EPDM roof system installation knowledge and performance

  • Re-take all prior self-tests and score at least 85 percent on each

  • Review every missed item from weeks 1 through 7 and write a corrected one-sentence rule for each

  • Complete two full-length timed practice sets under exam conditions

  • Consolidate the highest-risk topics into a single one-page review sheet

Your checkpoint

A final one-page review sheet plus a score log showing improvement across all practice sets

Milestones

Week 2: Can name all three attachment methods and state two substrate requirements and one common failure for each without notes

Week 4: Can sketch wall, curb, drain, and corner flashing details from memory and label every termination component

Week 6: Scores at least 80 percent on the drainage and failure-mode self-tests and can explain seam testing pass/fail criteria aloud

Week 8: Scores at least 85 percent on every re-taken self-test and completes both timed practice sets within the time limit