Environmental Regulations, Permits, and Compliance Reporting

  • Clean Air Act Title V permits apply to major sources; Title V is a federally enforceable operating permit that consolidates all applicable requirements into one document.

  • Clean Water Act NPDES permits regulate point source discharges to waters of the US; stormwater discharges from construction sites disturbing 1 acre or more require coverage.

  • RCRA Subtitle C governs hazardous waste from cradle to grave; Subtitle D governs non-hazardous solid waste and is implemented primarily by states.

  • CERCLA (Superfund) authorizes response to releases and establishes liability for past disposal; EPCRA requires community right-to-know reporting under SARA Title III.

  • Toxicity Characteristic Leaching Procedure (TCLP) determines whether a waste exhibits the toxicity characteristic; the regulatory levels are in 40 CFR 261.24.

  • Permit modifications: minor modifications can often be handled administratively, while major modifications require public notice and comment periods.

  • Compliance reporting deadlines: Title V annual certifications, EPCRA Tier II by March 1, and TRI Form R by July 1 each year.

  • A permit shield protects a permittee from enforcement for complying with permit terms, but only for requirements explicitly addressed in the permit application.

Quick reference

Hazardous and Non-Hazardous Waste Management and Disposal

  • A waste is hazardous if it is listed (F, K, P, U lists) or exhibits a characteristic: ignitability, corrosivity, reactivity, or toxicity.

  • Ignitability: flash point below 140 degrees F; corrosivity: pH less than or equal to 2 or greater than or equal to 12.5; reactivity: unstable or generates toxic gases.

  • Generator categories: very small quantity generator (VSQG), small quantity generator (SQG), and large quantity generator (LQG), based on monthly generation rates.

  • LQG requirements include 90-day accumulation limits, contingency plans, personnel training, and biennial reporting; SQG limits are 180 days or 270 days if shipping over 200 miles.

  • Universal wastes (batteries, lamps, mercury devices, pesticides) have streamlined handling rules under 40 CFR 273.

  • Used oil destined for recycling is regulated separately; if it is mixed with hazardous waste, the mixture is generally managed as hazardous waste.

  • Land disposal restrictions (LDR) require treatment standards be met before hazardous waste can be land disposed, often via specified treatment technologies.

  • Manifest system: the uniform hazardous waste manifest (EPA Form 8700-22) tracks waste from generator to transporter to treatment, storage, and disposal facility (TSDF).

Quick reference

Water and Wastewater Treatment, Discharge, and Stormwater Controls

  • Secondary treatment standards for municipal wastewater: BOD5 and total suspended solids (TSS) 30-day averages of 30 mg/L, with percent removal requirements.

  • NPDES permits set effluent limitations, monitoring requirements, and reporting; discharge monitoring reports (DMRs) are typically submitted monthly.

  • Stormwater pollution prevention plans (SWPPP) require best management practices (BMPs), inspections, and recordkeeping for construction and industrial sites.

  • Total maximum daily load (TMDL) allocates pollutant loading among point and nonpoint sources for impaired water bodies.

  • Wastewater treatment train: preliminary (screening/grit), primary (settling), secondary (biological, e.g., activated sludge), and tertiary (nutrient removal, filtration, disinfection).

  • BOD5 measures oxygen demand over 5 days at 20 degrees C; COD is a faster chemical measure of oxygen demand that includes non-biodegradable organics.

  • Combined sewer overflows (CSOs) and sanitary sewer overflows (SSOs) have specific notification and reporting requirements to state agencies.

  • Spill Prevention, Control, and Countermeasure (SPCC) plans are required for facilities with oil storage above threshold quantities that could reach navigable waters.

Quick reference

Air Emissions, Permitting, and Monitoring

  • New Source Review (NSR): Prevention of Significant Deterioration (PSD) applies in attainment areas; nonattainment NSR applies in areas exceeding the NAAQS.

  • National Ambient Air Quality Standards (NAAQS) cover six criteria pollutants: CO, Pb, NO2, O3, PM, and SO2.

  • Title V annual compliance certification must be submitted at least annually, signed by a responsible official.

  • Continuous emission monitoring systems (CEMS) require quality assurance plans and relative accuracy test audits (RATA).

  • Greenhouse gas reporting: facilities emitting 25,000 metric tons CO2e or more per year must report under the GHG Reporting Program (40 CFR 98).

  • Minor source permits (state or local) impose limits below major source thresholds; synthetic minor permits cap potential to emit.

  • Emission factors from AP-42 are used for estimating emissions; actual measurements and mass balance are alternatives.

  • Leak detection and repair (LDAR) programs require monitoring of valves, pumps, and connectors for volatile organic compound leaks at specified intervals.

Quick reference

Site Assessment, Remediation, and Contaminated Media Handling

  • Phase I Environmental Site Assessment (ESA) uses ASTM E1527 to identify recognized environmental conditions (RECs) through records review, site visit, and interviews.

  • Phase II ESA involves sampling to confirm or rule out contamination identified in the Phase I; it typically uses soil, groundwater, and soil vapor sampling.

  • Risk assessment uses the four-step framework: hazard identification, dose-response assessment, exposure assessment, and risk characterization.

  • Remediation technologies include soil vapor extraction, pump-and-treat, in-situ chemical oxidation, bioremediation, and thermal treatment.

  • Groundwater monitoring wells are installed and sampled to define contaminant plumes; low-flow purging minimizes turbidity and improves sample representativeness.

  • Institutional controls (e.g., deed restrictions) and engineering controls (e.g., caps, barriers) manage residual risk at contaminated sites.

  • Vapor intrusion assessment evaluates migration of volatile contaminants from soil or groundwater into overlying buildings.

  • Contaminated soil handling requires characterization, waste determination, and proper disposal or treatment per RCRA and state requirements.

Quick reference

Environmental Health and Safety, Occupational Exposure, and Emergency Response

  • OSHA permissible exposure limits (PELs) are enforceable 8-hour time-weighted averages; ACGIH TLVs are recommended but not legally enforceable.

  • Hazard communication (HazCom) requires safety data sheets (SDS), container labeling, and employee training under 29 CFR 1910.1200.

  • Respirator selection follows OSHA 29 CFR 1910.134; fit testing is required annually and for each respirator type.

  • Emergency response: the Incident Command System (ICS) provides a standardized organizational structure; HAZWOPER (29 CFR 1910.120) governs hazardous waste operations and emergency response training.

  • Personal protective equipment (PPE) selection uses hazard assessment; levels A through D define protection for chemical protective clothing.

  • Confined space entry requires atmospheric testing, attendant, entry permit, and rescue plan under 29 CFR 1910.146.

  • Exposure monitoring uses personal sampling devices; results are compared to PELs, and overexposure triggers engineering or administrative controls.

  • Emergency planning: EPCRA requires facilities to report releases above reportable quantities (RQs) to the National Response Center and state/local agencies.

Quick reference

Sampling, Monitoring, Chain of Custody, and Data Quality

  • Chain of custody documentation records sample possession from collection through analysis; each transfer must be signed and dated.

  • Data quality objectives (DQOs) define the type, quantity, and quality of data needed for a decision; they guide sampling design.

  • Quality assurance/quality control (QA/QC) includes blanks, duplicates, matrix spikes, and calibration checks to assess precision and accuracy.

  • Holding times specify the maximum time a sample can be held before analysis; they vary by parameter and preservation method.

  • Sample preservation (e.g., acidification to pH less than 2, refrigeration to 4 degrees C) maintains sample integrity during transport.

  • Detection limits: method detection limit (MDL) and practical quantitation limit (PQL) define the lowest measurable concentrations.

  • Representativeness requires proper sampling technique, equipment decontamination, and avoidance of cross-contamination.

  • Laboratory data validation checks for method compliance, calibration, blanks, and QC exceedances before data are used for decisions.

Quick reference

Professional Ethics, Recordkeeping, and Reporting Integrity

  • Regulatory reports and certifications must be accurate and complete; false statements can violate federal law (e.g., 18 U.S.C. 1001) and professional codes.

  • A responsible official signing a certification must have personal knowledge or a reasonable basis for the certification.

  • Recordkeeping retention varies: hazardous waste manifests generally 3 years, Title V records 5 years, and some permits require longer.

  • Data integrity: never alter, fabricate, or selectively omit monitoring data; deviations must be documented and reported as required.

  • Conflicts of interest must be disclosed; professional judgment should not be influenced by financial or personal interests.

  • Confidential business information (CBI) claims must be substantiated and submitted per regulatory procedures; not all information qualifies.

  • When errors are discovered in submitted reports, promptly notify the agency and submit corrections; concealment compounds liability.

  • Professional codes (e.g., engineering and environmental certification bodies) require protecting public health and the environment above employer interests.