NV HVAC Contractor study plan
NV HVAC Contractor · Give each week a clear focus.
8 weeks · About 7 hours per week
Heating and cooling load calculation, duct design, and air distribution & HVAC systems and equipment
Perform a complete manual-style heating and cooling load estimate for a 2,000 sq ft single-family house, documenting orientation, glazing, insulation, and internal gains
Calculate sensible and latent loads separately for three representative rooms and explain why the split matters for equipment selection
Select equipment capacity from your calculated loads and justify the margin you applied against oversizing
Sketch a trunk-and-branch duct layout for the same house and label supply, return, and transfer air paths
Your checkpoint
A 6-10 page load and duct layout packet with calculation worksheets, equipment selection rationale, and a labeled duct sketch
Heating and cooling load calculation, duct design, and air distribution & HVAC systems and equipment
Size supply and return ducts using friction-rate and velocity methods, then compare the two results
Compute external static pressure for a full air-handler setup including filter, coil, heat strips, and grilles
Diagnose three air distribution faults (high static, short cycling, uneven room temperatures) and write the corrective action for each
Explain zoning, balancing dampers, and bypass strategy for a two-zone residential system
Your checkpoint
A duct sizing and static pressure worksheet for one system, plus a one-page troubleshooting table covering five distribution faults
Refrigeration cycle, refrigerants, and environmental regulations & HVAC systems and equipment
Trace the vapor-compression cycle on a pressure-enthalpy diagram and label superheat, subcooling, and compression ratio for a 410A system
Calculate superheat and subcooling from gauge and thermometer readings and state what each value indicates about charge and metering
Compare R-410A, R-32, R-454B, and R-22 on GWP, glide, and retrofit implications
Summarize the refrigerant management rules that apply to recovery, recycling, evacuation, and recordkeeping for technicians
Your checkpoint
A pressure-enthalpy worksheet with two worked charge-diagnosis examples and a refrigerant comparison table with regulatory notes
Electrical and controls for HVAC equipment & Refrigeration cycle, refrigerants, and environmental regulations
Read a residential HVAC wiring diagram and identify line, control, and safety circuits for a condensing unit and air handler
Size branch circuit conductors, overcurrent protection, and disconnect for a given nameplate MCA and MOP
Wire and explain a basic heat pump control sequence including defrost, auxiliary heat, and emergency heat lockout
List the electrical code checks an inspector would make on an HVAC rough-in
Your checkpoint
A wiring diagram redrawn from memory with conductor and overcurrent sizing calculations shown, plus a rough-in inspection checklist
Nevada contractor licensing law and Board regulations (NRS 624) & Business, contracts, safety, and project management
Outline the Nevada contractor licensing process: classification, qualifying party, application, and examination requirements
Describe the disciplinary and complaint process and the consequences of unlicensed contracting in Nevada
Identify the contract terms Nevada requires or restricts, including change orders, payment, and notice provisions
Explain lien rights, prompt payment, and the notice-to-owner requirements that affect an HVAC contractor's cash flow
Your checkpoint
A two-page Nevada compliance summary covering licensing, contracts, liens, and discipline, with citations to the relevant statute or regulation sections
Installation, testing, and commissioning & Electrical and controls for HVAC equipment
Write a startup and commissioning sequence for a new split system from rough-in through homeowner demonstration
Specify the tests to perform at each stage: pressure test, evacuation and decay test, airflow verification, and refrigerant charge check
Build a controls checkout list covering thermostat configuration, staging, safeties, and economizer or ventilation operation if present
Draft a commissioning report template with pass/fail criteria and sign-off lines
Your checkpoint
A complete commissioning checklist and report template covering at least 25 verifiable test items
Business, contracts, safety, and project management & Nevada contractor licensing law and Board regulations (NRS 624)
Estimate labor and material costs for a residential replacement job and build a bid with overhead and profit
Identify the safety hazards on an HVAC job site and state the control for each, including refrigerant, electrical, and fall hazards
Describe project scheduling and coordination steps for a retrofit that requires a permit and inspection
Explain how Nevada licensing rules affect subcontracting and hiring on a project
Your checkpoint
A sample bid package with cost breakdown, safety plan, and permit and inspection schedule for one project
Nevada contractor licensing law and Board regulations (NRS 624) & HVAC systems and equipment & Heating and cooling load calculation, duct design, and air distribution & Refrigeration cycle, refrigerants, and environmental regulations & Electrical and controls for HVAC equipment & Installation, testing, and commissioning & Business, contracts, safety, and project management
Take two full-length timed practice exams and log every missed question by domain
Re-study the two weakest domains using your own notes and worksheets from earlier weeks
Recite from memory the key formulas for load, airflow, superheat, subcooling, and conductor sizing
Review Nevada licensing rules and refrigerant regulations one final time
Your checkpoint
An error log with at least 40 missed items categorized by domain, plus a one-page formula and rules sheet written from memory
Milestones
Week 2: Complete the load and duct packet without reference material and score at least 80% on a self-made 20-question quiz on load and airflow fundamentals
Week 4: Explain the refrigeration cycle and a heat pump control sequence aloud in under 10 minutes each, and correctly size a branch circuit from nameplate data
Week 6: Pass a self-graded commissioning walkthrough: every checklist item has a pass/fail criterion and you can state the acceptance threshold for each
Week 8: Score at least 75% on both timed practice exams and show improvement over the week 8 first attempt in the two weakest domains