- Rule of monuments
- A rule of deed construction holding that natural or artificial monuments called for in a description control over courses, distances, and stated area when those elements are inconsistent.
- Race-notice recording
- A recording statute under which a later purchaser prevails only if that purchaser takes without notice of a prior unrecorded interest and records before that prior interest is recorded.
- Adverse possession
- Acquisition of title by open, notorious, hostile, and continuous possession for the statutory period; in California that is five years plus payment of all taxes levied during the period.
- Avulsion
- A sudden and perceptible change in a watercourse or shoreline; it does not move the boundary, which remains at the location of the former water line.
- Obliterated corner
- A corner whose physical monument is gone or destroyed but whose original position can still be recovered from accessories, testimony, or other evidence found in the field or record.
- Lost corner
- A corner whose original position cannot be recovered from any evidence and which must be reestablished by proportionate measurement between existing controlling corners.
- Double proportionate measurement
- A method of restoring a lost interior corner by proportioning in both the north-south and east-west directions between the controlling corners on the four surrounding section lines.
- Bearing tree
- A tree marked and recorded by the original surveyor to witness a corner; it is an accessory whose record can control the restored position of that corner.
- Section numbering
- Within a township, sections are numbered from 1 at the northeast corner serpentinely to 36 at the southeast corner, with sections one through six running westward.
- Standard parallel
- A correction line run east-west every 24 miles, or four townships, north of the base line to offset meridian convergence and re-establish township corners on a common line.
- Meander line
- A survey line run along the bank of a navigable water body to compute the area of the fractional parcel; it is not a boundary and does not limit riparian title.
- Quarter corner
- A corner established at the midpoint of a section line, normally 2,640 feet from each section corner on a regular section, and the basis for quarter-section subdivision.
- Chain of title
- The successive series of recorded conveyances linking the present owner back to the sovereign or earliest grantor of the parcel, used to verify title and description continuity.
- Lot line adjustment
- A local agency approval that relocates a boundary between four or fewer existing parcels without creating a new parcel and without filing a new subdivision map.
- Constructive notice
- Notice imputed by law from recording a document in the public records, binding all persons whether or not they actually examined the record.
- Parcel map
- A map filed under the Subdivision Map Act for the division of land into four or fewer parcels, distinguished from a final or tract map for larger divisions.
- Bowditch rule
- A traverse adjustment that distributes the closure error in proportion to each course length, applied separately to the latitude and departure components of the traverse.
- Angular closure
- The difference between the measured sum of the angles in a closed figure and the theoretical sum, computed for a polygon as (n minus 2) times 180 degrees.
- Combined factor
- The product of the map projection scale factor and the elevation factor, used to convert measured ground distances to grid distances and grid distances back to ground.
- Perpetuation of corners
- Monumenting and recording a corner so that later surveyors can relocate it, typically with a durable monument and ties to two or more permanent nearby features.
- Tentative map
- A preliminary subdivision map submitted to the local agency for review and approval before a final or parcel map is prepared, approved, and recorded.
- Certificate of compliance
- A document recorded by a local agency confirming that a parcel was lawfully created under the Subdivision Map Act at the time of its creation.
- Offer of dedication
- A grant or offer of an interest in land for public use shown on a subdivision map, which becomes effective only when the public agency accepts it.
- Quiet title action
- A court proceeding that determines competing claims to real property and establishes the boundary or title as a matter of record binding on the parties.
- Geoid separation
- The distance between the ellipsoid and the geoid at a point, denoted N, such that orthometric height equals ellipsoid height minus the geoid separation.
- Grid convergence
- The angle at a point between true north and grid north of a map projection, which varies with position within the zone and must be applied to convert azimuths.
- NAD83
- The North American Datum of 1983, a geocentric datum based on the GRS80 ellipsoid and the current horizontal reference for surveying in the United States.
- Scale factor
- The ratio of grid distance to ellipsoid distance on a map projection; it equals exactly 1.0 only along the standard parallels or the central meridian.
- Responsible charge
- The independent control and direction of surveying work by a licensed land surveyor who signs and seals the resulting maps, plats, and reports.
- Record of survey
- A map filed with the county recorder under Business and Professions Code section 8762 when specified conditions occur, such as new evidence or a newly established corner.
- Standard of care
- The degree of skill and care that a reasonably prudent surveyor of ordinary competence would exercise under similar circumstances in the same community.
- Conflict of interest
- A situation in which a surveyor's personal or financial interest could impair professional judgment; it must be disclosed and avoided or properly managed.