S+SNZ Geodetic Survey study materials
S+SNZ Geodetic Survey study resources

S+SNZ Geodetic Survey flashcards

S+SNZ Geodetic Survey · Build recall with a focused review session.

33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Cadastral survey
A survey that defines and marks parcel boundaries and records the rights and interests in land, producing a legally recognised plan or dataset.
Boundary reinstatement
The process of re-establishing an existing parcel boundary from evidence, prioritising undisturbed original marks over later measurements or occupation.
Survey mark
A durable physical monument placed to define a boundary corner or control point, whose position and stability support later surveys.
Misclose ratio
The ratio of total linear misclose to total traverse length, used to assess whether a boundary traverse meets the required accuracy standard.
Encumbrance
A right or interest held by another party over a parcel, such as an easement, that must be shown and surveyed on the plan.
PDOP
Position dilution of precision, a measure of satellite geometry quality; higher values indicate weaker geometry and poorer achievable position accuracy.
RTK accuracy
Real-time kinematic GNSS typically achieves horizontal accuracy of about 0.01 to 0.03 metres plus one part per million of baseline length.
Combined scale factor
The product of point scale factor and elevation factor, converting ground distance to grid distance on a projected coordinate system.
Traverse adjustment
A procedure distributing angular and linear misclose through a traverse, commonly by Bowditch or transit method, to produce adjusted coordinates.
Redundancy number
A measure of how many independent observations exceed the minimum needed, indicating the network's ability to detect blunders.
Helmert transformation
A seven-parameter transformation using three translations, three rotations, and a scale factor to convert coordinates between datums.
IHO S-44
The international standard setting minimum hydrographic survey accuracy and coverage requirements, graded by order of survey.
Chart datum
The reference level to which soundings are reduced, normally lowest astronomical tide, so charted depths are conservative for navigation.
Total propagated uncertainty
The combined uncertainty in a sounding from position, tide, sound velocity, and beam angle, assessed against the survey order limit.
Sound velocity profile
A measurement of sound speed through the water column, used to correct multibeam and echosounder data for refraction.
Swath overlap
The lateral overlap between adjacent multibeam swaths, typically ten to twenty percent, ensuring full coverage and object detection.
Setting out
The process of marking design positions on the ground to the specified tolerance, using control and measured offsets from known points.
As-built survey
A survey of constructed works compared against design, reporting deviations beyond tolerance to the engineer for action.
Horizontal curve length
The arc length of a circular curve, calculated as radius multiplied by the deflection angle expressed in radians.
Vertical curve length
The length of a parabolic vertical curve, calculated as the rate of grade change multiplied by the algebraic grade difference in percent.
Average end area
An earthwork volume method averaging the areas of two cross-sections and multiplying by the distance between them.
Deformation monitoring
Repeated precise measurement of fixed reference and target points to detect movement beyond a stated confidence interval.
Rational method
A stormwater runoff formula, Q equals CiA, used for small catchments to estimate peak flow from rainfall intensity and area.
Road hierarchy
The classification of roads into arterial, collector, and local, which sets design width, gradient, and intersection spacing.
Cut and fill balance
A design goal of matching earthwork excavation with fill volume on site to minimise cartage cost and environmental impact.
Servicing corridor
A reserved strip for water, wastewater, power, and telecommunications, with defined separation and cover requirements.
Subdivision consent
A statutory approval allowing land to be divided into new parcels, subject to district plan and servicing conditions.
EPSG code
A standard numeric identifier for a coordinate reference system, datum, or transformation, enabling unambiguous data exchange.
NZTM2000
The New Zealand Transverse Mercator projection on the NZGD2000 datum, identified by EPSG code 2193.
Topology rule
A constraint enforcing spatial integrity in a geodatabase, such as no overlaps, gaps, or dangling nodes between features.
Spatial overlay
A GIS operation combining two layers, such as intersect, union, or clip, to derive new features from their spatial relationship.
Metadata lineage
A record of a dataset's source, processing history, and accuracy, allowing users to judge its fitness for purpose.
Raster resolution
The ground size of each grid cell in a raster dataset, which sets the finest detail the data can represent.