OH Well Driller study materials
OH Well Driller study resources

OH Well Driller cheat sheet

OH Well Driller · Keep the key ideas within reach.

Quick reference

Well Driller Licensing Requirements and Eligibility

  • Ohio issues water well driller licenses through the Ohio Department of Natural Resources, Division of Water Resources; a license is required before constructing, deepening, or abandoning a well for another person.

  • Core license classes are water well drilling contractor (a business entity) and the individual drilling employee; work must be performed under a properly licensed contractor.

  • Eligibility generally turns on age (18+), a completed application with fee, and evidence of experience or training in well drilling accepted by the Division.

  • Examination covers Ohio well construction rules, grouting and sealing, disinfection, abandonment, and reporting; a passing score is required before licensure.

  • Licenses are renewed on a fixed cycle with continuing education hours; lapsed licenses may require reinstatement rather than simple renewal.

  • Contractor licenses attach to the business entity and are not transferable; a change of business name or ownership requires notifying the Division.

  • Unlicensed drilling is subject to enforcement, including stop-work orders, civil penalties, and denial or revocation of licensure.

  • Well logs and records of completed wells must be filed by the driller of record; failure to file is a licensing violation independent of well quality.

Quick reference

Water Well Construction and Drilling Methods

  • Cable tool drilling advances by repeatedly lifting and dropping a heavy bit, producing a slurry that is bailed out; it suits unconsolidated and fractured formations and gives clean samples.

  • Rotary air drilling uses compressed air as the circulating fluid and is common in hard bedrock; foam or water may be added to control dust and stabilize the hole.

  • Mud rotary drilling circulates a bentonite- or polymer-based slurry that cools the bit, lifts cuttings, and builds a filter cake on the borehole wall.

  • Driven and jetted wells are limited to shallow, unconsolidated settings; jetted wells are not acceptable where contamination can enter through the washed annulus.

  • The borehole must be sized to allow the required annular space for grout and casing; a minimum annular clearance is specified by rule rather than left to driller preference.

  • Wells must be sited away from contamination sources such as septic systems, animal lots, and fuel storage, using the required setback distances.

  • The well must be completed to a depth and into a formation that yields adequate quantity and quality; the driller records formation changes, water strikes, and static level.

  • Temporary casing or a conductor may be required through unconsolidated overburden to keep the hole open until permanent casing is set.

Quick reference

Well Casing, Grouting, and Sealing Requirements

  • Casing must extend from above finished grade down to the required depth, be watertight, and be capped with a sanitary well seal at the surface.

  • Casing must project above the ground or floor a minimum height and be surrounded by a concrete or grout pad sloped away from the well to shed surface water.

  • The annular space between borehole wall and casing must be sealed with neat cement, sand-cement, or bentonite grout placed from the bottom up, not dumped from the top.

  • Positive displacement grouting (tremie or pump) is required so the seal is continuous and free of voids and bridging; gravity pouring is not an acceptable seal.

  • Grout must extend from the bottom of the casing to the surface, or to the required depth where an outer casing or pitless adapter is used.

  • A pitless adapter must be installed below the frost line and be watertight where it penetrates the casing; a well pit is generally prohibited or tightly restricted.

  • Casing material must be new, sound, and of a type and wall thickness approved for potable water use; used or damaged casing may not be installed.

  • Where multiple aquifers are penetrated, grout or casing must isolate contaminated or undesirable water zones from the producing zone.

Quick reference

Well Development, Testing, and Disinfection

  • Development removes drilling mud, cuttings, and fines from the formation and filter pack, using surging, bailing, jetting, or air-lifting until the water clears.

  • Development continues until the discharge is free of sediment and the well reaches stable specific capacity; overdevelopment can cause formation collapse or sand pumping.

  • A yield test (pump or bail test) establishes the safe yield and drawdown; the pumping rate and duration must be recorded on the well log.

  • Static water level is measured before pumping; pumping water level is measured during the test, and drawdown is the difference between them.

  • Specific capacity equals pumping rate divided by drawdown, expressed in gallons per minute per foot of drawdown.

  • Disinfection uses a chlorine solution at a concentration sufficient to leave a residual in the well; the solution contacts the casing, screen, and pump for a specified holding period.

  • After disinfection the well is pumped to waste until the chlorine residual is gone before the water is used or sampled.

  • A bacteriological sample is collected after disinfection and flushing, in a sterile container, and submitted to a certified laboratory.

Quick reference

Well Abandonment and Plugging Procedures

  • A well that is no longer used or is incapable of producing potable water must be properly abandoned and sealed; leaving it open is a violation.

  • Abandonment requires removing or perforating obstructions so that sealant can be placed throughout the full length of the borehole.

  • The borehole is filled from the bottom up with approved grout or sealing material, typically neat cement or bentonite, using a tremie or pump.

  • Casing may be removed as sealing proceeds, or left in place and sealed; the seal must prevent movement of water between aquifers.

  • Where the well penetrates multiple aquifers, the seal must be continuous and must not allow cross-connection between water-bearing zones.

  • The top of the abandoned well is cut off below grade and capped, and the location is recorded so future excavation does not disturb the seal.

  • An abandonment report describing the method, materials, and quantities is filed with the Division of Water Resources.

  • Flowing or artesian wells require special sealing to control the flow before and during plugging.

Quick reference

Ohio Water Resources Law, Rules, and Reporting

  • Ohio water well construction, alteration, and abandonment are governed by statute and by rules adopted by the Division of Water Resources.

  • A well log must be filed for each well, recording location, depth, formations, casing, grout, screen, yield, and static water level.

  • Logs are submitted within the time required by rule after completion; late or missing logs are a reportable violation.

  • The driller must provide the well owner a copy of the well log and any water quality information obtained at completion.

  • Water withdrawal from high-capacity wells may trigger permitting and reporting thresholds under Ohio water resources law.

  • The Division may inspect wells and require correction of defects in casing, grout, or sealing; failure to comply can lead to license action.

  • Records must be retained and made available to the Division on request, and changes of address or business status must be reported.

  • Local health districts may impose additional siting and permitting requirements that apply alongside state well rules.