Centrifugal Chiller With Both Approaches Elevated
A 500-ton water-cooled centrifugal chiller (R-134a) is rated 0.55 kW/ton at AHRI conditions. At a measured 400-ton load the operator logs: chilled water 54°F in/44°F out; refrigerant saturation 36°F; condenser water 85°F in/95°F out; refrigerant saturation 101°F; compressor 260 kW; oil pressure and level normal; no surge or abnormal noise. Design approach is 2°F on both bundles. The condenser is served by an open cooling tower with a sidestream filter and a water-treatment contract. The chiller has not been opened in five years and the purge unit runs intermittently. The owner is deciding between a tube cleaning and a new chiller.
1. Compute both approaches and the actual kW/ton, then test the readings for internal consistency.
Read the worked answer
Approaches
- Evaporator approach = leaving chilled water − evaporating saturation = 44 − 36 = 8°F (design 2°F)
- Condenser approach = condensing saturation − leaving condenser water = 101 − 95 = 6°F (design 2°F)
- Excess lift ≈ (8 − 2) + (6 − 2) = 12°F
Efficiency
kW/ton = 260/400 = 0.65 kW/ton, versus 0.55 rated - an 18% penalty.
Consistency check
The industry rule of thumb is roughly 1.5-2% compressor kW per °F of excess saturated lift. Twelve degrees of excess lift predicts 18-24% penalty; the measured 18% sits at the low end of that band. The kW reading and the two approach readings tell the same story, so this is not a single drifting temperature sensor. A bad sensor would move one approach without moving the kW in the direction and magnitude predicted.
2. What else must be checked to separate tube fouling from non-condensables, overcharge, or low water flow?
Read the worked answer
Evaporator approach elevated can come from: fouled evaporator tubes, low refrigerant charge, or low evaporator water flow. Check chilled-water flow (pressure drop across the bundle versus the manufacturer's curve, plus the pump curve and the balance valve position) and the refrigerant liquid level and sight glass. Low charge typically lowers the condenser approach while raising the evaporator approach, which is not what is being seen here.
Condenser approach elevated can come from: fouled condenser tubes, non-condensables, overcharge, or low condenser water flow. Check condenser water flow and tower performance, then:
- Non-condensables: purge run time and history. A purge that runs continuously with a high discharge pressure and normal-to-high subcooling points to air in the machine.
- Overcharge: liquid subcooling well above the manufacturer's expected value (for example above 15-20°F at these conditions) with a high condenser approach.
- Fouling: normal subcooling, no purge activity, normal flows, and a documented history of no mechanical cleaning on an open tower for five years.
Because both approaches are elevated, the leading hypothesis is fouled tubes on both bundles. Overcharge alone would not raise the evaporator approach, and non-condensables alone would not either. Confirm with an eddy-current or brush inspection before spending anything on refrigerant-side work.
3. Frame the economics and give the owner a decision sequence.
Read the worked answer
Penalty
- Energy: 0.10 kW/ton × 400 tons = 40 kW continuous at this load. At 2,000 equivalent full-load hours: 80,000 kWh/yr × $0.11 ≈ $8,800/yr.
- Demand: 40 kW × roughly $12/kW-month × 12 ≈ $5,800/yr, depending on the tariff.
- Total avoided cost is about $14,000-15,000/yr with the approaches restored.
Decision sequence (cheapest and most diagnostic first)
- Verify water flows on both bundles and confirm the tower is delivering design condenser water temperature. Low flow mimics fouling exactly and costs nothing to fix.
- Check refrigerant subcooling and purge run time to rule in or out overcharge and non-condensables.
- Pull the heads and brush or eddy-current both bundles. A cleaning on a 500-ton machine typically runs $20,000-40,000, so the payback against $14,000/yr is under three years - and it restores capacity the owner is currently buying from a spare machine.
- Fix the root cause: open towers without effective mechanical cleaning foul regardless of chemistry. Add annual approach trending to the O&M contract and alarm on a 1°F rise in either approach; that is the cheapest reliability measure available.
On replacement: an 18% efficiency penalty does not justify a new chiller. Replacement becomes defensible only if the tube inspection finds erosion, wall loss, or a failed tube sheet, or if the machine cannot be brought back within about 1°F of design approach after cleaning.