NWFA CI flashcards
NWFA CI · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Hygroscopic definition
- A material that absorbs and releases moisture from the surrounding air. Wood flooring is hygroscopic, so it expands in humid conditions and shrinks in dry conditions, causing seasonal movement.
- Equilibrium moisture content (EMC)
- The moisture content at which wood neither gains nor loses moisture to surrounding air at a given temperature and relative humidity. Interior EMC typically ranges from 6% to 11% across seasons.
- Cupping vs crowning
- Cupping: edges higher than center, typically from moisture gain on the top face. Crowning: center higher than edges, often from moisture gain on the bottom or from sanding a cupped floor flat.
- Normal seasonal movement
- Expected expansion and contraction of wood flooring as indoor humidity changes. Winter gapping that closes in summer is normal, not a manufacturing defect or installation error.
- Acceptable moisture content differential
- Flooring MC should be within 2-4 percentage points of the job-site EMC at installation. Larger differences increase risk of gapping (too dry) or buckling (too wet).
- Subfloor flatness tolerance
- Wood flooring typically requires subfloor flatness within 3/16 inch in 10 feet, or 1/8 inch in 6 feet. Verify with a 10-foot straightedge and record high and low spots.
- Calcium chloride test
- ASTM F1869 moisture test for concrete. Measures moisture vapor emission rate in pounds per 1,000 square feet per 24 hours. Compare results to the flooring manufacturer's stated limit.
- In-situ RH probe test
- ASTM F2170 test that measures relative humidity inside a concrete slab using embedded probes. Results are expressed as percent RH and compared to manufacturer limits, often 75-80%.
- Acclimation purpose
- Acclimation brings flooring MC into balance with the job-site EMC before installation, reducing post-installation movement, gapping, cupping, and buckling complaints.
- Buckling cause
- Buckling (floor lifting from the subfloor) usually results from moisture gain, inadequate expansion space at perimeter walls, or a tight installation with no room for movement.
- Perimeter expansion space
- A gap left between flooring and walls or fixed objects to allow seasonal expansion. Missing or inadequate expansion space is a common cause of buckling and squeaks.
- Crush marks at edges
- Compression damage on board edges caused by excessive swelling against tight joints or obstructions. Indicates moisture gain plus inadequate expansion allowance, not a manufacturing defect.
- Mill defect vs installation defect
- Mill defects (machining, finish, grading) exist before installation. Installation defects (flatness, fasteners, expansion, moisture) appear after. Inspection timing and pattern help separate them.
- NOFMA grading rules
- Industry grading rules that classify unfinished hardwood strip and plank by appearance characteristics such as knots, mineral streaks, and color variation. Grade is an appearance standard, not a structural one.
- Natural color variation
- Inherent differences in heartwood and sapwood color within a species. Variation is expected in natural-grade products and is not a valid defect complaint by itself.
- Finish checking vs cracking
- Checking is fine surface cracks in the wood or finish from rapid drying. Cracking usually follows board joints. Both are moisture-related and should be documented with MC readings.
- Gapping diagnosis steps
- 1) Measure flooring and subfloor MC. 2) Record indoor RH and temperature. 3) Check installation date and season. 4) Compare to EMC. 5) Determine whether gaps are seasonal or permanent.
- Squeak cause analysis
- Squeaks come from movement between boards, subfloor, or fasteners. Common causes are inadequate fastening, subfloor deflection, or seasonal shrinkage opening joints. Not a finish defect.
- Photographic documentation
- Inspectors must photograph conditions with scale references, date stamps, and orientation notes. Photos support findings and must be taken before any repair or sanding alters the evidence.
- Moisture meter calibration
- Verify meter accuracy with a known reference before each inspection. Record meter make, model, and calibration status in the report so findings can be independently verified.
- Species identification
- Identify species by grain, pore structure, and color. Species affects expected movement, hardness, and grading. Misidentification undermines moisture and defect conclusions.
- Inspector report components
- A report should include scope, date, parties, site conditions, measurements, photo log, findings, probable cause, applicable standard, and recommended corrective action, without assigning legal liability.
- Relative humidity recording
- Record indoor RH and temperature at the time of inspection. These values determine EMC and are essential for judging whether moisture-related conditions are expected or abnormal.
- Subfloor deflection
- Movement of the subfloor under load, often from undersized joists or spans. Deflection causes squeaks, joint movement, and finish cracking, and is not a flooring manufacturing defect.
- Fastener schedule compliance
- Verify nail or staple spacing, angle, and placement against the manufacturer's instructions. Improper fastening causes squeaks, edge lifting, and face-nailing complaints.
- Delamination vs finish wear
- Delamination is separation of finish layers from the wood, often from moisture or adhesion failure. Finish wear is abrasion from traffic. Each has a different cause and remedy.
- Acclimation documentation
- Records showing flooring was stored on site at proper temperature and humidity, with MC readings taken before installation. Missing records weaken any defense against moisture complaints.
- Inspection timing rule
- Inspect before any repair, sanding, or replacement. Altering the floor destroys evidence and can make cause determination impossible. Document conditions exactly as found.
- Concrete vapor emission limit
- Manufacturer limits for concrete moisture typically range from 3 to 5 pounds per 1,000 square feet per 24 hours (calcium chloride) or 75-80% RH (in-situ probe). Follow the specific product's instructions.
- Crawl space ventilation
- Adequate crawl space ventilation and a vapor barrier reduce moisture migration into the subfloor and flooring, preventing cupping and buckling. Poor ventilation is a common root cause.
- Grading vs quality
- Grade describes appearance characteristics allowed in a product. It does not measure installation quality or structural performance. Complaints about grade must be judged against the stated grade rules.
- Corrective action recommendation
- The inspector recommends a remedy such as humidity control, re-fastening, sanding, or replacement, based on the identified cause. Recommendations must be specific and tied to the finding.