Oklahoma Land Surveyor (OLS) Exam flashcards
Oklahoma Land Surveyor (OLS) Exam · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Priority of calls
- Rule that natural monuments control over artificial monuments, which control over courses, then distances, then area, when resolving conflicting boundary calls.
- Adverse possession period
- In Oklahoma, the statutory period for adverse possession is 15 years under Okla. Stat. tit. 12 § 93, requiring open, notorious, exclusive, hostile, and continuous possession.
- Navigable stream boundary
- For navigable streams, the boundary is the ordinary high water mark, and the state owns the submerged lands; non-navigable streams boundary is the thread (centerline).
- Accretion vs avulsion
- Accretion is gradual and imperceptible deposit of soil changing a boundary; avulsion is sudden change by water, which does not alter boundaries.
- Metes-and-bounds description
- A land description that starts at a known point and follows bearings and distances around the parcel, returning to the point of beginning, often with monuments.
- Recording statute
- Oklahoma is a notice/race-notice recording state; unrecorded deeds are valid between parties but may be void against subsequent good-faith purchasers without notice.
- NAD83 (2011)
- The current horizontal datum for Oklahoma and the U.S., replacing NAD27; coordinates change with datum and epoch, affecting state plane and geodetic positions.
- Oklahoma SPCS zones
- Oklahoma has two State Plane Coordinate System zones: North (OK-1) and South (OK-2), both using a Lambert Conformal Conic projection.
- Combined factor
- Combined factor = grid factor × elevation factor; grid distance = ground distance × combined factor, used to reduce ground measurements to state plane coordinates.
- OPUS
- Online Positioning User Service by NGS; processes static GPS data to provide coordinates in the National Spatial Reference System with cm-level accuracy.
- Geoid undulation
- The separation between the ellipsoid and the geoid; orthometric height H = ellipsoid height h − geoid undulation N, using a model like GEOID18.
- RTK/RTN
- Real-Time Kinematic or Real-Time Network GPS positioning providing cm-level accuracy in the field, requiring a radio or internet link and ambiguity resolution.
- PLSS township
- A public land survey unit 6 miles square containing 36 sections of 1 square mile (640 acres) each, numbered boustrophedon from the northeast corner.
- Section subdivision
- A section (640 acres) can be divided into aliquot parts: halves (320 ac), quarters (160 ac), and quarter-quarters (40 ac), described by direction from center.
- Correction lines
- Standard parallels every 24 miles and correction lines every fourth township line absorb measurement errors from convergence in the PLSS.
- Fractional lot
- A PLSS lot, often along north and west tiers or water boundaries, with area determined by survey rather than nominal aliquot parts.
- Lost corner
- A PLSS corner whose original position cannot be determined from evidence; reestablished by proportion (single or double proportionate measurement) using original records.
- Indian Meridian
- One of Oklahoma's principal meridians, with a baseline near Davis, OK; used for PLSS surveys in much of Oklahoma, along with the Cimarron Meridian.
- Latitude and departure
- In traverse computations, latitude = distance × cos(bearing) and departure = distance × sin(bearing); sums should close to zero for a closed traverse.
- Compass rule
- A traverse adjustment method (Bowditch rule) that distributes closure error proportionally to the total traverse length, adjusting latitudes and departures.
- Area by coordinates
- The shoelace formula: area = 0.5 |Σ(E_i×N_{i+1} − E_{i+1}×N_i)| for a closed polygon with coordinates (E,N).
- Horizontal curve formulas
- T = R tan(Δ/2), L = RΔ (Δ in radians), C = 2R sin(Δ/2), M = R(1−cos(Δ/2)), where R is radius and Δ is central angle.
- Vertical curve low point
- For a parabolic vertical curve, the location of the high or low point is at x = −g1 L/(g2−g1), where g1 and g2 are grades and L is curve length.
- EDM accuracy
- Electronic distance measurement accuracy is often stated as ±(2 mm + 2 ppm); atmospheric correction using temperature and pressure is required for precise work.
- Oklahoma platting statute
- Oklahoma municipal platting is governed by Okla. Stat. tit. 11, § 41-101 et seq., requiring planning commission approval and recording with the county clerk.
- Plat contents
- A subdivision plat must show name, legal description, boundary survey, lot and block numbers, dimensions, bearings, curve data, monuments, dedications, and certificates.
- ALTA/NSPS survey
- A land title survey meeting minimum standards for title insurance, including easements, improvements, and utilities; optional Table A items must be specified.
- Contour lines
- Lines on a topographic map connecting points of equal elevation; contour interval is the vertical distance between adjacent contours, used for drainage and grading.
- FEMA FIRM
- Flood Insurance Rate Map showing flood zones and base flood elevations, used for floodplain management and elevation certificates.
- Oklahoma licensure board
- The Oklahoma State Board of Licensure for Professional Engineers and Land Surveyors regulates licensure, exams, continuing education, and professional conduct.
- Continuing education requirement
- Oklahoma land surveyors must complete continuing professional development hours; check current board rules for the exact number per renewal period.
- Ethical seal use
- A licensed surveyor may seal and sign only work they prepared or directly supervised, practicing within their competence and avoiding conflicts of interest.