NWCG FFT1/FFT2 study materials
NWCG FFT1/FFT2 study resources

NWCG FFT1/FFT2 study plan

NWCG FFT1/FFT2 · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Fireline Safety and Risk Management (LCES, Watch Out Situations, Entrapment Avoidance, Fire Shelter Deployment)

  • Define LCES in your own words and write the four components plus a one-sentence trigger for each that would make you stop and re-evaluate

  • List all 18 Watch Out Situations from memory, then check your list and mark the five you personally find easiest to miss

  • Build a one-page entrapment-avoidance decision card covering escape routes, safety zones, and the point where you refuse an assignment

  • Walk a local area and identify two terrain features that would and would not serve as a safety zone, writing the reason for each

Your checkpoint

A one-page LCES and entrapment-avoidance reference card, handwritten, that you can reproduce from memory in under five minutes

Week 2

Fireline Safety and Risk Management (LCES, Watch Out Situations, Entrapment Avoidance, Fire Shelter Deployment) & Fire Behavior and Fuels (Fuel Models, Fire Triangle, Extreme Fire Behavior Indicators, Weather Effects)

  • Describe the fire shelter deployment sequence step by step, including what to do with tools, pack, and face protection, and where the shelter sits relative to the body

  • Explain the fire triangle and the fire behavior triangle, and name which leg you can actually influence on a fireline

  • Compare the extreme fire behavior indicators (crown fire, spotting, plume-dominated column, wind shift) and state what each means for your position

  • Match the 13 fuel models to their typical fuel type and expected flame length range, and note which two you are most likely to encounter locally

  • Read a basic fire weather forecast and identify red flag criteria, RH thresholds, and wind shift signals

Your checkpoint

A written fire-shelter deployment checklist plus a fuel-model quick-reference table covering all 13 models

Week 3

Fireline Construction and Tactics (Handline, Dozer Line, Mop-up, Holding, Anchor Point, Spot Fires)

  • Explain why an anchor point is required before constructing line and describe three acceptable anchor points

  • Distinguish handline, dozer line, and wet line by when each is appropriate, and state the production rate assumption you would use for planning

  • Sequence a mop-up operation: what the standard is, how far in you go, and what indicators tell you the line will hold

  • Describe how to detect and respond to a spot fire, including who you notify and in what order

  • Identify holding resources, their placement, and the conditions under which you would call for them

Your checkpoint

A written tactical scenario: given a slope, fuel model, and wind, lay out anchor point, line location, holding plan, and mop-up standard in 300 words

Week 4

Use of Hand Tools, Power Saws, Pumps, and Water Handling Equipment & Communications, Radio Use, and Situational Awareness Reporting

  • Name the common hand tools, their intended use, and the safety rule for each (Pulaski, McLeod, shovel, rhino, combi)

  • Describe power saw safety requirements: PPE, kickback awareness, bind, and the cutting sequence for a limb-lock situation

  • Explain pump setup basics: water source, hose lay, friction loss, and nozzle selection for the task

  • State the elements of a complete radio report: identification, location, what you have, what you need

  • Write and deliver a size-up or situation report using the standard order and keep it under 30 seconds

Your checkpoint

A recorded 30-second practice radio report plus a one-page tool and pump safety summary

Week 5

Incident Command System, Chain of Command, and Span of Control & Fitness, Work/Rest, Hydration, and Fatigue Management

  • Draw the ICS chain of command from a firefighter up through division, branch, and incident commander, and state what each level owns

  • Calculate span of control for a given crew count and identify when a division is overloaded

  • Explain the difference between unity of command and chain of command using a fireline example

  • Build a personal work/rest schedule for a 14-day assignment that respects the 2:1 work-to-rest guideline

  • List hydration and heat-illness warning signs and the action you take for each

Your checkpoint

A hand-drawn ICS org chart for a sample incident plus a written 14-day work/rest and hydration plan

Week 6

Wildland-Urban Interface and Structure Defense Awareness (for FFT1) & Aviation and Heavy Equipment Support Awareness (Safe Approach, Hand Signals, Spotter Duties)

  • Explain the difference between structure defense and wildland suppression, and state when a structure is defensible versus not

  • Identify the triage categories for structures and the information you report to the structure protection group

  • Describe safe approach to helicopters and dozers: approach angles, rotor clearance, and eye contact with the pilot or operator

  • Recall the standard hand signals used with heavy equipment and aviation, and state what to do when a signal is unclear

  • Explain spotter duties for aviation: what you watch, what you report, and when you call abort

Your checkpoint

A written structure triage walkthrough for one hypothetical neighborhood plus a hand-signal flashcard set of at least 10 signals

Week 7

Documentation, Task Book Administration, and Position Performance Evaluation & Fireline Safety and Risk Management (LCES, Watch Out Situations, Entrapment Avoidance, Fire Shelter Deployment)

  • Walk through the task book process: who signs, what qualifies as a completed task, and how to document a position performance evaluation

  • Write three example task book entries that would pass review, each tied to a specific observed behavior

  • Re-audit your LCES card and Watch Out Situations list for gaps you found during weeks 1 through 6

  • Identify the documentation you must complete after an assignment: shift tickets, safety reports, and equipment records

Your checkpoint

A completed sample task book page with three defensible entries plus a post-assignment documentation checklist

Week 8

Fireline Safety and Risk Management (LCES, Watch Out Situations, Entrapment Avoidance, Fire Shelter Deployment) & Fireline Construction and Tactics (Handline, Dozer Line, Mop-up, Holding, Anchor Point, Spot Fires) & Incident Command System, Chain of Command, and Span of Control

  • Run a full timed self-test across all ten domains and score it by domain

  • Re-teach the three domains you scored lowest on by writing a one-page summary of each from memory

  • Rehearse two scenario prompts out loud, narrating LCES, tactics, and command decisions as you would on a fireline

  • Confirm your task book is current and identify any remaining sign-offs you still need

Your checkpoint

A scored practice test with a written remediation plan naming your three weakest areas and the specific action for each

Milestones

Week 2: Can reproduce the 18 Watch Out Situations and the shelter deployment sequence from memory without notes

Week 4: Can lay out a complete line construction plan and deliver a 30-second radio report cleanly

Week 6: Can explain structure triage and demonstrate at least 10 heavy-equipment or aviation hand signals

Week 8: Scores at least 80 percent overall on the timed self-test with no domain below 70 percent, and has a written remediation plan for any gap