OH Journeyman Plumber study plan
OH Journeyman Plumber · Give each week a clear focus.
8 weeks · About 7 hours per week
Drainage, Waste, and Venting & Plumbing Systems and Fixtures
Map the DWV domain's 20 percent weight into a checklist of fixture-drain, trap, vent, and building-drain subtopics you will drill each week
Trace a full DWV path on paper from a water closet flange through the closet bend, branch, stack, and building drain to the sewer, naming each fitting and its purpose
Identify the vent types (individual, common, wet, circuit, stack, relief) and state in writing the condition each one protects against
List the trap-seal requirements you must memorize, including seal depth, trap-arm distance limits, and prohibited trap configurations
Complete 40 practice items on traps and venting and log every miss with the rule you violated
Your checkpoint
A one-page DWV cheat sheet plus a scored 40-item practice log showing at least 75 percent correct
Drainage, Waste, and Venting & Plumbing Systems and Fixtures
Calculate drain and vent pipe sizing for a worked example using fixture units and developed length, showing every step
Explain the difference between a wet vent and a dry vent and identify three field situations where each is used
Describe the correct installation sequence for a water closet, lavatory, and floor drain, including rough-in dimensions and flange height
Diagnose five written DWV failure scenarios (gurgling trap, sewer odor, slow drain, bubbling fixture, frozen vent) and prescribe the code-compliant fix for each
Recite the slope requirements for drain pipe by size and the cleanout spacing rules from memory in writing
Your checkpoint
A worked fixture-unit sizing problem with full calculations and a five-scenario diagnostic write-up
Plumbing Systems and Fixtures & Water Supply and Distribution
Catalog the common plumbing fixtures and their required flow rates, fixture-unit values, and minimum trap sizes in a comparison table
Describe the water supply distribution layout from meter through main, riser, and branch, including the function of each valve and device
Explain backflow prevention devices and identify which cross-connection situations require an air gap versus a vacuum breaker versus a reduced-pressure assembly
Compute the minimum required number of fixtures for a small commercial occupancy given occupant load and fixture ratios
Complete 40 practice items mixing fixtures and water supply and review every missed item against the code text
Your checkpoint
A fixture-and-flow-rate reference table plus a scored 40-item practice log with written corrections for each miss
Water Supply and Distribution & Pipe Materials and Fittings
Size a water supply system using demand loading and pressure-loss tables, showing the calculation for a two-bath dwelling
Compare copper, PEX, CPVC, and galvanized pipe on pressure rating, joining method, freeze behavior, and approved applications, and write a short selection rationale for each
Identify the fittings and joining methods for each pipe material and state the code restriction on mixing materials or using dielectric unions
Explain thermal expansion control, water hammer arrestors, and pressure-reducing valve placement in a distribution system
Complete 30 practice items on pipe materials and fittings and correct each miss in writing
Your checkpoint
A completed water supply sizing calculation for a two-bath dwelling plus a four-material comparison matrix
Plumbing Code and Regulations & Pipe Materials and Fittings
Outline the permit, inspection, and testing sequence for a residential plumbing rough-in and final, naming the inspection stage at which each test occurs
State the hydrostatic and air test pressure and duration requirements for DWV and water supply systems
List the code requirements that most often trigger failed inspections, including support spacing, protection of pipe, and prohibited fittings
Describe the licensing and code-adoption framework that governs journeyman plumbers in Ohio, including who adopts the code and what the journeyman is responsible for on site
Complete 40 practice items on code and regulations and log the code section behind each missed item
Your checkpoint
A rough-in-to-final inspection timeline with test pressures and durations, plus a scored 40-item code practice log
Plumbing Safety and Tool Use & Plumbing Math and Measurement
Demonstrate the safe setup and use of the core tools (press tool, tubing cutter, soil pipe cutter, auger, torch) and state the hazard each tool presents
Explain confined-space, trenching, and soldering-fire safety practices and the personal protective equipment required for each task
Compute pipe offsets, travel, and fitting takeoffs for 45-degree and 22.5-degree offsets and verify your answers with a second method
Convert between decimal inches, fractions, and metric units and calculate pipe volume, fixture-unit totals, and developed length from a sketch
Complete 25 mixed safety and math practice items and rework every missed calculation until correct
Your checkpoint
A tool-hazard and PPE reference sheet plus a set of five solved offset and takeoff calculations checked two ways
Plumbing System Design and Installation & Plumbing Systems and Fixtures
Design a complete plumbing layout for a two-bath single-family dwelling, showing fixture placement, DWV routing, vent connections, and water supply branches
Justify each sizing decision in the layout by citing the fixture-unit and demand-load basis you used
Identify the installation details that differ between a slab-on-grade, crawl space, and basement rough-in and adjust your design accordingly
Review your layout against a written self-audit checklist covering trap seals, venting, cleanouts, support, and access
Present the design in a short written narrative as if explaining it to an inspecting authority
Your checkpoint
A complete two-bath dwelling plumbing layout with sizing justifications and a completed self-audit checklist
Drainage, Waste, and Venting & Water Supply and Distribution & Plumbing Code and Regulations
Take two full-length timed practice exams under test conditions and record the score by domain
Rank your three weakest subtopics from the practice exams and drill 20 targeted items on each
Rewrite your DWV, water supply, and code cheat sheets from memory and compare against your originals to find gaps
Review every remaining flagged item from weeks 1 through 7 and resolve each one to a confident answer
Build a final one-page pre-exam review sheet limited to the facts you most often missed
Your checkpoint
Two scored timed practice exams with a domain breakdown and a final one-page pre-exam review sheet
Milestones
Week 2: Score at least 75 percent on a 25-item DWV quiz covering traps, vents, slope, and cleanouts, and correctly solve one fixture-unit sizing problem without notes
Week 4: Score at least 80 percent on a 30-item mixed quiz on fixtures, water supply, and pipe materials, and complete a two-bath water supply sizing calculation unaided
Week 6: Score at least 80 percent on a 25-item safety and math quiz, and solve three pipe offset problems correctly using two independent methods
Week 8: Score at least 80 percent overall on each of two timed full-length practice exams, with no single domain below 70 percent