PE Fire Protection · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fire Protection Analysis (fire dynamics, hazard and risk assessment)

  • Diagram the four stages of compartment fire development and label the controlling heat-transfer mechanism at each stage

  • Compute heat release rate from fuel mass-loss rate and heat of combustion for three worked fuel packages

  • Differentiate flashover, backdraft, and smoke explosion by their precursor conditions and the design decisions each drives

  • Apply a qualitative hazard-and-risk matrix to rank three occupancy scenarios by consequence and likelihood

  • Predict ceiling-jet and smoke-layer behavior from compartment geometry and ventilation openings

Your checkpoint

A two-page calculation-and-diagram sheet covering one full compartment fire scenario, plus a 20-question self-quiz scored at 80% or higher

Week 2

Fire Suppression Systems

  • Trace the water-based suppression design sequence from hazard classification through discharge criteria to supply demand

  • Compare wet-pipe, dry-pipe, preaction, and deluge systems by activation logic and suitable occupancy

  • Sketch a riser diagram for a single-story building showing control valve, check valve, alarm devices, and test connection

  • Calculate a required fire pump pressure and flow demand from a given supply curve and system demand point

  • Distinguish design, acceptance, and maintenance obligations across the water-based system standards family

Your checkpoint

A complete water-based suppression design narrative for a hypothetical mercantile building, with riser sketch and pump demand calculation

Week 3

Fire Suppression Systems & Fire Protection Analysis (fire dynamics, hazard and risk assessment)

  • Contrast clean-agent, inert-gas, foam, dry-chemical, and carbon-dioxide systems by extinguishing mechanism and prohibited-use conditions

  • Size a clean-agent total-flooding quantity for a given enclosure volume and design concentration

  • Explain the fire-dynamics rationale behind each special-hazard agent selection

  • Verify enclosure integrity, hold-time, and leakage considerations for a gaseous system

  • Select detection and actuation cross-zoning strategy for a special-hazard suppression system

Your checkpoint

A one-page agent-selection matrix for five hazards, with a worked clean-agent flooding calculation and a written justification of each choice

Week 4

Life Safety, Egress, and Passive/Smoke Control Systems

  • Compute occupant load, required egress width, and number of exits for two mixed-use floor plans

  • Check travel distance and common-path limits against the applicable requirements for each occupancy

  • Classify opening protectives, shaft enclosures, and rated assemblies on a sample drawing

  • Compare smoke-control approaches (pressurization, exhaust, passive containment) by driving force and failure mode

  • Evaluate a corridor and stairwell arrangement for dead-end, exit-access, and door-swing deficiencies

Your checkpoint

A marked-up egress and passive-protection review of one floor plan listing every deficiency found with the governing requirement category

Week 5

Fire Detection and Alarm Systems

  • Map the detection-to-notification signal path and identify where each component class sits in it

  • Match detector technology (spot smoke, beam, heat, flame, aspirating) to occupancy conditions that favor or defeat it

  • Explain the difference between conventional, addressable, and analog-intelligent architectures in troubleshooting terms

  • Define supervision, annunciation, and off-premises signaling requirements for a protected premises

  • Diagnose a described false-alarm problem and propose detection changes with justification

Your checkpoint

A device-selection and signaling-path diagram for a four-story office building with a written rationale for each detector type chosen and a false-alarm mitigation memo

Week 6

Codes, Standards, and Regulations & Fire Detection and Alarm Systems

  • Organize the governing codes, standards, and regulations into a hierarchy of adoption, amendment, and enforcement

  • Identify which standard governs sprinkler design, alarm installation, life safety, pump installation, and smoke control from memory

  • Distinguish prescriptive, performance-based, and equivalency compliance paths and their documentation burdens

  • Cross-reference a described design condition against the required standard family and cite the obligation without section numbers

  • Explain the roles of the authority having jurisdiction and the design professional in plan review and acceptance

Your checkpoint

A one-page code-map flowchart plus a 25-question standards-identification quiz scored at 85% or higher

Week 7

Fire Protection Analysis (fire dynamics, hazard and risk assessment) & Fire Suppression Systems & Life Safety, Egress, and Passive/Smoke Control Systems

  • Solve timed mixed-topic problem sets drawn from fire dynamics, suppression design, and egress analysis

  • Re-derive the five weakest calculations from weeks 1 through 4 without notes

  • Reconcile conflicting trade-offs between suppression, egress, and passive protection in a single scenario

  • Explain a design decision aloud in exam-style language in under two minutes per topic

  • Re-score every prior self-quiz and log each missed item by root cause

Your checkpoint

A weak-area log with root causes for every missed item across weeks 1 through 6, plus retake scores showing improvement on at least three of five problem sets

Week 8

Codes, Standards, and Regulations & Fire Detection and Alarm Systems & Life Safety, Egress, and Passive/Smoke Control Systems

  • Complete two full-length timed practice exams under test-day conditions and score each

  • Review every missed item to the underlying principle, not just the correct answer

  • Drill high-frequency recall items across all five domains in ten-minute blocks

  • Rebuild the code-map and hazard-matrix reference sheets from memory

  • Set a re-test date and a maintenance cadence for any domain still below 75%

Your checkpoint

Two scored practice exams with a written remediation plan naming the domains and topics to re-study before test day

Milestones

Week 2: Explain flashover precursors and state a fire pump demand calculation from memory in under 10 minutes

Week 4: Score 75% or higher on a 30-question mixed quiz covering Domains 1, 4, and 5

Week 6: Identify the correct governing standard for 20 of 25 described design conditions

Week 8: Score 80% or higher on both full-length timed practice exams