S+SNZ Planning & Resource Management study materials
S+SNZ Planning & Resource Management study resources

S+SNZ Planning & Resource Management cheat sheet

S+SNZ Planning & Resource Management · Keep the key ideas within reach.

Quick reference

Statutory Framework for Planning and Resource Management

  • Resource Management Act 1991 (RMA) is the core statute: s5 purpose (sustainable management of natural and physical resources), s6 matters of national importance, s7 other matters, s8 Treaty of Waitangi.

  • Hierarchy of instruments: national policy statements and national environmental standards bind regional policy statements, which bind regional and district plans; consents must be assessed against all applicable levels.

  • s104 consent decision criteria: actual and potential effects, relevant plan and policy provisions, other matters; s104D restricts contrary-to-plan consenting for non-complying activities.

  • s87A–s87G activity classes: permitted, controlled, restricted discretionary, discretionary, non-complying, prohibited; each class defines the scope of council discretion.

  • s13, s14, s15 RMA control use of beds of lakes/rivers, water take/damming/diversion, and discharge of contaminants; these are core regional council functions.

  • Environment Court sits under s309 and hears appeals on plan and consent decisions de novo; appeals on consent must be lodged within 15 working days of notification of decision.

  • National Planning Standards 2019 prescribe structure, definitions and format for policy statements and plans; regional and district plans must conform.

  • Other relevant statutes include Local Government Act 2002 (consultation, long-term plans), Conservation Act 1987, Heritage New Zealand Pouhere Taonga Act 2014, and Reserves Act 1977.

Quick reference

Resource Consent Processes and Assessment

  • s88 application must include AEE, description of activity, site plan, affected persons, and assessment against plan objectives, policies and rules; incomplete applications may be returned under s88(3).

  • s95 notification test: public notification if effects more than minor or special circumstances; limited notification to affected persons with minor-or-greater effects; otherwise non-notified.

  • s95E affected person test: person has an interest in the proposal that is greater than the interest of the general public, and that interest may be adversely affected.

  • Assessment of Environmental Effects (AEE) under Schedule 4 must address effects on environment, affected persons, and mitigation measures; scale should be proportionate to significance.

  • Controlled activity: consent must be granted, but conditions may be imposed only on matters over which control is reserved in the plan.

  • Restricted discretionary: discretion limited to the matters specified in the plan rule; assessment must stay within those matters.

  • Non-complying under s104D: consent may only be granted if adverse effects are minor, or the activity is not contrary to objectives and policies.

  • s127 variation of conditions and s125 review of conditions allow adaptive management; s128 review can be initiated by council on specific grounds.

Quick reference

District and Regional Plan Preparation and Review

  • Schedule 1 RMA sets the plan-making process: pre-notification consultation, public notice, submissions, further submissions, hearings, decisions, and appeals.

  • Regional policy statements must be prepared by regional councils and reviewed every 10 years; district and regional plans have no fixed statutory review cycle but must be reviewed as required.

  • s32 evaluation must examine the effectiveness and efficiency of objectives, policies, rules and other methods, including alternatives and benefits/costs.

  • s32AA requires further evaluation of any changes made following submissions and hearings, recorded in the decision report.

  • s75 and s76 govern district plan content and rules; s30 and s67 govern regional council functions and regional plan content.

  • Plan changes can be initiated by council (s73) or by private request (s74); the same Schedule 1 process applies to both.

  • s85 Environment Court may direct a plan change if the plan is inconsistent with the RMA or a higher-order document.

  • National Planning Standards require standardised zone descriptions, definitions, and district plan structure.

Quick reference

Surveying and Spatial Information in Planning

  • New Zealand Geodetic Datum 2000 (NZGD2000) is the official geodetic datum; NZTM2000 is the standard projection for national mapping and property boundaries.

  • LINZ provides the cadastral survey dataset (CSD) and New Zealand Primary Parcel layer; survey plans are lodged with LINZ under the Cadastral Survey Act 2002.

  • Survey plans must be certified by a licensed cadastral surveyor under the Cadastral Survey Act 2002; accuracy standards are set in the Surveyor-General's rules.

  • GIS layers commonly used in planning include: parcel boundaries, hazard layers, heritage listings, zoning, and infrastructure networks; metadata quality and scale must be recorded.

  • Spatial accuracy and scale: 1:50,000 mapping is unsuitable for site-level assessment; use 1:1,000–1:5,000 for urban parcel work.

  • LiDAR and aerial imagery support flood, slope and vegetation mapping; always record capture date and accuracy statement in assessments.

  • Digital cadastral databases may have positional error; field survey is required where boundary location is material to a consent.

Quick reference

Land Use, Subdivision, and Development Controls

  • Subdivision is a controlled activity under s87AAC(2) if it meets standards; consent must be granted but conditions may address specified matters.

  • s220 RMA allows conditions on subdivision consent including esplanade reserves, amalgamation, and provision of infrastructure; s221 allows consent notices.

  • s224 completion certificate and s223 survey plan approval are required before the subdivision can be deposited; s226 allows bonding for works.

  • Development controls commonly include maximum height, yards/setbacks, site coverage, impermeable surface area, floor area ratio, and outdoor living space.

  • Esplanade reserves under s229–s237: 20 m standard width on subdivision of land adjoining the sea, lakes, and rivers over 3 m wide; reduced or increased widths possible.

  • Cross-lease and unit title subdivisions are governed by the Land Transfer Act 2017 and Unit Titles Act 2010, not just the RMA.

  • Financial contributions under s108 can be required for reserves, network infrastructure, or community facilities; must be in plan or policy statement.

Quick reference

Consultation, Engagement, and Tangata Whenua Matters

  • s81 RMA requires councils to take into account the principles of the Treaty of Waitangi; s6(e) recognises the relationship of Māori with ancestral lands, water, sites, wāhi tapu and other taonga.

  • s36A RMA allows joint management agreements and transfers of powers to iwi authorities; s33 allows transfer of functions to iwi.

  • s7(a) requires particular regard to kaitiakitanga; s7(aa) to the ethic of stewardship; s8 requires the principles of the Treaty to be taken into account.

  • Local Government Act 2002 s82 requires consultation principles: accessible, informed, encouraged participation, and feedback with reasons.

  • Consultation is not the same as negotiation; it requires genuine opportunity for input, but the decision-maker retains the decision.

  • Mana whenua engagement should begin early; identify iwi authorities and hapū through Te Puni Kōkiri or council records; document engagement outcomes.

  • Heritage New Zealand Pouhere Taonga Act 2014 requires an archaeological authority for any activity that may modify or destroy an archaeological site, regardless of RMA consent.

  • Wāhi tapu and silent files: councils hold sensitive information on sites; access is restricted and must be handled with care.

Quick reference

Environment, Heritage, and Natural Hazard Management

  • s6 RMA matters of national importance include preservation of natural character of coastal environment, wetlands, lakes and rivers, and protection of outstanding natural features and landscapes.

  • s6(c) protection of areas of significant indigenous vegetation and significant habitats of indigenous fauna; s6(f) protection of historic heritage.

  • s6(h) requires management of the coastal environment in accordance with the New Zealand Coastal Policy Statement 2010 (NZCPS).

  • Natural hazards under s6(h) and s7(i): councils must consider risk from flooding, erosion, earthquakes, volcanic activity, tsunamis, and climate change.

  • Heritage New Zealand Pouhere Taonga List and district plan heritage schedules are distinct; listing can trigger resource consent for demolition or alteration.

  • National Environmental Standards include NES for Freshwater 2020, NES for Air Quality, and NES for Contaminated Soil; these override plan rules where more stringent.

  • Hazard risk assessment should address likelihood, consequence, and residual risk; managed retreat and avoidance are preferred over hard protection in many coastal plans.

  • Significant Natural Areas (SNAs) identified in district plans are a common method for s6(c) protection; criteria include representativeness and rarity.

Quick reference

Professional Ethics, Standards, and Practice Management

  • Survey and spatial professionals in New Zealand are regulated by the Cadastral Survey Act 2002 and the Surveyor-General; professional bodies include Survey and Spatial NZ (S+SNZ).

  • Ethical obligations typically include: competence, honesty, confidentiality, conflict-of-interest disclosure, and duty to the public interest.

  • Conflict of interest: declare any financial or personal interest; recuse from decision-making where a fair-minded observer might perceive bias.

  • Record-keeping: keep project files, field notes, and calculations for at least 7 years (common professional standard) and in accordance with the Privacy Act 2020.

  • Health and Safety at Work Act 2015 requires PCBU duties; site surveys need hazard identification, PPE, and traffic management plans.

  • Continuing professional development (CPD) is expected by professional bodies; keep a log of learning activities and reflect on practice.

  • Quality assurance: peer review of plans, checking calculations, and documented methodology support defensible professional opinions.

  • Privacy Act 2020 governs personal information collected during surveys and consultation; apply the information privacy principles.