PE Geotechnical study materials
PE Geotechnical study resources

PE Geotechnical study plan

PE Geotechnical · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Soil Mechanics and Laboratory/Field Testing

  • Derive total, pore pressure, and effective vertical stress profiles from three boring logs you draw yourself, including a capillary-zone and a perched-water case.

  • Compute primary consolidation settlement and time rate (U vs. T) for a two-layer profile using your own compressibility inputs.

  • Classify 12 soils by USCS from gradation curves and Atterberg limits you tabulate, and state the engineering implication of each classification.

  • Interpret Mohr-Coulomb strength parameters from triaxial and direct shear data sets you construct, distinguishing drained from undrained response.

Your checkpoint

A 15-problem self-authored worked set (effective stress, settlement, classification, strength) solved closed-book, scored against your own answer key at 80% or better.

Week 2

Soil Mechanics and Laboratory/Field Testing & Shallow and Deep Foundations

  • Select design shear strengths for a given site by justifying consolidation state, drainage condition, and test type.

  • Apply bearing capacity equations for strip, square, and circular footings with eccentric and inclined loading, and check against settlement control.

  • Distinguish allowable-stress, LRFD, and global-factor approaches and compute a footing size each way.

  • Build a decision flow for choosing spread footing vs. mat vs. deep foundation from load and soil conditions.

Your checkpoint

A one-page bearing capacity and settlement calculation sheet (equations, units, failure modes) plus a 20-question self-written quiz scored at 80% or better.

Week 3

Shallow and Deep Foundations

  • Compute single-pile axial capacity in sand and clay by both static analysis and in-situ test correlations, and reconcile the difference.

  • Compute pile group capacity and group settlement, and apply the appropriate group efficiency reasoning.

  • Evaluate downdrag, uplift, and lateral load resistance for a pile, and state when each governs.

  • Compare driven vs. bored vs. micropile behavior and select a foundation type for three contrasting profiles.

Your checkpoint

A worked pile design package for one clay site and one sand site: capacity, group check, settlement estimate, and a one-paragraph justification of the selected foundation type.

Week 4

Shallow and Deep Foundations & Earth Retaining Structures and Slope Stability

  • Design a cantilever and a braced retaining wall: compute lateral earth pressures, check overturning, sliding, bearing, and global stability.

  • Compute active, passive, and at-rest pressures for layered and sloping backfill with surcharge and water, using Rankine and Coulomb and stating when each applies.

  • Determine anchorage and strut loads for a braced excavation, including apparent earth pressure diagrams.

  • Re-drill the weakest 10 problems from weeks 2 and 3 to full correctness.

Your checkpoint

A complete retaining wall design calculation for one 5 m cantilever wall with water and surcharge, with all stability checks passing or explicitly failed with a fix stated.

Week 5

Earth Retaining Structures and Slope Stability

  • Perform infinite-slope and circular-failure slope stability analyses by hand for a layered profile, and compare with a method-of-slices framework.

  • Compute factor of safety under rapid drawdown, seismic (pseudo-static), and surcharge loading conditions.

  • Evaluate slope repair options (regrading, drainage, reinforcement, retaining structure) and quantify the factor-of-safety gain of each.

  • Design a geosynthetic-reinforced or soil-nail slope with pullout and facing checks.

Your checkpoint

A slope stability report for one hypothetical site: three loading cases analyzed, mitigation selected, and a factor-of-safety summary table with the governing case identified.

Week 6

Site Characterization and Subsurface Exploration

  • Plan a subsurface exploration program from a stated structure type: boring count, depth, spacing, and in-situ tests justified.

  • Read and critique a boring log and CPT sounding: identify strata, groundwater, sample disturbance, and any inconsistencies.

  • Specify laboratory tests for a given design question and state the acceptance criteria for each.

  • Assess liquefaction potential and site class for a sand profile using penetration resistance and groundwater depth.

Your checkpoint

A written exploration plan for one building and one embankment project, including a boring layout sketch you draw, a test schedule table, and a seismic site class determination.

Week 7

Geotechnical Analysis, Design, and Construction Considerations & Site Characterization and Subsurface Exploration

  • Interpret a geotechnical report's recommendations and translate them into construction specifications and verification testing.

  • Identify ground improvement methods matched to a stated problem and justify the selection quantitatively.

  • Describe construction observation and instrumentation programs: what is monitored, at what frequency, and what triggers action.

  • Evaluate dewatering and excavation support needs for a below-grade structure, including heave and piping checks.

Your checkpoint

A two-page construction-phase memo for one project covering specification items, verification testing, instrumentation thresholds, and a monitoring frequency table.

Week 8

Shallow and Deep Foundations & Earth Retaining Structures and Slope Stability

  • Re-work every missed problem from weeks 1 through 7 and write a corrected solution for each.

  • Complete a full-length timed practice exam you author from your own notes, at exam pace.

  • Review the highest-frequency failure modes you logged and confirm each is now resolved.

  • Consolidate all reference equations and decision rules into a single indexed sheet you can navigate in under 30 seconds.

Your checkpoint

Full-length timed mock exam completed with a 75% or better score, plus a one-page error log listing every remaining weak topic and the reference page that resolves it.

Milestones

Week 2: Can size a footing and compute settlement for a layered profile cold, without notes, in under 15 minutes per problem, scoring 80% or better on the self-written week 2 quiz.

Week 4: Can run a complete retaining wall stability package (pressures, overturning, sliding, bearing) start to finish with correct units and no missing checks, and clears 80% on a mixed foundations/retaining quiz.

Week 6: Can read an unfamiliar boring log and CPT and produce a defensible exploration plan, site class, and test schedule in 30 minutes or less.

Week 8: Mock exam scored at 75% or better, with no single domain below 65% and an error log written covering every remaining gap.