Phase II Data Integrity Under Client Pressure

PCEW · Put your knowledge to work in context.

All case studies

Phase II Data Integrity Under Client Pressure

EcoLine Consulting is completing a Phase II ESA for a 4.2-acre former dry cleaner before sale. The lab reports tetrachloroethene (PCE) in groundwater at 82 µg/L in one monitoring well; the federal MCL is 5 µg/L. The client's attorney emails the project manager: 'Delete the exceedance table. The plume may be off-site, so just say no recognized environmental conditions were found. We'll handle it after closing.' The field chain-of-custody shows the VOC sample was collected at 9:15 a.m. and received by the lab at 4:40 p.m.; the lab log shows 8:50 a.m. and 4:10 p.m. The sample was analyzed on day 15, one day past the 14-day holding time, and the lab flagged it. The project manager says, 'Mark it estimated and don't mention the holding time-it won't change the conclusion.' The report is due tomorrow.

1. How should the consultant respond to the attorney's instruction to delete the exceedance table? Explain the ethical and reporting obligations.

Read the worked answer

The consultant cannot delete the exceedance table. A Phase II ESA report must accurately present the data collected, including the PCE detection at 82 µg/L and its comparison to the 5 µg/L MCL. Omitting a detected exceedance because it may be off-site or because it could affect the sale would misrepresent the environmental condition and could constitute fraud or professional misconduct. The attorney's instruction is not a lawful basis to alter the report; the consultant's obligation is to the integrity of the data and the public interest, not to the client's transaction.

The consultant should respond in writing: the report will include the result, a clear comparison to the MCL, and appropriate caveats-e.g., the plume is not fully delineated, off-site migration should be evaluated, and additional wells are needed. Context is permissible; deletion is not. If the client insists, the consultant should escalate to a principal or ethics officer, document the request, and be prepared to withdraw from the engagement rather than issue a misleading report. The project manager's instruction to 'just say no recognized environmental conditions' is also wrong: a recognized environmental condition is a presence or likely presence of contamination, and the PCE result meets that concept.

2. What is the significance of the holding-time exceedance and the chain-of-custody time discrepancy? How should the data be reported?

Read the worked answer

The holding-time exceedance matters. Volatile organic compounds such as PCE can be lost from a sample between collection and analysis; analyzing on day 15 instead of within the 14-day holding time means the result may be biased low. The lab correctly flagged it. The data can still be reported, but they must be qualified as estimated and not used as the sole basis for a definitive risk conclusion or closure decision. The appropriate action is to resample and reanalyze within holding time, especially because the 82 µg/L result is already above the MCL and may be an underestimate.

The chain-of-custody time discrepancy (9:15 vs 8:50 and 4:40 vs 4:10) is a data-integrity issue. It may be a transcription error, but it must be documented and resolved with the field technician and the lab; the consultant should not silently accept it or alter the form. The report should include a data-quality section describing the holding-time exceedance and the COC discrepancy. If the discrepancies cannot be resolved, the data should be flagged and the resampling should be prioritized.

3. What documentation and internal actions should follow if the client insists on omitting the result?

Read the worked answer

Document the attorney's email, the project manager's instruction, and all responses. Keep the original COC, lab receipt records, and raw data; do not alter or backdate them. The consultant should send a written response to the client explaining that the report will include the exceedance and the data qualifiers, and why. If the client continues to insist on omission, escalate internally and consider withdrawing; a report that omits a known exceedance is misleading even if the client accepts the risk. If the report is issued over the consultant's objection, the consultant should ensure their name and seal are not attached to a false statement.

The final report should include: the PCE result with the MCL comparison; a clear statement that the data are estimated due to holding time; the COC discrepancy; a recommendation for resampling and plume delineation; and a limitation that the findings are based on the available data. Retain the correspondence and the draft versions per the firm's retention policy. If the client terminates the consultant, the consultant still must not release a misleading report and should consider whether notification to the agency is required by law or professional duty.