PCEI flashcards
PCEI · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Beneficence and non-maleficence
- Beneficence is acting for the patient's benefit; non-maleficence is avoiding harm. Clinical engineers weigh both when selecting devices, prioritizing maintenance, and recommending use restrictions.
- Conflict of interest disclosure
- Any gift, fee, travel, or equity that could bias a procurement or evaluation decision must be disclosed in writing to the employer before the decision is made.
- Competence boundary rule
- A clinical engineer lacking documented training on a device class must escalate to a qualified colleague or the manufacturer rather than perform service, even for apparently routine tasks.
- Whistleblower protection scope
- Good-faith reports of device safety hazards or regulatory violations to an internal compliance channel or external regulator are legally protected from retaliation in most jurisdictions.
- Patient data confidentiality duty
- Device-generated clinical data, including alarm histories and therapy settings, may only be discussed on a need-to-know basis; unauthorized discussion breaches ethics codes and privacy law.
- Acceptance testing purpose
- Before clinical use, verify the device matches the purchase specification, passes safety tests, and record serial number, software version, and accessories in the inventory system.
- CMMS inventory core fields
- A maintenance system record should include unique asset ID, manufacturer, model, serial number, location, acquisition date, warranty end, PM schedule, and full service history.
- Availability formula
- Availability equals scheduled time minus downtime, divided by scheduled time. It is paired with mean time between failures and mean time to repair for reliability analysis.
- Electrical safety test set
- Patient-connected equipment testing typically covers protective earth resistance, chassis leakage current, and patient leakage current, compared against IEC 60601-1 limits.
- Decommissioning requirements
- Retirement includes sanitizing stored protected health information, archiving or removing the maintenance record, and disposing of batteries and hazardous components compliantly.
- Life-cycle cost replacement rule
- Replacement decisions compare cumulative maintenance cost against replacement cost, weighted by parts-availability risk, clinical demand, and remaining useful life.
- FDA device risk classes
- Class I devices are low risk under general controls; Class II moderate risk with special controls and often a 510(k); Class III high risk requiring premarket approval.
- 510(k) substantial equivalence
- A 510(k) submission demonstrates that a new device is substantially equivalent to a legally marketed predicate device in intended use and technological characteristics.
- EU MDR risk classes
- Regulation 2017/745 assigns classes I, IIa, IIb, and III, requires notified body involvement for most classes, and mandates unique device identification and post-market surveillance.
- IEC 60601-1 scope
- This is the general safety standard for medical electrical equipment; the -1-2 collateral covers electromagnetic compatibility and other collaterals address specific modalities.
- ISO 14971 role
- ISO 14971 defines the medical device risk management process, from hazard identification through risk control, residual risk evaluation, and post-production monitoring.
- IEC 62304 safety classes
- Software safety class A means no injury is possible, B means non-serious injury is possible, and C means death or serious injury is possible.
- Risk control hierarchy
- Controls are applied in order: inherently safe design first, then protective measures in the device or process, then information for safety such as labeling and training.
- FMEA risk priority number
- RPN equals severity multiplied by occurrence multiplied by detection. Higher values prioritize which failure modes receive mitigation effort first.
- Root cause analysis method
- A structured timeline, causal factor charting, and techniques such as five whys or fault tree analysis move the investigation from proximate cause to underlying system cause.
- Incident evidence preservation
- Quarantine the device, retain accessories and disposables, capture alarm logs and error codes, and document the clinical sequence before any repair or reset occurs.
- Use error as system issue
- Human factors cause many device incidents. Use error reflects design and workflow weaknesses and should be analyzed as a system problem, not solely operator failure.
- HL7 FHIR characteristics
- FHIR uses RESTful application programming interfaces with JSON or XML resource representations, supporting modern interoperability alongside the older HL7 version 2 messaging standard.
- DICOM standard purpose
- DICOM governs medical imaging storage and transfer, including modality worklists, image objects, and a defined data dictionary of attributes for each object.
- IEC 80001-1 principle
- It addresses risk management when medical devices are connected to IT networks; the responsible organization must assess network risk before permitting connection.
- Premarket cybersecurity package
- FDA expectations include a threat model, security risk assessment, software bill of materials, and a coordinated vulnerability disclosure policy in the submission.
- Device hardening baseline
- Change default credentials, disable unused services and ports, segment clinical networks, patch on a risk-based schedule, and maintain a current device asset inventory.
- Network segmentation rationale
- Separating clinical device networks from enterprise and guest networks, with firewalls or unidirectional gateways, limits lateral movement from compromised IT systems.
- Critical path definition
- The critical path is the longest dependent sequence of project tasks; any delay on it delays the project end date unless the schedule is compressed.
- Earned value variances
- Cost variance equals earned value minus actual cost; schedule variance equals earned value minus planned value. Negative values indicate cost overrun or schedule delay.
- Stakeholder influence-interest grid
- Stakeholders are mapped by influence and interest; those high in both require active management and frequent direct communication throughout the project.
- Capital business case elements
- A device purchase case includes clinical need, volume projections, total cost of ownership, reimbursement or revenue impact, and the risk of taking no action.