NSPS CST Level II · Get comfortable with the vocabulary.

Benchmark

A permanent or semi-permanent marked point with known coordinates and elevation that survey work is referenced to. Level II field staff verify its published values before occupying it and record its identity in field notes.

Related: Control Network, Traverse
Traverse

A series of connected survey lines whose lengths and directions are measured from point to point. Field crews close or connect traverses to known control so that misclosure can be computed and adjusted.

Related: Misclosure, Control Network
Misclosure

The gap between a computed position and a known position at the end of a traverse or level loop. It is compared against an allowable tolerance before any adjustment is accepted.

Related: Traverse, Loop Closure
Loop Closure

The process of returning a leveling or traverse run to its starting point and comparing the measured result with the starting value. Closure error indicates the quality of the field work.

Related: Misclosure, Differential Leveling
Differential Leveling

A method of determining elevation differences by taking backsight and foresight readings on a level instrument. Each setup requires balancing sight distances to limit refraction and curvature error.

Related: Backsight, Foresight, Turning Point
Backsight

A rod reading taken on a point of known or established elevation after the instrument is set up. It establishes the height of instrument for subsequent foresight readings at that setup.

Related: Foresight, Height of Instrument
Foresight

A rod reading taken on a point whose elevation is being determined. A foresight on a temporary point that will be used for the next setup is also called a turning point reading.

Related: Backsight, Turning Point
Turning Point

A stable, well-defined point that carries elevation from one instrument setup to the next. It must be solid enough that the rod does not settle or shift between the foresight and the following backsight.

Related: Foresight, Differential Leveling
Height of Instrument

The elevation of the instrument line of sight, computed by adding a backsight reading to the known elevation of the reference point. All foresights at that setup are subtracted from this value.

Related: Backsight, Foresight
Total Station

An electronic instrument combining an angle-measuring theodolite with an electronic distance meter and onboard data storage. Field staff level it, set it over a known point, and record horizontal and vertical angles with slope distances.

Related: Prism Constant, Occupied Point
Occupied Point

The station where the instrument is centered and leveled, whose coordinates or elevation are known or assumed. Setting up on the wrong point is a common and costly field blunder.

Related: Total Station, Backsight
Prism Constant

A correction applied to electronic distance measurements to account for the offset between the prism and the point it represents. Using the wrong constant shifts every measured distance by that amount.

Related: Total Station, Traverse
Rod Bubble

The circular level on a leveling rod that indicates the rod is plumb. A rod held off vertical produces readings that are too large and bias computed elevations.

Related: Differential Leveling, Turning Point
Global Positioning System

A satellite-based positioning system used to establish coordinates in the field. Level II work commonly uses it for control reconnaissance and mapping-grade data collection rather than precise vertical control.

Related: Control Network, Benchmark
Control Network

A set of interconnected points with known positions that all survey work ties into. Field crews check network values before extending them, because an error in control propagates into every dependent measurement.

Related: Benchmark, Traverse
Right-of-Way

The corridor of land a utility or road is legally entitled to occupy. Field work on rights-of-way often requires locating existing monuments and documenting encroachments before construction begins.

Related: Monument, As-Built
Monument

A physical marker such as a pipe, pin, or chiseled mark that identifies a boundary corner or control point. Its type, condition, and ties to nearby features are recorded in field notes.

Related: Right-of-Way, Benchmark
Field Notes

The original written or electronic record of measurements, conditions, and decisions made in the field. They must be legible, complete, and contemporaneous, because they may later support design changes or legal disputes.

Related: As-Built, Monument
As-Built

A drawing or record showing the actual installed location and dimensions of constructed facilities. Field crews collect the measurements that let office staff compare what was built against the design.

Related: Field Notes, Right-of-Way
Utility Locate

The process of identifying and marking buried facilities before excavation. Field staff confirm markings, record depths and offsets, and document any conflicts with planned work.

Related: Right-of-Way, Field Notes
Tailgate Safety Meeting

A short, job-specific briefing held at the work site before tasks begin. It covers hazards, required protective equipment, emergency procedures, and the day's assignments for the crew.

Related: Excavation Safety
Excavation Safety

The practices that protect workers near open trenches, including protective systems, spoil placement, access, and atmospheric checks. Field staff must stay clear of unshored trenches and know the spotter's signals.

Related: Tailgate Safety Meeting, Utility Locate
Chain of Custody

A documented record tracking a sample or document from collection through analysis and storage. Gaps or unsigned transfers can make the evidence unusable in a regulatory or legal proceeding.

Related: Field Notes
Plan Sheet

A scaled drawing showing the horizontal layout, dimensions, and notes for a project. Field staff read plan sheets to locate structures, offsets, and limits of work before setting stakes.

Related: Profile Sheet, Plan and Profile
Profile Sheet

A drawing that shows existing and proposed elevations along an alignment, usually with vertical exaggeration. It is used to compute cut and fill and to set grade stakes in the field.

Related: Plan Sheet, Plan and Profile, Cut and Fill
Plan and Profile

A combined set of drawings presenting plan view and elevation view of the same alignment. Reading them together lets staff relate horizontal stationing to vertical grade at any point.

Related: Plan Sheet, Profile Sheet, Stationing
Stationing

A numbering system that locates points along an alignment by distance from a starting point, typically in 100-foot stations. Station equations account for changes in the baseline length.

Related: Plan and Profile, Offset
Offset

The perpendicular distance from a baseline or centerline to a feature. Offsets are recorded with a direction (left or right) so a point can be reestablished from the alignment.

Related: Stationing, Plan Sheet
Cut and Fill

The earthwork volumes removed from or added to a site to reach design grade. Quantities are computed from cross sections and used to balance earthmoving and price the work.

Related: Profile Sheet, Cross Section
Cross Section

A drawing showing the ground surface and design template across an alignment at a given station. Successive cross sections are used to compute earthwork areas and volumes.

Related: Cut and Fill, Profile Sheet
Specifications

The written requirements for materials, workmanship, and testing that accompany the drawings. When drawings and specifications conflict, the contract documents state which governs.

Related: Plan Sheet, Submittal
Submittal

A document such as a product data sheet, shop drawing, or sample sent for review and approval before installation. The review log tracks status so work is not installed on unapproved materials.

Related: Specifications, Request for Information
Request for Information

A formal written question sent to the designer when documents are unclear, conflicting, or missing information. The numbered response becomes part of the project record and may change the work.

Related: Submittal, Change Order
Change Order

A written modification to the contract that adjusts scope, price, or schedule. It must be executed through the proper approval process before the affected work proceeds.

Related: Request for Information, Punch List
Punch List

A compiled list of incomplete or deficient work identified during a walkthrough near substantial completion. Items are tracked to closeout and verified before final payment.

Related: Change Order, As-Built
Quantity Takeoff

The process of measuring and listing materials and work items from the drawings for pricing or planning. Accurate takeoffs depend on correct scale, units, and reading of notes.

Related: Plan Sheet, Cut and Fill
Scale

The ratio between a distance on a drawing and the corresponding distance in the field. Checking the stated scale against a known dimension catches reproduction or plotting errors.

Related: Plan Sheet, Offset
Contour Line

A line on a drawing connecting points of equal elevation. Its spacing indicates slope steepness, and its shape reveals ridges, valleys, and drainage patterns.

Related: Profile Sheet, Cross Section
Record Drawing

A drawing revised to reflect the actual constructed conditions, often marked up in the field and redrawn in the office. It supports future maintenance and regulatory closeout.

Related: As-Built, Punch List
Permit

An official authorization required before certain work may proceed, often with conditions on erosion control, traffic, or inspections. Office staff track expiration dates and inspection milestones.

Related: Specifications, Submittal