Roofing Foreman · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Roof system installation knowledge and performance

  • Map the full domain outline into a one-page checklist of roof system installation topics (steep-slope, low-slope, waterproofing, flashing, ventilation, insulation) and rate your confidence 1-5 on each

  • Define the load path and performance requirements of each roof component: deck, underlayment, ice/water barrier, field shingles or membrane, flashing, edge metal, ridge vent

  • Explain how slope determines material selection and which systems are permitted below 2:12, 2:12-4:12, and above 4:12

  • List the manufacturer and code fastening requirements (nail type, length, placement, penetration, pattern) for at least three common steep-slope products

  • Build a personal glossary of 40 installation terms you must recognize on exam day

Your checkpoint

A completed one-page domain checklist with confidence ratings and a 40-term glossary

Week 2

Roof system installation knowledge and performance

  • Describe correct installation sequence for a steep-slope shingle roof from deck prep through ridge cap

  • Identify underlayment types and where each is required versus optional by slope and climate

  • Explain ice dam formation and the correct placement and overlap of ice/water shield at eaves, valleys, and penetrations

  • Detail valley flashing methods (open, closed, woven) and when each is acceptable

  • Summarize ventilation requirements: intake-to-exhaust balance, net free area calculations, and common installation errors

Your checkpoint

A written step-by-step installation sequence for one steep-slope roof, including ventilation math worked out

Week 3

Roof system installation knowledge and performance

  • Compare low-slope membrane systems (TPO, EPDM, modified bitumen, built-up) on seaming method, substrate, and typical detailing

  • Explain roof drain, scupper, and overflow installation requirements and the consequences of each being wrong

  • Describe tapered insulation layout, crickets, and saddle construction for positive drainage

  • Identify flashing details at curbs, penetrations, walls, and expansion joints for single-ply and mod-bit systems

  • List common warranty-voiding installation errors across low-slope systems

Your checkpoint

A comparison table of four low-slope systems plus five hand-sketched flashing details labeled with correct materials

Week 4

Roof system installation knowledge and performance

  • Diagnose ten short installation scenarios and state the correct method and the reason

  • Calculate material quantities including waste factor for at least two roof types

  • Explain how substrate condition, moisture, and temperature affect adhesion and fastener performance

  • Recite the inspection checkpoints a foreman must verify before, during, and after each phase of a roof installation

Your checkpoint

A scored 20-question self-test with written explanations for every wrong answer

Week 5

Roof system installation knowledge and performance

  • Detail metal roof installation: panel types, clip spacing, thermal movement, and fastener placement

  • Explain waterproofing integration at wall transitions, parapets, and roof-to-deck junctions

  • Describe how insulation R-value, thermal bridging, and condensation control interact in roof assemblies

  • Match common failure symptoms (blistering, ridging, ponding, fastener back-out) to their installation causes

Your checkpoint

A failure-to-cause diagnostic chart covering at least ten symptoms with the installation error behind each

Week 6

Roof system installation knowledge and performance

  • Walk a real or remembered jobsite and list every installation detail you would inspect as foreman

  • Write the correct sequence and crew division of labor for a two-day residential tear-off and re-roof

  • Explain how to verify a subcontractor's work meets manufacturer installation requirements before close-in

  • Identify safety and fall-protection requirements that intersect with correct installation sequencing

Your checkpoint

A foreman's pre-close-in inspection checklist with at least 25 specific, verifiable line items

Week 7

Roof system installation knowledge and performance

  • Re-review your lowest-confidence items from weeks 1-6 and restate each rule in your own words

  • Practice explaining five installation details aloud as if instructing a crew member, then check for accuracy

  • Work through timed practice sets emphasizing calculation, sequencing, and detail-selection questions

  • Resolve every remaining term in your glossary you cannot define without notes

Your checkpoint

A rewritten one-page checklist with all items now rated 4 or 5, plus a log of remaining weak spots

Week 8

Roof system installation knowledge and performance

  • Take two full timed practice exams under test conditions and record section-level scores

  • Review every missed question and trace it to a specific installation rule you can now state

  • Do a final pass on fastening, flashing, ventilation, and drainage, the highest-frequency detail areas

  • Confirm logistics: test format, allowed references, timing strategy, and question-flagging plan

Your checkpoint

Two completed timed practice exams with a written error analysis and a final one-page review sheet

Milestones

Week 2: Can state the correct installation sequence and underlayment requirements for a steep-slope roof without notes

Week 4: Scores at least 75% on the 20-question self-test and can explain every missed item

Week 6: Produces a 25-item pre-close-in inspection checklist covering flashing, fastening, ventilation, and drainage

Week 8: Scores at least 85% on both timed practice exams with no repeated error category