Quick reference

Fundamental Principles and Concepts of IACS

  • Purdue model levels: 0 process, 1 basic control, 2 supervisory control, 3 site operations, 3.5 DMZ, 4 enterprise, 5 external; conduits exist only between adjacent or explicitly justified levels.

  • ISA/IEC 62443 defines four security requirements: FR1 identification and authentication control, FR2 use control, FR3 system integrity, FR4 data confidentiality, FR5 restricted data flow, FR6 timely response to events, FR7 resource availability - seven FRs total; memorise FR1–FR7 numbering.

  • Security Levels SL0–SL4 describe protection against increasing attacker capability: SL1 casual/unintentional, SL2 intentional with simple means and low resources, SL3 sophisticated with moderate resources, SL4 state-sponsored with extended resources.

  • Foundational Requirements map to Security Levels through system requirements (SR) and requirement enhancements (RE); a component's SL capability is not the same as its achieved SL in a given zone.

  • Zone = grouping of assets sharing common security requirements; Conduit = controlled communication path between zones. Zones are defined by risk, not by network topology alone.

  • IACS priority order is safety, availability, integrity, confidentiality - the inverse of typical IT ordering, which places confidentiality first.

  • The 62443 series structure: 1-x general (terminology, metrics, lifecycle), 2-x asset owner (policies, patch management), 3-x system integrator (system security requirements, SL verification), 4-x component supplier (component requirements, technical security requirements).

  • Defence in depth means independent, layered countermeasures so a single failed control does not expose the process; compensating controls must be documented when a required SR cannot be met.

  • OT constraints that drive design: long asset lifetimes (15–25 years), deterministic real-time behaviour, proprietary protocols, unpatchable legacy devices, and safety instrumented systems that must not be scanned intrusively.

Quick reference

Applying ISA/IEC 62443 for Uptime, Resilience, and Critical Infrastructure

  • Risk assessment per 62443-3-2 produces target SLs per zone and conduit; SL target is derived from consequence severity and threat likelihood, then compared against achieved SL from 62443-3-3 requirements.

  • The IACS security lifecycle (62443-2-4 / 4-1) has phases: assess, design, implement, operate, maintain, decommission - with verification evidence required at each transition.

  • Gap analysis output is a comparison of required SR/RE against implemented controls; unmet requirements are closed by remediation or by a formally risk-accepted compensating control.

  • SL verification (62443-3-3) uses four requirement types: SR, RE, capability (CL), and achieved - component capability must meet or exceed the zone target.

  • Patch management for OT: test in a representative lab, schedule within maintenance windows, maintain rollback images, and apply virtual patching or compensating controls when a vendor patch is unavailable.

  • Account and access controls: unique accounts, least privilege, role-based access, session lockout, and removal of shared and vendor-default credentials before commissioning.

  • Event monitoring must not degrade control traffic - use passive network monitoring, span ports, or unidirectional gateways rather than active scanning of Level 0–2 assets.

  • Business continuity for IACS requires documented manual fallback procedures and tested recovery of configuration backups, since restoring a control system is not equivalent to restoring an IT server.

  • Conduit design rules: terminate at a DMZ, deny by default, allow only required protocols and directions, and log all traffic crossing the conduit boundary.