OSHA 500 flashcards
OSHA 500 · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- General Duty Clause
- OSH Act Section 5(a)(1) requires each employer to furnish a workplace free of recognized hazards that are likely to cause death or serious physical harm to employees.
- OSHA inspection priority categories
- In order: imminent danger, fatality or catastrophe, valid employee complaint or referral, programmed inspection, and follow-up inspection. Higher-priority categories may preempt lower-priority ones.
- Notice of contest deadline
- An employer who disagrees with a citation, penalty, or abatement date must file a written notice of contest with the OSHA area director within 15 working days of receiving it.
- 29 CFR 1926
- The part of Title 29 of the Code of Federal Regulations containing OSHA's construction standards, covering construction, alteration, painting, and repair work, including demolition.
- State Plan effectiveness requirement
- A state safety and health plan approved by OSHA must be at least as effective as the federal program and cover the same hazards; OSHA may fund up to 50 percent of its cost.
- Fall protection trigger height
- In construction, 29 CFR 1926.501(b) requires conventional fall protection for employees exposed to falls of 6 feet or more to a lower level, with limited defined exceptions.
- Guardrail system dimensions
- Top rail must be 42 inches plus or minus 3 inches above the walking surface, with a midrail near 21 inches and a toe board of at least 3.5 inches.
- Personal fall arrest anchor strength
- Anchors must support at least 5,000 pounds per employee attached, or be designed and installed under a qualified person's supervision with a safety factor of at least two.
- Portable ladder extension height
- Extension ladders must extend at least 3 feet above the upper landing surface and be set at a 4:1 angle, one foot out for every four feet of height.
- Excavation protective system threshold
- Any trench or excavation 5 feet or deeper must have a protective system such as sloping, shoring, or a shield, unless the excavation is made entirely in stable rock.
- Spoil pile setback distance
- Excavated material and equipment must be kept at least 2 feet back from the edge of an excavation, and a competent person must inspect excavations daily before work begins.
- Power line clearance distance
- For overhead lines rated 50 kV or below, equipment and workers must stay at least 10 feet away; add 0.4 inch for each kV above 50.
- Class E hard hat
- A Class E (Electrical) hard hat provides dielectric protection against contact with conductors up to 20,000 volts; Class G protects to 2,200 volts and Class C gives no electrical protection.
- PPE hazard assessment certification
- 29 CFR 1910.132(d) requires employers to assess workplace hazards to select PPE and to prepare a written certification identifying the workplace evaluated, the person certifying, and the date.
- Employer payment for PPE
- Under 29 CFR 1926.95, employers must pay for required PPE, except items such as non-specialty safety-toe footwear, non-specialty prescription eyewear, and everyday clothing usable off the job.
- ANSI Z87.1 eye protection
- Safety glasses, goggles, and face shields must comply with ANSI Z87.1, which is marked on the device; ordinary prescription glasses are not acceptable eye protection unless Z87-rated with side protection.
- Respirator fit test and medical evaluation
- Before wearing a tight-fitting respirator, an employee must pass a medical evaluation and be fit tested annually; the employer must also provide training and ensure use of NIOSH-approved respirators.
- Respirable crystalline silica PEL
- 29 CFR 1926.1153 sets a permissible exposure limit of 50 micrograms per cubic meter as an 8-hour time-weighted average and an action level of 25 micrograms per cubic meter.
- Asbestos PEL and excursion limit
- Construction asbestos standard 29 CFR 1926.1101 sets an 8-hour time-weighted average PEL of 0.1 fiber per cubic centimeter and a 30-minute excursion limit of 1.0 fiber per cubic centimeter.
- Lead PEL in construction
- 29 CFR 1926.62 sets a permissible exposure limit of 50 micrograms per cubic meter over 8 hours and an action level of 30 micrograms per cubic meter, triggering monitoring and medical surveillance.
- Hexavalent chromium PEL
- 29 CFR 1926.1126 sets an 8-hour time-weighted average permissible exposure limit of 5 micrograms per cubic meter for hexavalent chromium, with an action level of 2.5 micrograms per cubic meter.
- Construction noise PEL
- 29 CFR 1926.52 sets a permissible exposure limit of 90 dBA for an 8-hour shift; 1926.101 requires feasible controls and, where controls are not feasible, hearing protection provided and worn.
- Seven core program elements
- OSHA's Recommended Practices list management leadership, worker participation, hazard identification and assessment, hazard prevention and control, education and training, evaluation and improvement, and coordination with contractors.
- Competent person definition
- Under 29 CFR 1926.32(f), a competent person is capable of identifying existing and predictable hazards in the surroundings and has authorization to take prompt corrective measures to eliminate them.
- Emergency action plan trigger
- 29 CFR 1926.35 requires an emergency action plan covering escape routes, procedures, and accounting for employees; employers with 10 or fewer employees may communicate the plan orally.
- Safety training requirement 1926.21
- 29 CFR 1926.21(b)(2) requires employers to instruct each employee in the recognition and avoidance of unsafe conditions and in the regulations applicable to the work environment.
- Job hazard analysis
- A job hazard analysis breaks a task into steps, identifies hazards at each step, and specifies controls; it is a core hazard identification method in a written safety and health program.
- Recordable injury criteria
- A work-related case is recordable if it causes death, days away, restricted work or transfer, medical treatment beyond first aid, loss of consciousness, or a significant injury diagnosed by a physician.
- Fatality reporting time limit
- An employer must report a work-related fatality to OSHA within 8 hours of learning of it, and must report an in-patient hospitalization, amputation, or loss of an eye within 24 hours.
- OSHA 300A posting period
- The annual summary of work-related injuries and illnesses, OSHA Form 300A, must be posted in a visible location from February 1 through April 30 of the year following the record year.
- Recordkeeping retention period
- OSHA injury and illness records (Forms 300, 300A, and 301) must be retained for 5 years following the end of the calendar year they cover, and must be updated as needed.
- Incidence rate formula
- The recordable incidence rate equals the number of recordable cases multiplied by 200,000, divided by total employee hours worked; 200,000 represents 100 employees working 40-hour weeks for 50 weeks.