PE Civil study plan
PE Civil · Give each week a clear focus.
8 weeks · About 7 hours per week
Civil: Geotechnical
Compute phase relationships (void ratio, porosity, water content, unit weights, degree of saturation) from a given set of index properties
Classify at least 15 soils using both USCS and AASHTO systems and state the basis for each boundary decision
Interpret a standard and modified Proctor curve to determine maximum dry density and optimum moisture content
Derive total, pore-water, and effective vertical stress profiles to a depth of 30 ft for layered profiles, including a capillary zone and a water table
Calculate seepage quantity and exit gradient through a simple embankment using Darcy's law and a flow net
Your checkpoint
A completed 30-problem problem set covering phase relationships, classification, compaction, and effective stress, scored at 80% or better on a self-graded answer key
Civil: Geotechnical
Compute primary consolidation settlement for a normally consolidated and an overconsolidated clay layer using the appropriate compression index
Determine time rate of consolidation from Cv and degree of consolidation; compute t50 and t90 for a given drainage path
Select shear strength parameters (c, phi) for total stress versus effective stress conditions and defend the selection in writing
Calculate allowable bearing capacity using Terzaghi and Meyerhof methods, applying a factor of safety and footing shape and depth corrections
Evaluate slope stability by infinite-slope and method-of-slices reasoning, and compute the factor of safety against sliding and overturning for a cantilever retaining wall
Your checkpoint
A one-page handwritten formula sheet for settlement, bearing capacity, and lateral earth pressure, plus 25 worked problems checked against a reference, with a written list of every error made
Civil: Structural
Analyze determinate beams, frames, and trusses to find reactions, member forces, and internal forces using equilibrium and method of sections
Draw shear and bending moment diagrams for at least 10 beams with varied loading including overhangs, cantilevers, and point moments
Compute section properties including centroid, moment of inertia, and section modulus for built-up and composite sections
Calculate beam deflections and column buckling capacity using Euler and AISC approaches, and state when each applies
Your checkpoint
A bound set of 10 fully drawn shear and moment diagrams with reactions and maximum values labeled and verified numerically
Civil: Structural
Apply ASCE 7 load combinations to determine controlling factored demand for given dead, live, wind, and snow loads
Compute required reinforcement area and check tension-controlled limits for a singly reinforced concrete beam in flexure and shear
Check an axially loaded steel column and a steel beam in bending using AISC LRFD provisions, including slenderness and lateral-torsional buckling
Verify shear and moment capacity for a simple connection and a short-span beam, then identify the governing limit state in writing
Your checkpoint
A timed 40-question mixed geotechnical and structural practice exam completed in 160 minutes, scored at 70% or higher, with a written error log
Civil: Construction
Build a critical path schedule from a precedence diagram, identify the critical path, and compute total and free float for each activity
Develop a project cost estimate from quantity takeoffs for concrete, earthwork, and asphalt line items
Analyze a simple earned-value scenario to compute CPI and SPI and state the corrective action implied
Select appropriate earthmoving equipment and compute productivity, cycle time, and required fleet size for a haul scenario
Identify OSHA excavation, fall protection, and crane safety requirements applicable to a described site condition
Your checkpoint
A complete CPM schedule solution plus a cost and schedule narrative for a small site project, including a takeoff table, float table, and one-page earned-value summary
Civil: Transportation
Compute stopping sight distance, decision sight distance, and passing sight distance and compare each to a given design condition
Design horizontal curves including radius, superelevation, and transition length, and check design speed compliance
Design a vertical curve by computing K values, high or low point location, and required sight distance
Compute pavement structural number and ESAL-based design inputs for a flexible pavement section
Perform a signalized intersection capacity and level-of-service check using saturation flow and flow-ratio reasoning
Your checkpoint
A design packet with three complete geometric design problems (one horizontal curve, one vertical curve, one intersection) showing all inputs, calculations, and a pass/fail statement against AASHTO criteria
Civil: Water Resources and Environmental
Apply the rational method and the NRCS curve number method to compute peak runoff for a given watershed and compare results
Route a hydrograph through a simple reservoir or channel using a level-pool or Muskingum approach and report peak attenuation
Design a circular and a trapezoidal channel using Manning's equation and verify the Froude number and permissible velocity
Size a primary clarifier and an activated sludge aeration basin using typical loading rates, then compute solids retention time
Calculate a water demand, head loss through a distribution pipe network, and required pump horsepower
Your checkpoint
A two-part calculation workbook containing one hydrology problem, one hydraulics problem, one water treatment sizing problem, and one wastewater sizing problem, each with units carried through and answers boxed
Civil: Construction & Civil: Geotechnical & Civil: Structural & Civil: Transportation & Civil: Water Resources and Environmental
Complete two full-length timed practice exams under exam conditions and score each by domain
Rank all five domains by accuracy from those exams and re-drill the two lowest-scoring domains
Recite from memory the governing formulas for phase relationships, bearing capacity, beam design, sight distance, and Manning's equation
Resolve every missed question from weeks 1 through 7 and confirm each is closed out in the error log
Your checkpoint
A final domain-by-domain scorecard from two timed practice exams plus a closed error log in which every missed item has a corrected worked solution
Milestones
Week 2: Complete a 20-question geotechnical self-quiz in 80 minutes and score at least 75%; the one-page geotechnical formula sheet is finished and used during the quiz
Week 4: Complete a 40-question mixed geotechnical and structural timed exam at 70% or higher, with an error log listing the cause of each miss
Week 6: Complete a 40-question mixed construction and transportation timed exam at 70% or higher, and confirm all three geometric design problems in the week 6 packet pass AASHTO checks
Week 8: Score at least 70% overall on two full-length timed practice exams with no single domain below 60%, and confirm every error log entry is closed