Quick reference

Oracle Field Service Configuration and Implementation

  • Configuration hierarchy: instance → resource types, work order types, service request types, activity types, and properties; changes to types flow to every record using them, so clone rather than edit a type already in production use.

  • User types control screen and feature access for the application UI; resource types control what a field resource can do and which activity types can be assigned to them - they are separate objects and both must be set.

  • Custom properties are typed (integer, string, date/time, enum, boolean) and scoped per entity: resource, activity, work order, inventory, and service request properties are distinct namespaces.

  • Enumeration properties reference a named list of values; the list is maintained centrally, so adding a value propagates to all properties bound to that list without per-record edits.

  • Screen configuration (application screens / message scenarios) determines which properties appear on the resource's mobile or browser UI; a property not exposed on a screen is invisible to the field resource even if populated.

  • Business rules and message scenarios trigger on defined events (activity created, moved, completed, resource changed); a rule's condition is evaluated at event time, not continuously, so ordering of rules matters.

  • The configuration sandbox / test instance is where type and property changes are validated before promotion; configuration is not versioned automatically, so export or document changes before promoting.

  • Filters and quotas limit which activities a resource can receive; filters are evaluated at assignment time and exclude candidates, while quotas cap a resource's load by activity type or property value.

  • Plug-in and integration user accounts are configured as separate users with their own permissions; API calls authenticate as a user, so the account's user type governs what the integration can read or write.

Quick reference

Oracle Field Service Resources, Capacity, and Routing

  • Resource capacity is expressed as work time per day plus work zones and work skills; routing only considers resources whose work zone covers the activity's location and whose skills match the activity's required skills.

  • Work time is defined per resource per day (calendar-based), and capacity planning compares total required minutes of activities against available work time - overtime and travel time must be modeled explicitly.

  • Work zones are hierarchical: a parent zone includes its child zones, so assigning a resource to a parent zone makes it eligible for activities anywhere beneath it; overlapping zones create ambiguity resolved by routing rules.

  • Work skills have a rating (typically 1–10) and a ratio; the routing engine can require a minimum rating, and skill ratio influences how much of the resource's day the skill consumes.

  • Routing plans run on a schedule (not continuously) and may be scoped to a bucket, a resource group, or a time window; a plan run assigns activities but does not dispatch them - dispatching is a separate step.

  • Routing options control whether the engine optimizes travel time, priority, or due-date compliance, and whether it can reassign already-assigned activities; reassignment of in-progress activities is normally blocked.

  • Non-scheduled activities (bucket activities) are unassigned work waiting for routing; scheduled activities have a resource and time slot, and a routing run moves work from bucket to scheduled.

  • Resource calendars, shifts, and time-off entries reduce available capacity; a resource with no shift on a day is not a routing candidate even if skills and zones match.

  • Crews and multi-resource activities require all member resources to be available for the full activity duration; partial availability disqualifies the crew from the assignment.

Quick reference

Oracle Field Service Work Order and Activity Management

  • Work order is the customer-facing container; activity is the schedulable unit assigned to a resource. One work order can hold multiple activities (for example, install plus follow-up inspection), and activity status drives work order status.

  • Activity statuses typically progress from pending → started/en route → completed, with a not-done or cancelled branch; status transitions are governed by the activity type's status model and cannot be skipped arbitrarily.

  • Activity types define duration, required skills, required inventory, and which properties are mandatory; changing an activity type's duration affects newly created activities, not already-scheduled ones.

  • Service request types capture the intake form for a customer request; converting a service request creates a work order and activities, and the mapping between request properties and work order properties is configured.

  • Required inventory on an activity type reserves or consumes inventory when the activity is scheduled or completed; insufficient inventory can block completion depending on configuration.

  • Activity links (predecessor/successor, same-resource, same-time) constrain routing: a successor cannot be scheduled before its predecessor completes, and same-time links force simultaneous assignment.

  • Time slots and time windows constrain scheduling; the routing engine must place the activity inside the window, and a missed window produces a late activity that routing may flag but not always fix on the next run.

  • Mass update and activity search allow bulk status or property changes; bulk operations bypass some business rules, so validate rule-dependent fields after a mass update.

Quick reference

Oracle Field Service Integration and Data Management

  • The core integration surface is the REST API (outbound/inbound) plus the message queue for asynchronous events; outbound messages are delivered to a configured endpoint and retried on failure, so endpoints must be idempotent.

  • Authentication for integrations uses a configured user with an API client; tokens are issued per client and the user's permissions bound what the integration can access - there is no separate 'integration superuser'.

  • Inbound data uses the same object model as the UI: work orders, activities, resources, inventory, and properties; property values must match the property's declared type or the record is rejected.

  • Outbound message scenarios are configured per event and per recipient; the payload is a template, so field selection is explicit - adding a property to the object does not add it to existing messages.

  • Data import/export (CSV or bulk load) is used for initial loads and periodic syncs; imports are validated against required fields and referential integrity, and failed rows are reported rather than silently dropped.

  • Idempotency and duplicate prevention rely on external IDs: supply a stable external identifier on create so retries update rather than duplicate the record.

  • Time zone handling: store times in the instance time zone and convert at the boundary; an activity's time zone is derived from its resource or location, and mismatches cause off-by-hours scheduling errors.

  • Monitoring integration health means watching message queue backlog, failed message retries, and API error rates; a growing backlog indicates a consumer problem, not a producer problem.