PE Geotechnical: Site Characterization and Subsurface Exploration

PE Geotechnical · Work through your exam, one topic at a time.

All guide sections

Site Characterization and Subsurface Exploration

Planning the program

Questions in this domain ask whether you can scope an investigation and then read the results critically. Know the rules of thumb: borings at building corners and center, spacing roughly 50–100 ft for fills and 200–500 ft for linear work, and termination at the depth where the foundation-induced stress increase falls to about 10% of the effective overburden stress - often 1.5B to 2B below a footing, deeper for piles or groups.

Sampling and in-situ testing

Distinguish split-spoon (disturbed, SPT), Shelby tube (undisturbed, cohesive), and rock coring. For rock, know TCR, SCR, and RQD; RQD counts only sound pieces 100 mm (4 in) or longer measured along the core axis, and it is not recovery. SPT corrections are perennial exam material: N60 = Nm(ER/60), then N1,60 = Cn·N60 with Cn = (pa/σ'v)^0.5 capped near 2.0. Hammer type, rod length, sampler liner, and borehole diameter all matter. CPT gives continuous tip resistance, sleeve friction, and pore pressure but no sample; geophysics (refraction, MASW, resistivity) images stratigraphy and stiffness from the surface.

Traps

Reporting the water level observed the morning after drilling rather than the stabilized level - caving, perched, and artesian conditions all mislead. Also watch for sample disturbance inflating compressibility, and for confusing RQD with core recovery.

Worked rule of thumb

Field N = 18 with a 60%-efficient hammer and standard sampler: N60 = 18. At 20 ft, γ = 120 pcf, water table at 10 ft: σ'v = 2,400 − 624 = 1,776 psf. Cn = √(2,116/1,776) = 1.09, so N1,60 ≈ 20.