New York Low Voltage Practice flashcards
New York Low Voltage Practice · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Class 2 circuit limits
- A circuit is Class 2 when its power source is limited to 30 volts and 100 volt-amperes for AC or DC, as defined in NEC Article 725.
- Communications cable separation
- NEC 800.133 requires at least 2 inches of separation between communications cables and power or Class 1 conductors unless a barrier or listed separation method is used.
- Horizontal cable support interval
- Exposed horizontal runs of communications cable must be supported at intervals not exceeding 4.5 feet, and within 12 inches of boxes.
- UTP bend radius
- Four-pair UTP copper cable is generally bent no tighter than four times its diameter during pulling and one time its diameter after installation.
- Article 725 scope
- NEC Article 725 governs Class 1, Class 2, and Class 3 remote-control, signaling, and power-limited circuits that are not part of a fire alarm or communications system.
- Article 760 scope
- NEC Article 760 covers fire alarm system wiring and equipment, dividing circuits into power-limited and non-power-limited categories with different wiring method rules.
- Plenum cable requirement
- NEC 300.22 requires plenum-rated cable such as CMP, CL3P, or FPLP in environmental air spaces unless the cable is installed in a metal raceway.
- Working space clearance
- NEC 110.26 requires at least 36 inches depth, 30 inches width, and 6.5 feet height of clear working space at electrical equipment requiring servicing while energized.
- New York licensing authority
- New York State does not issue a statewide electrician license; licensing and permitting are administered by municipalities and counties, so credentials do not transfer automatically.
- NYS Uniform Code adoption
- The New York State Uniform Fire Prevention and Building Code adopts the NEC by reference, and the edition in force is updated periodically, so verify the adopted edition.
- Third-party inspection
- Many New York jurisdictions require electrical inspections by approved third-party agencies rather than municipal inspectors, and the AHJ maintains the list of approved agencies.
- Concealed work inspection
- Concealed low voltage wiring must be inspected before it is covered; a final inspection and certificate of approval follow completion of the work.
- Intersystem bonding termination
- NEC 250.94 requires a listed intersystem bonding termination at the service equipment, accessible and able to connect at least six communications or low voltage conductors.
- Communications shield bonding
- NEC 800.100 requires the communications cable shield and metallic members to be bonded to the building grounding electrode system as close as practicable to the point of entry.
- CATV shield bonding
- NEC 820.100 requires coaxial cable shields for CATV and radio distribution to be bonded to the building grounding electrode system, not to a separate isolated ground rod.
- Isolated ground receptacle
- An isolated ground receptacle still requires an equipment grounding conductor run back to the panel; isolated ground does not mean the circuit is ungrounded.
- Fire alarm cable listings
- FPLR is listed for risers, FPLP for plenum air spaces, and FPL for general purpose use; the listing must match the installed environment.
- Class A versus Class B
- Class A fire alarm circuits provide a redundant path so a single open does not disable the circuit; Class B circuits lack redundancy and an open disables downstream devices.
- Supervised circuit trouble
- A single open or ground fault on a supervised fire alarm circuit must produce a trouble signal within 200 seconds under NFPA 72.
- Pathway survivability
- NFPA 72 survivability Level 2 requires 2-hour fire-rated cable or a 2-hour rated enclosure for fire alarm circuits in certain high-rise and occupancy applications.
- Cat 6A frequency rating
- ANSI/TIA-568 rates Cat 6A cable to 500 MHz, Cat 6 to 250 MHz, Cat 5e to 100 MHz, and Cat 8 to 2000 MHz at a 30-meter length.
- Horizontal cabling length
- Copper horizontal cabling is limited to 90 meters of permanent link plus 10 meters of patch cords, for a maximum channel length of 100 meters.
- Permanent link versus channel
- Permanent link testing excludes patch cords and covers the installed cabling; channel testing includes patch cords and measures end-to-end performance.
- Single-mode fiber core
- Single-mode fiber has a 9-micrometer core and is used for long-distance backbone runs; multimode fiber uses 50 or 62.5 micrometers for shorter in-building runs.
- Lockout tagout verification
- OSHA 29 CFR 1910.147 requires de-energizing, isolating, locking, tagging, and verifying absence of voltage with a tester rated for the voltage present.
- Arc flash boundary
- NFPA 70E defines the arc flash boundary as the distance at which incident energy equals 1.2 calories per square centimeter, requiring arc-rated PPE within it.
- Test before touch
- Verify the voltage tester on a known live source before and after testing, and treat all conductors as energized until absence of voltage is proven.
- Trench protective systems
- OSHA 29 CFR 1926 Subpart P requires protective systems such as shoring or sloping for excavations 5 feet or deeper, including low voltage cable trenches.
- Copper certification tests
- Certification testing measures insertion loss, return loss, near-end crosstalk, and far-end crosstalk against TIA-568 category limits and reports pass or fail with margin.
- Fiber loss testing
- An optical loss test set measures insertion loss and an OTDR locates faults and splices; bidirectional testing is required for accurate loss results.
- Commissioning sequence
- Verify power and grounding, perform point-to-point checkout, test each subsystem, integrate systems, and document results in a signed commissioning report.
- Fire alarm acceptance test
- NFPA 72 acceptance testing requires testing every initiating device, notification appliance, and supervisory function, and verifying signal transmission to the supervising station.