Oman CAA ATPL(A) Theory study materials
Oman CAA ATPL(A) Theory study resources

Muscat Departure with an Assumed Temperature and a Contaminated Runway

Oman CAA ATPL(A) Theory · Put your knowledge to work in context.

All case studies

Muscat Departure with an Assumed Temperature and a Contaminated Runway

You are the commander of a twin-engine turbofan aircraft (MTOW 78 000 kg) departing Muscat (OOMS), runway 26L, length 3584 m, elevation 15 m. OAT 41 °C, QNH 1004 hPa, wind 300°/12 kt. The runway is wet with standing water in patches; braking action reported medium. Performance software gives a full-thrust field-limited mass of 74 200 kg and a full-thrust screen height of 35 ft at V2. To reduce engine wear the operator's SOP permits an assumed temperature of 52 °C, which the software says yields a field-limited mass of 71 500 kg on a dry runway. Actual take-off mass is 70 800 kg. There is a 0.8 % upslope on the first 1200 m. The first obstacle is a 90 m mast 6.5 km from the brake release point, 0.3 % below runway datum.

1. Can the assumed temperature of 52 °C be used for this departure? Justify with reference to the certification logic of assumed-temperature thrust.

Read the worked answer

No - the assumed temperature must be discarded for this departure.

Assumed-temperature (flex) thrust is certified only on the basis that the reduced thrust still satisfies all take-off requirements on the actual runway condition. The wet/contaminated runway is the disqualifier here, not the temperature itself:

  1. Contamination. With standing water and medium braking action, the accelerate-stop distance is governed by a mu well below the dry value. The 71 500 kg figure in the software was computed for a dry runway; it cannot be transposed to a wet runway. Most operators and the AFM prohibit flex thrust on runways where braking action is medium or worse, or where there is standing water.
  2. Wet runway also changes V1. V1 must be reduced so that the stop is achievable on the contaminated surface, which further constrains the field-limited mass.
  3. Slope. The 0.8 % upslope over the first 1200 m increases the all-engine and one-engine-inoperative ground roll; the software figure must already include it, but any manual correction re-opens the margin.

With an actual mass of 70 800 kg against a dry flex limit of 71 500 kg the margin is only 700 kg - less than the penalty from water drag and reduced mu. Take off at full rated thrust (or the highest permissible derate) and recompute V1/VR/V2 for the wet case. If the recomputed field-limited mass falls below 70 800 kg, the departure is not legal and mass must be offloaded.

2. Assuming full thrust is used and the wet-runway field limit is 71 900 kg, verify the obstacle clearance at the 90 m mast and state what climb gradient is required.

Read the worked answer

Required gradient. The net take-off flight path must clear the obstacle by 35 ft vertically (CS/FAR 25.115 for a twin: net = gross − 0.8 % gradient). Obstacle height above the 35 ft screen point:

  • Runway elevation 15 m; obstacle top 90 m → 75 m above runway datum, plus 0.3 % of 6500 m = 19.5 m terrain fall → obstacle is about 94.5 m above the brake-release datum.
  • Screen height 35 ft ≈ 10.7 m at end of TODR. Net height required at the obstacle = 94.5 − 10.7 + 10.7 (35 ft clearance) ≈ 94.5 m.
  • Horizontal distance from screen point to obstacle ≈ 6500 − TODR. With TODR ≈ 2600 m, distance ≈ 3900 m.

Required net gradient = 94.5 / 3900 ≈ 2.4 %. Required gross gradient = 2.4 + 0.8 = 3.2 %.

Check. At 70 800 kg, 41 °C, QNH 1004, the second-segment gross gradient for this type is around 3.0 % and the acceleration-segment gradient lower still. That is marginal. Because the obstacle is beyond the end of the second segment, the relevant gradient is the take-off flight path gradient after gear retraction, which is higher - but the operator must confirm it from the AFM graph for 41 °C and the actual mass, not from a nominal figure. If the demonstrated gross gradient at the obstacle is below 3.2 %, the departure is obstacle-limited and mass must be reduced or a closer-in obstacle analysis performed.

Conclusion: the field limit (71 900 kg) is satisfied at 70 800 kg, but obstacle clearance is the binding constraint and must be verified from the AFM before dispatch.